OK20260049
BuildingDavis-Bacon Act general wage determination for building construction in Oklahoma.
Track OK20260049
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BROK0005-004 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $26.92 | $13.09 | $40.01 |
CARP0216-002 Effective 01/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $29.15 | $11.81 | $40.96 |
CARP0329-003 Effective 01/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $27.79 | $10.05 | $37.84 |
ELEC1141-010 Effective 05/26/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS) | $41.40 | $13.14 | $54.54 |
ELEC1141-030 Effective 05/26/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $24.26 | $9.76 | $34.02 |
ENGI0627-023 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH LESS THAN 50 TON CAPACITY AND CRANES (AS RATED BY MFG.) LESS THAN 3CU. YD., INCLUDING ALL OVERHEAD CRANS TYPES, GOLDHOFER/MODULAR POWERED TRAILER, MOBILE GANTRY SYSTEM, HEAVY DUTY MECHANIC, WELDER OVERHEAD MONORAIL TYPES CRANE, PANEL BOARD BATCH, PLANT OPERATOR, PILEDRIVER ENGINEER, DRAGLINE, CLAMSHELL SIDEBOOM OR SIMILAR TYPE EQUIPMENT, GRADALL, CHERRY PICKER, HOSIT (WHILE OPERATING 2 OR MORE DUMS); ALL HOIST (WHILE DOING STACK AND CHIMNEY WORK) POWER DRIVEN HOLE DIGGER WITH LESS THAN 30' MAST. VACUUMTRUCK, DOZER, LOADER OR HIGH LIFT (TRACK LOADER-NOT SKIDSTEER TYPE) AND BULLDOZER | $34.07 | $19.05 | $53.12 |
IRON0048-014 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $32.10 | $17.38 | $49.48 |
PLUM0344-006 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $41.00 | $16.03 | $57.03 |
PLUM0344-019 Effective 07/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $38.25 | $15.54 | $53.79 |
PLUM0344-024 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $41.00 | $16.03 | $57.03 |
ROOF0143-001 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $26.30 | $10.34 | $36.64 |
SFOK0669-002 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $39.05 | $25.77 | $64.82 |
SHEE0124-010 Effective 07/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $33.38 | $16.36 | $49.74 |
SUOK2012-029 Effective 07/30/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | $11.60 | $0.00 | $11.60 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $17.57 | $4.64 | $22.21 |
| PLASTERER | $16.10 | $0.00 | $16.10 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $12.42 | $0.00 | $12.42 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $13.38 | $1.54 | $14.92 |
| OPERATOR: LOADER (FRONT END) | $16.18 | $0.00 | $16.18 |
| OPERATOR: GRADER/BLADE | $14.28 | $1.70 | $15.98 |
| OPERATOR: FORKLIFT | $20.55 | $0.00 | $20.55 |
| OPERATOR: BULLDOZER | $20.64 | $2.35 | $22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.25 | $4.35 | $25.60 |
| LABORER: PLASTER TENDER | $11.00 | $0.00 | $11.00 |
| LABORER: PIPELAYER | $12.39 | $0.00 | $12.39 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 | $1.91 | $14.91 |
| LABORER: MASON TENDER - BRICK | $12.00 | $0.00 | $12.00 |
| LABORER: LANDSCAPE | $13.75 | $0.00 | $13.75 |
| LABORER: COMMON OR GENERAL | $11.70 | $0.00 | $11.70 |
| IRONWORKER, REINFORCING | $17.11 | $0.00 | $17.11 |
| GLAZIER | $12.02 | $2.42 | $14.44 |
| FENCE ERECTOR | $14.00 | $0.00 | $14.00 |
| ELECTRICIAN: ALARM INSTALLATION | $20.97 | $5.22 | $26.19 |
| DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | $14.38 | $0.00 | $14.38 |
| DRYWALL FINISHER/TAPER | $13.74 | $0.00 | $13.74 |
| CEMENT MASON/CONCRETE FINISHER | $16.75 | $0.00 | $16.75 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $16.61 | $3.00 | $19.61 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $14.98 | $0.00 | $14.98 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/23/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Oklahoma.
Get notified when OK20260049 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.