OR20260098

Building

Davis-Bacon Act general wage determination for building construction in Oregon.

Modification 1, revised 05/18/2026 33 trade rates 1 county View on SAM.gov

Track OR20260098

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0036-003 Effective 03/31/2025
Trade Rate Fringe Total
HEAT & FROST INSULATOR $62.02 $22.36 $84.38
BROR0001-005 Effective 06/01/2025
Trade Rate Fringe Total
BRICKLAYER $49.60 $25.15 $74.75
BROR0001-009 Effective 05/01/2025
Trade Rate Fringe Total
TILE SETTER $43.93 $21.81 $65.74
TILE FINISHER $32.68 $16.48 $49.16
CARP0503-001 Effective 06/01/2025
Trade Rate Fringe Total
DRYWALL HANGER $52.43 $17.01 $69.44
ELEC0280-001 Effective 01/01/2025
Trade Rate Fringe Total
ELECTRICIAN $56.46 $23.05 $79.51
ENGI0701-001 Effective 01/01/2024
Trade Rate Fringe Total
OPERATOR: LOADER $54.75 $16.90 $71.65
OPERATOR: GRADER/BLADE $54.75 $16.90 $71.65
OPERATOR: BULLDOZER $54.75 $16.90 $71.65
ENGI0701-041 Effective 01/01/2024
Trade Rate Fringe Total
OPERATOR: OILER $45.81 $16.90 $62.71
OPERATOR: FORKLIFT $45.81 $16.90 $62.71
ENGI0701-042 Effective 01/01/2024
Trade Rate Fringe Total
OPERATOR: ROLLER $50.27 $16.90 $67.17
ENGI0701-044 Effective 01/01/2024
Trade Rate Fringe Total
OPERATOR: CRANE (90-199 TON) $54.75 $16.90 $71.65
OPERATOR: CRANE (300-399 TON) $58.82 $16.90 $75.72
IRON0029-001 Effective 07/07/2025
Trade Rate Fringe Total
IRONWORKER $48.31 $34.52 $82.83
LABO0737-025 Effective 06/01/2024
Trade Rate Fringe Total
LABORER: MASON TENDER - CEMENT/CONCRETE $43.79 $17.05 $60.84
LABO0737-036 Effective 06/01/2024
Trade Rate Fringe Total
LABORER: HOD CARRIER $43.79 $17.05 $60.84
LABO0737-038 Effective 06/01/2024
Trade Rate Fringe Total
LABORER: PIPELAYER $40.41 $17.30 $57.71
PAIN0010-009 Effective 01/01/2025
Trade Rate Fringe Total
DRYWALL FINISHER/TAPER $45.52 $22.03 $67.55
PAIN0010-010 Effective 07/01/2025
Trade Rate Fringe Total
PAINTER $40.85 $16.68 $57.53
PAIN0740-001 Effective 07/01/2025
Trade Rate Fringe Total
GLAZIER $53.15 $23.21 $76.36
PLAS0555-007 Effective 06/01/2025
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $46.13 $20.31 $66.44
PLUM0290-001 Effective 04/01/2025
Trade Rate Fringe Total
PIPEFITTER $60.77 $34.72 $95.49
PLUM0290-002 Effective 04/01/2025
Trade Rate Fringe Total
PLUMBER $60.77 $34.72 $95.49
SHEE0016-004 Effective 07/01/2025
Trade Rate Fringe Total
SHEET METAL WORKER $45.09 $30.40 $75.49
SUOR2018-018 Effective 08/25/2023
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK $21.30 $5.66 $26.96
ROOFER $33.19 $0.00 $33.19
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) $35.76 $3.60 $39.36
OPERATOR: DRILL $27.54 $14.10 $41.64
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.43 $2.31 $22.74
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $37.38 $16.53 $53.91
LABORER: COMMON OR GENERAL $26.96 $14.18 $41.14
CARPENTER, EXCLUDES DRYWALL HANGING $28.17 $5.77 $33.94

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Oregon.

Get notified when OR20260098 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.