ASBE0030-003 Effective 05/01/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE, & MECHANICAL SYSTEM INSULATION) $43.25 $27.29 $70.54
BRNY0002-018 Effective 07/01/2017
Trade Rate Fringe Total
BRICKLAYER (INCLUDES POINTING, CAULKING, AND CLEANING) $33.45 $20.14 $53.59
BRNY0002-020 Effective 07/01/2018
Trade Rate Fringe Total
TILE SETTER $31.81 $17.50 $49.31
CARP1163-003 Effective 07/01/2021
Trade Rate Fringe Total
MILLWRIGHT $30.20 $23.83 $54.03
ELEC0910-003 Effective 04/01/2025
Trade Rate Fringe Total
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS, HVAC/TEMPERATURE CONTROLS AND SOUND AND COMMUNICATION SYSTEMS) $43.50 $28.38 $71.88
ENGI0158-001 Effective 07/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: CRANE $49.61 $31.85 $81.46
LABO1822-008 Effective 07/01/2023
Trade Rate Fringe Total
LABORER: MASON TENDER - BRICK $27.03 $25.45 $52.48
LABORER: COMMON OR GENERAL $27.03 $25.45 $52.48
LABORER (MASON TENDER - CEMENT/CONCRETE) $27.03 $25.45 $52.48
PAIN0038-001 Effective 05/01/2025
Trade Rate Fringe Total
PAINTER (SPRAY) $29.90 $25.36 $55.26
DRYWALL FINISHER/TAPER $30.90 $25.36 $56.26
PLUM0073-004 Effective 05/01/2019
Trade Rate Fringe Total
PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) $31.43 $23.61 $55.04
ROOF0195-004 Effective 07/01/2025
Trade Rate Fringe Total
ROOFER $35.80 $25.99 $61.79
SFNY0669-003 Effective 01/01/2026
Trade Rate Fringe Total
SPRINKLER FITTER (FIRE SPRINKLERS) $45.06 $30.71 $75.77
SUNY2016-001 Effective 08/02/2017
Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDING INSTALLATION OF HVAC DUCT, METAL FLASHING, AND SIDING (ALUMINUM, METAL, VINYL) $28.11 $17.75 $45.86
PLUMBER, INCLUDES HVAC PIPE INSTALLATION $33.72 $16.03 $49.75
PAINTER (BRUSH AND ROLLER) $22.32 $13.95 $36.27
OPERATOR: ROLLER $27.74 $5.89 $33.63
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) $30.19 $17.42 $47.61
OPERATOR: FORKLIFT $33.14 $21.04 $54.18
OPERATOR: BULLDOZER $31.60 $21.52 $53.12
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $36.17 $17.76 $53.93
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $33.62 $17.98 $51.60
LABORER: PIPELAYER $20.47 $0.00 $20.47
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $20.89 $10.46 $31.35
LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) $29.18 $17.72 $46.90
IRONWORKER, STRUCTURAL $29.41 $21.63 $51.04
IRONWORKER, REINFORCING $28.00 $21.43 $49.43
IRONWORKER, ORNAMENTAL $28.70 $22.02 $50.72
GLAZIER $29.52 $11.47 $40.99
CEMENT MASON/CONCRETE FINISHER $30.61 $5.82 $36.43
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $25.70 $15.85 $41.55

Modification History

Modification Publication Date
1 01/30/2026
2 05/18/2026

Counties Covered

This wage determination applies to 1 county in New York.

Get notified when NY20260022 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.