OK20260037
BuildingDavis-Bacon Act general wage determination for building construction in Oklahoma.
Track OK20260037
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BOIL0592-001 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $33.70 | $24.41 | $58.11 |
ELEC1141-027 Effective 06/01/2019 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (LOW VOLTAGE WIRING, ALARM INSTALLATION, AND SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION ONLY) | $21.60 | $0.00 | $21.60 |
ENGI0627-019 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 |
IRON0048-009 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL | $32.10 | $17.38 | $49.48 |
PLUM0344-021 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (INCLUDING INSTALLATION OF HVAC ELECTRICAL/TEMPERATURE CONTROLS AND HVAC PIPE INSTALLATION) | $41.00 | $16.03 | $57.03 |
SHEE0124-014 Effective 07/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $33.38 | $16.36 | $49.74 |
SUOK2012-015 Effective 06/18/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $21.52 | $6.00 | $27.52 |
| ROOFER | $15.00 | $0.29 | $15.29 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $18.00 | $3.23 | $21.23 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.32 | $0.00 | $12.32 |
| OPERATOR: FORKLIFT | $18.02 | $0.00 | $18.02 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.83 | $0.00 | $16.83 |
| LABORER: PIPELAYER | $11.65 | $0.00 | $11.65 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.04 | $0.00 | $13.04 |
| LABORER: MASON TENDER - BRICK | $12.00 | $0.00 | $12.00 |
| LABORER: COMMON OR GENERAL | $11.58 | $0.77 | $12.35 |
| GLAZIER | $15.27 | $1.46 | $16.73 |
| FORM WORKER | $13.79 | $0.92 | $14.71 |
| FLOOR LAYER (HARDWOOD AND CARPET) | $18.74 | $1.10 | $19.84 |
| ELECTRICIAN | $21.51 | $6.27 | $27.78 |
| CEMENT MASON/CONCRETE FINISHER | $14.50 | $0.00 | $14.50 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $16.19 | $0.96 | $17.15 |
| CARPENTER (DRYWALL HANGING ONLY) | $14.96 | $0.00 | $14.96 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $16.20 | $0.00 | $16.20 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Oklahoma.
Get notified when OK20260037 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.