OR20260006
ResidentialDavis-Bacon Act general wage determination for residential construction in Oregon.
Track OR20260006
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ELEC0659-009 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $33.41 | $18.20 | $51.61 |
ENGI0701-017 Effective 01/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 6 LOADERS: (LESS THAN 1 CU YD.); GRADE CHECKER; ROLLER (NON-ASPHALT) | $45.81 | $16.90 | $62.71 |
LABO0737-005 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: (MASON TENDER-CEMENT/CONCRETE) | $43.79 | $17.05 | $60.84 |
LABO0737-009 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: (GENERAL LABORER) | $39.00 | $17.30 | $56.30 |
PLAS0555-003 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 | $66.44 |
SUOR2009-004 Effective 10/16/2009 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $14.41 | $0.00 | $14.41 |
| CARPENTER | $19.99 | $7.78 | $27.77 |
TEAM0037-008 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVERS: GROUP 7 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 80 CU. YDS. AND INCLUDING 100 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS | $36.82 | $18.30 | $55.12 |
| TRUCK DRIVERS: GROUP 6 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 60 CU. YDS. AND INCLUDING 80 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.57 | $18.30 | $54.87 |
| TRUCK DRIVERS: GROUP 5 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 50 CU. YDS. AND INCLUDING 60 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.35 | $18.30 | $54.65 |
| TRUCK DRIVERS: GROUP 4 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 30 CU. YDS. AND INCLUDING 50 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.08 | $18.30 | $54.38 |
| TRUCK DRIVERS: GROUP 3 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 10 CU. YDS. AND INCLUDING 30 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS | $35.74 | $18.30 | $54.04 |
| TRUCK DRIVERS: GROUP 2 DUMP TRCUKS/ARTICULATED DUMPS 6 CU TO 10 CU.; | $35.57 | $18.30 | $53.87 |
| TRUCK DRIVERS: GROUP 1 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: UP TO AND INCLUDING 10 CU. YDS | $35.41 | $18.30 | $53.71 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/23/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Oregon.
Get notified when OR20260006 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.