NY20260020
BuildingHeavyHighwayResidentialDavis-Bacon Act general wage determination for building, heavy, highway, residential construction in New York.
Track NY20260020
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0091-001 Effective 06/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| INSULATOR/ASBESTOS WORKER (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $46.62 | $49.30 | $95.92 |
| HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS) | $46.62 | $49.30 | $95.92 |
BRNY0005-005 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER: BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (BUILDING/RESIDENTIAL CONSTRUCTION) | $47.44 | $38.00 | $85.44 |
CARP0279-004 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTERS : (BUILDING AND HEAVY & HIGHWAY CONSTRUCTION) | $50.12 | $31.73 | $81.85 |
| CARPENTERS (RESIDENTIAL) | $32.60 | $20.69 | $53.29 |
CARP0740-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $60.83 | $58.03 | $118.86 |
CARP1556-006 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| DOCK BUILDER & PILEDRIVERMEN | $60.59 | $55.84 | $116.43 |
CARP1556-007 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| DIVER TENDER | $55.00 | $55.84 | $110.84 |
| DIVER | $75.46 | $55.84 | $131.30 |
CARP1556-010 Effective 07/01/2019 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPE BENDING MACHINE OPERATOR | $54.63 | $50.98 | $105.61 |
ELEC1249-004 Effective 05/05/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 | $107.51 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | $33.82 | $96.96 |
ELEV0001-002 Effective 03/17/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELEVATOR MECHANIC (MODERNIZATION AND REPAIR) GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED | $59.09 | $45.56 | $104.65 |
| ELEVATOR MECHANIC (ELEVATOR CONSTRUCTOR) GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED | $75.14 | $47.45 | $122.59 |
ELEV0138-002 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELEVATOR MECHANIC (THE TOWN OF STONY POINT) REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $76.12 | $38.98 | $115.10 |
ENGI0825-012 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 1 | $61.72 | $37.50 | $99.22 |
| POWER EQUIPMENT OPERATORS: BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION- GROUP 2 ""A"" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRYALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 5 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANING; HOISTS: (ALL TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT,CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM RATE TO BE APPLIED IF HOIST"") HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO- BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; ""STRADDLE"" CARRIER, ROSS AND SIMILAR TYPES; VACUM TRUCK; WHIP HAMMER; WINCH TRUCKS(HOISTING).. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM $0 .50 INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $60.13 | $37.50 | $97.63 |
| POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 6 HELICOPTER PILOTS NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, AND VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $63.54 | $37.50 | $101.04 |
| POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 5 OILER, TIRE REPAIR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, AND VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $52.88 | $37.50 | $90.38 |
| POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE, FILL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (WELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TWO OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, AND VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $56.59 | $37.50 | $94.09 |
| POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER;AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINE (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON SITE; BELT CONVEYOR SYSTEM; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (RAILROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS); COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE); CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL (DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS (MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS; ELEVATOR; FIREMAN; FORKLIFTS (ECONOMBILE, LULL, AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS (1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN CONJUCTION WITH GENERATORS); HOISTS (ROOF, TUGGEAERIAL PLATFORM HOIST AND HOUSE CARS), HOPPERS, HOPPERS DOORS (POWER OPERATED); HYDRO-BLASTER (WHERE REQUIRED); LADDERS (MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS (EXCEPTING PAVING MIXERS); MOTOR PATROLS AND GRADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED; PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER PUMP (REGARDLESS OF SIZE); POST HOLD DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINES (POWER); ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS; TUG CAPTAIN; VIBRATING PLANTS (USED IN CONJUCTION WITH UNLOADING); WELDER AND REPAIR MECHANICS; CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE OPERATOR, ULTRA HIGH PRESSURE WATERJET CUTTTING TOOL SYSTEM OPERATOR; VACUUM BLASTING MACHINE OPERATOR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, AND VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $58.22 | $37.50 | $95.72 |
ENGI0825-013 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 6: HELICOTER PILOT NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $64.28 | $37.50 | $101.78 |
| POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. . | $53.34 | $37.50 | $90.84 |
| POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FARM TRACTORS. NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. . | $57.06 | $37.50 | $94.56 |
| POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHANIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $58.56 | $37.50 | $96.06 |
| POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 2: ""A"" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. . | $60.70 | $37.50 | $98.20 |
| POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES. PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. . | $62.35 | $37.50 | $99.85 |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETC WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. NOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $68.37 | $37.50 | $105.87 |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 5: OILER NOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $54.07 | $37.50 | $91.57 |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STEAM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL ""DUAL PURPOSE"" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB SITE OR IN CONJUCTION WITH THE JOB SITE. NOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $61.28 | $37.50 | $98.78 |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 3: HELICOPTER PILOT NOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $64.85 | $37.50 | $102.35 |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETC WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. NOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $69.96 | $37.50 | $107.46 |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 7 HELICOPTER PILOT NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $65.74 | $37.50 | $103.24 |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 6 OILER, STADDLE CARRIER HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $53.34 | $37.50 | $90.84 |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE. HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $57.10 | $37.50 | $94.60 |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMAN; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS. NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $58.63 | $37.50 | $96.13 |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS. HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $61.29 | $37.50 | $98.79 |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $68.58 | $37.50 | $106.08 |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $70.24 | $37.50 | $107.74 |
IRON0417-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY | $42.63 | $53.70 | $96.33 |
LABO0754-001 Effective 06/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER GROUP 4 (HEAVY & HIGHWAY CONSTRUCTION) FLAG PERSON FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRESIDENT'S BIRTHDAY, PRESIDENTAL ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $42.60 | $28.15 | $70.75 |
| LABORER GROUP 3 (HEAVY & HIGHWAY CONSTRUCTION) NIPPER, POWER BUGGY OPERATOR; PLASTER TENDER; MIXER MAN (BY MACHINE OR HAND); SCAFFOLD RUNWAY MAN; POWER SAW; BRUSH KING; STEEL ROD CARRIER; JACK HAMMER; WAGON DRILLER; JIB RIG OPERATOR; PAVEMENT BREAKER; VIBRATOR MAN; BIT GRINDER; POWDER MAN; RAMSET OPERATOR; RIP RAP AND DRY STONE LAYER; CEMENT SPRAY MAN; GUNNITE NOZZLE MAN; SPRAY AND NOZZLE MAN ON MULCHING AND SEEDING MACHINE; SAND BLASTER; CONCRETE SAW; ALL OTHER MACHINE OR SEMI-SKILLED MEN; ASBESTOS AND HAZARDOUS WASTE REMOVAL; CONCRETE LABORER; BUILDING LABORER; MASON TENDER; CARPENTER TENDER; PIPE LAYER (ALL TYPES); SIGNAL MAN; GABION BASKET ASSEMBLER; BULL FLOAT MAN; FORM SETTER; LINER; JOINT SETTER; SHEETER; TIP CONCRETE MAN; STUD OR RIVETING GUN MAN; ALL SCALERS; ASPHALT MEN (ALL TYPES); RAIL AND FENCE (ALL TYPES); CORE DRILLER; WRECKING AND DEMOLITION MAN; BAR MAN; SEEDER; PLANTER; LANDSCAPE MEN (ALL TYPES), AX MAN; PIT AND DUMP MEN; ROAD LABORER INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRESIDENT'S BIRTHDAY, PRESIDENTAL ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $46.10 | $28.15 | $74.25 |
| TRACK OPERATOR; JOY DRILL OPERATOR FOOTNOTE: LABORER GROUP 2 (HEAVY & HIGHWAY CONSTRUCTION) A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRESIDENT'S BIRTHDAY, PRESIDENTAL ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $50.25 | $28.15 | $78.40 |
| TRACK OPERATOR; JOY DRILL OPERATOR FOOTNOTE: LABORER GROUP 1 (HEAVY & HIGHWAY CONSTRUCTION) BLASTERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRESIDENT'S BIRTHDAY, PRESIDENTAL ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $52.35 | $28.15 | $80.50 |
| TRACK OPERATOR; JOY DRILL OPERATOR FOOTNOTE: LABORER CATEGORY D: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) | $50.25 | $28.15 | $78.40 |
| TRACK OPERATOR; JOY DRILL OPERATOR FOOTNOTE: LABORER CATEGORY C: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) | $50.25 | $28.15 | $78.40 |
| TRACK OPERATOR; JOY DRILL OPERATOR FOOTNOTE: LABORER CATEGORY B: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) | $50.25 | $28.15 | $78.40 |
| TRACK OPERATOR; JOY DRILL OPERATOR FOOTNOTE: LABORER CATEGORY A: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) | $50.25 | $28.15 | $78.40 |
PAIN0009-010 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $49.20 | $57.20 | $106.40 |
PAIN0155-004 Effective 05/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: (SPRAY RATE) | $40.14 | $24.66 | $64.80 |
| PAINTERS: (PAINTER/PAPERHANGER) | $39.14 | $24.66 | $63.80 |
| PAINTERS: (LEAD ABATEMENT WORK) | $39.14 | $24.66 | $63.80 |
| PAINTERS: (DRYWALL FINISHER) | $39.14 | $24.66 | $63.80 |
PAIN0806-001 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: (STRUCTURAL STEEL AND BRIDGE) | $56.25 | $55.14 | $111.39 |
PLUM0373-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (REFRIGERATION) | $41.99 | $37.38 | $79.37 |
| PLUMBER (PLUMBERS AND STEAMFITTERS) | $53.20 | $46.57 | $99.77 |
SFNY0669-002 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER | $57.20 | $32.66 | $89.86 |
SHEE0038-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER | $55.29 | $47.43 | $102.72 |
TEAM0445-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVERS: GROUP 1 DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGONS AND SIMILAR EQUIPMENT (EXCEPT WHEN HOOKED TO SCRAPERS), I-BEAM AND POLE TRAILERS, DRIVERS OF ROAD OIL DISTRIBUTORS, TIRE TRUCKS AND TRACTORS AND TRAILERS WITH 5 AXLES AND OVER, ARTICULATED BACK DUMPS AND ARTICULATED WATER TRUCKS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $37.91 | $46.37 | $84.28 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/30/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in New York.
Get notified when NY20260020 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.