PA20260069
BuildingDavis-Bacon Act general wage determination for building construction in Pennsylvania.
Track PA20260069
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0038-006 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $39.18 | $26.07 | $65.25 |
BOIL0154-007 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $48.28 | $33.17 | $81.45 |
BRPA0005-066 Effective 05/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MASON - STONE | $32.66 | $21.58 | $54.24 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | $32.66 | $21.58 | $54.24 |
BRPA0005-069 Effective 05/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TERRAZZO WORKER/SETTER | $33.83 | $20.78 | $54.61 |
| TERRAZZO WORKER/GRINDER | $33.94 | $19.03 | $52.97 |
| TERRAZZO FINISHER | $33.23 | $19.03 | $52.26 |
BRPA0009-011 Effective 12/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $35.64 | $21.63 | $57.27 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 |
CARP0287-013 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDES DRYWALL HANGING, METAL STUD INSTALLATION, FORM WORK AND SCAFFOLD BUILDING; EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $36.84 | $20.19 | $57.03 |
CARP0443-003 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $43.00 | $23.44 | $66.44 |
ELEC0743-016 Effective 09/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, AND LOW VOLTAGE WIRING ONLY) | $39.27 | $22.28 | $61.55 |
ELEC0812-015 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $38.50 | $26.46 | $64.96 |
ENGI0066-022 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | $21.32 | $58.19 |
ENGI0542-029 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | $31.58 | $78.72 |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $41.88 | $30.03 | $71.91 |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | $30.83 | $75.44 |
IRON0404-011 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (STRUCTURAL AND REINFORCING) | $37.26 | $32.63 | $69.89 |
LABO1174-009 Effective 05/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (VIBRATING PLATE) | $21.57 | $15.04 | $36.61 |
| LABORER (FORKLIFT (MASONRY WORK ONLY)) | $25.29 | $15.04 | $40.33 |
PAIN0041-004 Effective 05/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH, ROLLER, AND SPRAY | $27.95 | $16.12 | $44.07 |
PLUM0520-016 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDES HVAC UNIT INSTALLATION) | $41.36 | $29.45 | $70.81 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $41.36 | $29.45 | $70.81 |
PLUM0524-009 Effective 12/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $51.69 | $27.07 | $78.76 |
SHEE0019-014 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY | $43.09 | $42.52 | $85.61 |
SHEE0044-008 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $36.13 | $30.32 | $66.45 |
SUPA2011-027 Effective 08/20/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $24.98 | $11.88 | $36.86 |
| ROOFER | $41.37 | $13.28 | $54.65 |
| PLUMBER (HVAC UNIT INSTALLATION ONLY) | $24.31 | $3.95 | $28.26 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | $13.93 | $40.89 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.88 | $14.13 | $44.01 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $18.14 | $7.11 | $25.25 |
| ELECTRICIAN, EXCLUDES ALARM INSTALLATION, SOUND AND COMMUNICATION INSTALLATION, HVAC/TEMPERATURE CONTROL INSTALLATION, AND LOW VOLTAGE WIRING | $28.98 | $16.73 | $45.71 |
| CEMENT MASON/CONCRETE FINISHER | $19.81 | $9.03 | $28.84 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $25.71 | $12.02 | $37.73 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 2 | 01/16/2026 |
| 3 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Pennsylvania.
Get notified when PA20260069 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.