OK20260048
BuildingDavis-Bacon Act general wage determination for building construction in Oklahoma.
Track OK20260048
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BROK0005-004 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $26.92 | $13.09 | $40.01 |
CARP0216-002 Effective 01/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $29.15 | $11.81 | $40.96 |
CARP0329-003 Effective 01/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $27.79 | $10.05 | $37.84 |
ELEC1141-007 Effective 05/26/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $41.40 | $13.14 | $54.54 |
ELEC1141-029 Effective 05/26/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (LOW VOLTAGE WIRING AND ALARM INSTALLATION ONLY) | $24.26 | $9.76 | $34.02 |
ENGI0627-020 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | $28.77 | $19.05 | $47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 |
IRON0048-014 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $32.10 | $17.38 | $49.48 |
PLUM0344-012 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $41.00 | $16.03 | $57.03 |
PLUM0344-023 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION, EXCLUDING HVAC UNIT INSTALLATION) | $41.00 | $16.03 | $57.03 |
ROOF0143-001 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $26.30 | $10.34 | $36.64 |
SFOK0669-002 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $39.05 | $25.77 | $64.82 |
SHEE0124-010 Effective 07/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $33.38 | $16.36 | $49.74 |
SUOK2012-028 Effective 07/30/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | $11.60 | $0.00 | $11.60 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $19.45 | $6.38 | $25.83 |
| PLASTERER | $17.50 | $0.00 | $17.50 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $12.17 | $0.00 | $12.17 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $13.38 | $1.54 | $14.92 |
| OPERATOR: LOADER (FRONT END) | $16.18 | $0.00 | $16.18 |
| OPERATOR: GRADER/BLADE | $14.28 | $1.70 | $15.98 |
| OPERATOR: BULLDOZER | $20.64 | $2.35 | $22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.25 | $4.35 | $25.60 |
| LABORER: PLASTER TENDER | $12.00 | $0.00 | $12.00 |
| LABORER: PIPELAYER | $12.39 | $0.00 | $12.39 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 | $1.91 | $14.91 |
| LABORER: MASON TENDER - BRICK | $12.00 | $0.00 | $12.00 |
| LABORER: LANDSCAPE | $13.75 | $0.00 | $13.75 |
| LABORER: COMMON OR GENERAL | $11.40 | $0.00 | $11.40 |
| IRONWORKER, REINFORCING | $17.11 | $0.00 | $17.11 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $21.64 | $6.46 | $28.10 |
| GLAZIER | $12.02 | $2.42 | $14.44 |
| FENCE ERECTOR | $16.00 | $0.00 | $16.00 |
| DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | $14.08 | $0.00 | $14.08 |
| DRYWALL FINISHER/TAPER | $14.25 | $0.00 | $14.25 |
| CEMENT MASON/CONCRETE FINISHER | $16.72 | $0.00 | $16.72 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $16.31 | $2.96 | $19.27 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $14.45 | $0.00 | $14.45 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/23/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Oklahoma.
Get notified when OK20260048 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.