PA20260037
ResidentialDavis-Bacon Act general wage determination for residential construction in Pennsylvania.
Track PA20260037
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0038-004 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS) | $39.18 | $26.07 | $65.25 |
BOIL0013-006 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $55.00 | $35.48 | $90.48 |
BRPA0005-022 Effective 05/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER, STONEMASON (TOBYHANNA ARMY DEPOT) | $37.07 | $18.82 | $55.89 |
BRPA0005-040 Effective 05/01/2016 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER, STONEMASON (EXCEPT TOBYHANNA) | $32.39 | $16.06 | $48.45 |
CARP0261-006 Effective 06/01/2018 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER & SOFT FLOOR LAYER | $28.02 | $12.59 | $40.61 |
ELEC0081-007 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BARRETT, COLLBAUGH, PARADISE, PRICE, AND TOBYHANNA TOWNSHIPS) | $23.82 | $16.66 | $40.48 |
ELEC0102-009 Effective 06/03/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (REMAINDER OF COUNTY) | $63.38 | $40.25 | $103.63 |
ENGI0542-020 Effective 05/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 6 OILERS AND DECK HANDS (PERSONNEL BOATS). BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $34.40 | $26.32 | $60.72 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CONVEYORS, BUILDING HOIST (SINGLE DRUM), HIGH OR LOW PRESSURE BOILERS, WELL DRILLERS, ASPHALT PLANT ENGINEERS, DITCH WITCH TYPE TRENCHER, CORE DRILL OPERATORS, FORKLIFT TRUCKS UNDER 20FT. LIFT, FINE GRADE MACHINES, DIRECTIONAL DRILL MACHINE 7"" OR LESS, HYDRAULIC PIPE PUSHER 7"" OR LESS, SKID-STEER FORKLIFT, MACHINES WITH CONCRETE MIXER ATTACHMENT, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT, MISCELLANEOUS EQUIPMENT OPERATOR. BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $36.87 | $27.04 | $63.91 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL TYPES OF CRANES (EXCEPT CRANES DOING HOOK WORK) BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, HOIST WITH TWO TOWERS, PAVERS 21E AND OVER, OVERHEAD CRANES, BUILDING HOISTS (DOUBLE DRUM) GRADALLS, MUCKING MACHINES IN TUNNELS, FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPE BACKHOES, BOAT CAPTAINS, BATCH PLANT OPERATORS CONCRETE DRILLS, SELF-CONTAINED ROTARY DRILLS, FORK LIFTS, 20FT, LIFT AND OVER, SCRAPERS, TOURNAPULLS, SPREADERS, BULLDOZERS AND TRACTORS, ROLLERS (HIGH GRADE FINISHING), MECHANIC-WELDER, MOTOR PATROLS, CONCRETE PUMPS, GREASE TRUCK, DIRECTIONALL DRILL MACHINES 8"" AND UP, SKID STEER, HYDRAULIC PIPE PUSHER 8"" AND UP, HYDRO AX, ENVIRONMENTAL RECYCLING MACHINE AND GRINDER TYPE MACHINES, LULL TYPE LIFTS MASONRY TENDERS, SHEAR ATTACHED TO MACHINES, GREASE TRUCK, CONCREATE PLACER MACHINE, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $39.59 | $27.85 | $67.44 |
IRON0404-025 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKERS: (STRUCTURAL & ORNAMENTAL) | $37.26 | $32.63 | $69.89 |
LABO1174-005 Effective 05/01/2016 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: GROUP 4 SKID-STEERING LOADER AND FOLKLIFT LABORERS. OPERATION OF ROUGH TERRAIN FORKLIFTS, SKID-STEERING LOADERS | $25.34 | $17.14 | $42.48 |
PAIN0021-013 Effective 05/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: SPRAY | $30.02 | $21.14 | $51.16 |
| PAINTERS: (BRUSH AND ROLLER) | $29.02 | $21.14 | $50.16 |
PLAS0592-002 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER (REMAINDER OF COUNTY) | $37.81 | $13.70 | $51.51 |
| CEMENT MASON/CONCRETE FINISHER (REMAINDER OF COUNTY) | $37.13 | $14.30 | $51.43 |
PLAS0592-021 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER (TOBYHANNA ARMY DEPOT) | $37.81 | $13.70 | $51.51 |
| CEMENT MASON/CONCRETE FINISHER (TOBYHANNA ARMY DEPOT) | $37.13 | $14.30 | $51.43 |
PLUM0524-003 Effective 12/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER AND STEAMFITTER | $51.69 | $27.07 | $78.76 |
ROOF0030-005 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFERS: (SLATE AND TILE) | $37.35 | $21.85 | $59.20 |
| ROOFERS: (SHINGLE) | $34.35 | $21.85 | $56.20 |
SHEE0044-005 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER | $36.13 | $30.32 | $66.45 |
TEAM0229-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: GROUP 3 EUCLID-TYPE, OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS), STRADDLE TRUCKS, PUSHER, ARTICULATE DUMPED TRUCKS, LOW BOY TRAILERS, SEMI TRAILERS WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE | $42.43 | $0.00 | $42.43 |
| TRUCK DRIVER: GROUP 2 DUMP TRUCK (OVER 10 YDS), ASPHALT DISTRIBUTORS, TRANSIT MIX (UNDER 5 YDS), TRANSIT MIX (OVER 5 YDS.), FLAT OR STAKE BODY (TANDEM), FUEL TRUCK A-FRAME/WINCH TRUCKS, DRY BATCH TRUCK, TRUCK MOUNTED SWEEPER AND VAC TRUCKS, BUSES, DUMPSTER (TANDEM) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE | $41.94 | $0.00 | $41.94 |
| TRUCK DRIVER: GROUP 1 FLAT BED TRUCK (SINGLE-AXLE), DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE), STAKE BODY TRCK (SINGLE AXLE), DUMPSTER (SINGLE AXLE) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE | $41.87 | $0.00 | $41.87 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/16/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Pennsylvania.
Get notified when PA20260037 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.