NY20260038
HeavyHighwayDavis-Bacon Act general wage determination for heavy, highway construction in New York.
Track NY20260038
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BOIL0175-001 Effective 01/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $35.23 | $26.61 | $61.84 |
BRNY0002-007 Effective 07/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER (OSWEGO CHAPTER) | $34.15 | $19.71 | $53.86 |
| BRICKLAYER (OSWEGO CHAPTER) | $34.15 | $19.71 | $53.86 |
| TILE SETTER (OSWEGO CHAPTER) | $32.92 | $20.42 | $53.34 |
| TILE FINISHER (OSWEGO CHAPTER) | $26.46 | $19.64 | $46.10 |
| PLASTERER (OSWEGO CHAPTER) | $34.15 | $19.71 | $53.86 |
| BRICKLAYER (OSWEGO CHAPTER) | $34.15 | $19.71 | $53.86 |
| TILE SETTER (OSWEGO CHAPTER) | $32.92 | $20.42 | $53.34 |
| TILE FINISHER (OSWEGO CHAPTER) | $26.46 | $19.64 | $46.10 |
BRNY0002-007 Effective 07/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER (OSWEGO CHAPTER) | $34.15 | $19.71 | $53.86 |
| BRICKLAYER (OSWEGO CHAPTER) | $34.15 | $19.71 | $53.86 |
| TILE SETTER (OSWEGO CHAPTER) | $32.92 | $20.42 | $53.34 |
| TILE FINISHER (OSWEGO CHAPTER) | $26.46 | $19.64 | $46.10 |
| PLASTERER (OSWEGO CHAPTER) | $34.15 | $19.71 | $53.86 |
| BRICKLAYER (OSWEGO CHAPTER) | $34.15 | $19.71 | $53.86 |
| TILE SETTER (OSWEGO CHAPTER) | $32.92 | $20.42 | $53.34 |
| TILE FINISHER (OSWEGO CHAPTER) | $26.46 | $19.64 | $46.10 |
BRNY0002-017 Effective 06/01/2018 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKSGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED ONE DAY BEFORE AND ONE DAY AFTER THE HOLIDAY) | $37.23 | $19.51 | $56.74 |
CARP0277-003 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (PILEDRIVERS) | $39.52 | $27.16 | $66.68 |
| CARPENTER (CARPENTERS) | $39.52 | $27.16 | $66.68 |
ELEC0043-008 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (ELECTRICIANS) | $50.50 | $35.03 | $85.53 |
| ELECTRICIAN (CABLE SPLICING) | $55.55 | $35.03 | $90.58 |
ELEC1249-004 Effective 05/05/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 | $107.51 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | $33.82 | $96.96 |
ENGI0158-020 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 3 | $51.69 | $33.40 | $85.09 |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $54.97 | $33.40 | $88.37 |
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORK LIFT, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $55.85 | $33.40 | $89.25 |
IRON0060-007 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (STRUCTURAL, ORNAMENTAL, REINFORCING, PRE-CAST CONCRET ERECTOR, MACHINERY MOVER & RIGGER, FENCE ERECTOR, STONE DERRIKMAN, WELDER, SHEETER, SHEETER BUCKER-UP) | $37.16 | $30.68 | $67.84 |
LABO0633-001 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (NUCLEAR SITE OR RELATED WORK) | $31.45 | $23.10 | $54.55 |
| LABORER (HAZARDOUS WASTE REMOVAL, ASBESTOS AND TOXIC) | $33.95 | $23.10 | $57.05 |
LABO0633-002 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER GROUP 3 ALL ROCK OR DRILL MACHINE OPERATOR (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR, ASPHALT RAKER, POWDERMAN. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $36.70 | $25.70 | $62.40 |
PAIN0004-023 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRIDGES (TOWNSHIPS OF AMBOY, CONSTANTIA, ONEIDA LAKE AND WILLIAMSTOWN) | $42.06 | $30.59 | $72.65 |
PAIN0004-029 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: PAPERHANGING, VINYL & TAPERS (EXCLUDING THE TOWNSHIPS OF AMBOY, CONSTANTIA, ONEIDA LAKE AND WILLIAMSTOWN) | $30.90 | $26.25 | $57.15 |
| PAINTERS: METALIZING (EXCLUDING THE TOWNSHIPS OF AMBOY, CONSTANTIA, ONEIDA LAKE AND WILLIAMSTOWN) | $29.90 | $26.25 | $56.15 |
| PAINTERS: BRUSH & ROLL (EXCLUDING THE TOWNSHIPS OF AMBOY, CONSTANTIA, ONEIDA LAKE AND WILLIAMSTOWN) | $29.90 | $26.25 | $56.15 |
PAIN0677-002 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $30.00 | $27.59 | $57.59 |
PLUM0073-001 Effective 05/01/2019 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER, PIPEFITTER, STEAMFITTER (HEATING, PLUMBING, AIR CONDITIONING, REFRIGERATION AND PIPEFITTING) | $32.90 | $23.61 | $56.51 |
ROOF0195-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $35.80 | $25.99 | $61.79 |
SFNY0669-001 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER | $47.85 | $28.94 | $76.79 |
SHEE0058-005 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER, INCL. HVAC DUCT (PROJECTS WITH SHEETMETAL WORK CONTRACTS TOTALING $10 MILLION OR LESS) | $36.29 | $23.31 | $59.60 |
| SHEET METAL WORKER, INCL. HVAC DUCT (PROJECTS OVER $10 MILLION) | $42.29 | $23.31 | $65.60 |
SUNY1996-003 Effective 01/12/1996 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| FLOOR LAYER: CARPET | $15.22 | $2.09 | $17.31 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/30/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in New York.
Get notified when NY20260038 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.