Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

BROK0005-004 Effective 06/01/2023
Trade Rate Fringe Total
BRICKLAYER $26.92 $13.09 $40.01
ELEC1141-011 Effective 05/26/2025
Trade Rate Fringe Total
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) $41.40 $13.14 $54.54
ENGI0627-020 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT $28.77 $19.05 $47.82
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER $34.07 $19.05 $53.12
POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) $35.40 $19.05 $54.45
POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19
POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER $27.25 $19.05 $46.30
POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14
IRON0048-014 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER: ORNAMENTAL AND STRUCTURAL $32.10 $17.38 $49.48
PLUM0344-006 Effective 07/01/2025
Trade Rate Fringe Total
PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) $41.00 $16.03 $57.03
PLUM0344-024 Effective 07/01/2025
Trade Rate Fringe Total
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $41.00 $16.03 $57.03
ROOF0143-001 Effective 07/01/2024
Trade Rate Fringe Total
ROOFER $26.30 $10.34 $36.64
SHEE0124-010 Effective 07/01/2021
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) $33.38 $16.36 $49.74
SUOK2012-023 Effective 07/30/2012
Trade Rate Fringe Total
TRUCK DRIVER: DUMP AND FLATBED TRUCK $11.60 $0.00 $11.60
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION $21.82 $0.00 $21.82
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $12.91 $0.00 $12.91
OPERATOR: LOADER (FRONT END) $16.18 $0.00 $16.18
OPERATOR: GRADER/BLADE $14.28 $1.70 $15.98
OPERATOR: BULLDOZER $20.64 $2.35 $22.99
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.25 $4.35 $25.60
LABORER: PIPELAYER $12.39 $0.00 $12.39
LABORER: MASON TENDER - CEMENT/CONCRETE $13.00 $1.91 $14.91
LABORER: MASON TENDER - BRICK $12.00 $0.00 $12.00
LABORER: COMMON OR GENERAL $9.31 $0.00 $9.31
IRONWORKER, REINFORCING $17.11 $0.00 $17.11
ELECTRICIAN (LOW VOLTAGE WIRING) $20.08 $5.43 $25.51
DRYWALL FINISHER/TAPER $13.80 $0.00 $13.80
CEMENT MASON/CONCRETE FINISHER $16.72 $0.00 $16.72
CARPENTER, EXCLUDES DRYWALL HANGING $15.50 $2.80 $18.30
CARPENTER (DRYWALL HANGING ONLY) $15.50 $2.80 $18.30

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Oklahoma.

Get notified when OK20260043 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.