OK20260040

Building

Davis-Bacon Act general wage determination for building construction in Oklahoma.

Modification 1, revised 05/18/2026 29 trade rates 1 county View on SAM.gov

Track OK20260040

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

BOIL0592-001 Effective 01/01/2025
Trade Rate Fringe Total
BOILERMAKER $33.70 $24.41 $58.11
ELEC1141-007 Effective 05/26/2025
Trade Rate Fringe Total
ELECTRICIAN $41.40 $13.14 $54.54
ELEC1141-028 Effective 05/26/2025
Trade Rate Fringe Total
ELECTRICIAN (LOW VOLTAGE WIRING, ALARM INSTALLATION, AND SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION ONLY) $24.26 $9.76 $34.02
ENGI0627-019 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER $34.07 $19.05 $53.12
POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) $35.40 $19.05 $54.45
POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19
POWER EQUIPMENT OPERATOR: GROUP 10 OILER $27.25 $19.05 $46.30
POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14
IRON0048-009 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER, STRUCTURAL $32.10 $17.38 $49.48
PLUM0344-006 Effective 07/01/2025
Trade Rate Fringe Total
PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) $41.00 $16.03 $57.03
PLUM0344-021 Effective 07/01/2025
Trade Rate Fringe Total
PIPEFITTER (INCLUDING INSTALLATION OF HVAC ELECTRICAL/TEMPERATURE CONTROLS AND HVAC PIPE INSTALLATION) $41.00 $16.03 $57.03
SHEE0124-014 Effective 07/01/2021
Trade Rate Fringe Total
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) $33.38 $16.36 $49.74
SUOK2012-020 Effective 06/18/2012
Trade Rate Fringe Total
SPRINKLER FITTER (FIRE SPRINKLERS) $21.52 $6.00 $27.52
ROOFER $15.00 $0.29 $15.29
PAINTER: BRUSH, ROLLER AND SPRAY $12.32 $0.00 $12.32
OPERATOR: FORKLIFT $18.02 $0.00 $18.02
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.83 $0.00 $16.83
LABORER: PIPELAYER $11.65 $0.00 $11.65
LABORER: MASON TENDER - CEMENT/CONCRETE $13.04 $0.00 $13.04
LABORER: MASON TENDER - BRICK $12.00 $0.00 $12.00
LABORER: COMMON OR GENERAL $11.00 $0.00 $11.00
GLAZIER $15.27 $1.46 $16.73
FORM WORKER $16.79 $3.12 $19.91
FLOOR LAYER (HARDWOOD AND CARPET) $18.74 $1.10 $19.84
CEMENT MASON/CONCRETE FINISHER $14.50 $0.00 $14.50
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK $16.82 $2.82 $19.64
CARPENTER (DRYWALL HANGING ONLY) $14.96 $0.00 $14.96
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) $16.24 $0.00 $16.24
BRICKLAYER $20.00 $0.00 $20.00

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Oklahoma.

Get notified when OK20260040 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.