TX20260007

Heavy

Davis-Bacon Act general wage determination for heavy construction in Texas.

Modification 1, revised 05/18/2026 50 trade rates 20 counties View on SAM.gov

Track TX20260007

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

SUTX2011-006 Effective 08/03/2011
Trade Rate Fringe Total
WELDER $15.97 $0.00 $15.97
TRUCK DRIVER: TANDEM AXLE TRACTOR W/SEMI TRAILER $12.81 $0.00 $12.81
TRUCK DRIVER: SINGLE OR TANDEM AXLE DUMP TRUCK $11.68 $0.00 $11.68
TRUCK DRIVER (SINGLE AXLE) $11.79 $0.00 $11.79
TRUCK DRIVER (OFF ROAD HAULER) $11.88 $0.00 $11.88
TRUCK DRIVER (LOWBOY-FLOAT) $15.66 $0.00 $15.66
TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION, (TRAFFIC SIGNAL/LIGHT POLE WORKER) $16.00 $0.00 $16.00
STEEL WORKER (STRUCTURAL) $19.29 $0.00 $19.29
STEEL WORKER (REINFORCING) $14.00 $0.00 $14.00
SERVICER $14.51 $0.00 $14.51
POWER EQUIPMENT OPERATOR: SCRAPER $12.27 $0.00 $12.27
POWER EQUIPMENT OPERATOR: MOTOR GRADER, ROUGH $14.63 $0.00 $14.63
POWER EQUIPMENT OPERATOR: MOTOR GRADER, FINE GRADE $18.51 $0.00 $18.51
POWER EQUIPMENT OPERATOR: MECHANIC $17.10 $0.00 $17.10
POWER EQUIPMENT OPERATOR: FRONT END LOADER, 3 CY OR LESS $13.04 $0.00 $13.04
POWER EQUIPMENT OPERATOR: FOUNDATION DRILL, TRUCK MOUNTED $16.93 $0.00 $16.93
POWER EQUIPMENT OPERATOR: CRAWLER TRACTOR $15.67 $0.00 $15.67
POWER EQUIPMENT OPERATOR: BROOM OR SWEEPER $11.04 $0.00 $11.04
POWER EQUIPMENT OPERATOR: BOOM TRUCK $18.36 $0.00 $18.36
POWER EQUIPMENT OPERATOR: ASPHALT DISTRIBUTOR $15.55 $0.00 $15.55
POWER EQUIPMENT OPERATOR: (TRENCHING MACHINE, HEAVY) $18.48 $0.00 $18.48
POWER EQUIPMENT OPERATOR: (SPREADER BOX) $14.04 $0.00 $14.04
POWER EQUIPMENT OPERATOR: (ROLLER, OTHER) $10.50 $0.00 $10.50
POWER EQUIPMENT OPERATOR: (ROLLER, ASPHALT) $12.78 $0.00 $12.78
POWER EQUIPMENT OPERATOR: (RECLAIMER/PULVERIZER) $12.88 $0.00 $12.88
POWER EQUIPMENT OPERATOR: (PAVEMENT MARKING MACHINE) $19.17 $0.00 $19.17
POWER EQUIPMENT OPERATOR: (MILLING MACHINE) $14.18 $0.00 $14.18
POWER EQUIPMENT OPERATOR: (LOADER/BACKHOE) $14.12 $0.00 $14.12
POWER EQUIPMENT OPERATOR: (FRONT END LOADER, OVER 3 CY) $13.21 $0.00 $13.21
POWER EQUIPMENT OPERATOR: (EXCAVATOR OVER 50,000 LBS) $17.71 $0.00 $17.71
POWER EQUIPMENT OPERATOR: (EXCAVATOR 50,000 LBS OR LESS) $12.88 $0.00 $12.88
POWER EQUIPMENT OPERATOR: (DIRECTIONAL DRILLING OPERATOR) $17.24 $0.00 $17.24
POWER EQUIPMENT OPERATOR: (DIRECTIONAL DRILLING LOCATOR) $11.67 $0.00 $11.67
POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM OVER 80 TONS) $19.38 $0.00 $19.38
POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM 80 TONS OR LESS) $15.87 $0.00 $15.87
POWER EQUIPMENT OPERATOR: (CRANE, HYDRAULIC 80 TONS OR LESS) $18.36 $0.00 $18.36
POWER EQUIPMENT OPERATOR: (CONCRETE PAVEMENT FINISHING MACHINE) $15.48 $0.00 $15.48
POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) $14.36 $0.00 $14.36
POWER EQUIPMENT OPERATOR: (AGRICULTURAL TRACTOR) $12.69 $0.00 $12.69
PAINTER (STRUCTURES) $18.34 $0.00 $18.34
LABORER: PIPELAYER $12.79 $0.00 $12.79
LABORER: ASPHALT RAKER $12.12 $0.00 $12.12
LABORER (WORK ZONE BARRICADE SERVICER) $11.85 $0.00 $11.85
LABORER (LABORER, UTILITY) $12.27 $0.00 $12.27
LABORER (LABORER, COMMON) $10.50 $0.00 $10.50
LABORER (FLAGGER) $9.45 $0.00 $9.45
FORM BUILDER/FORM SETTER (STRUCTURES) $12.87 $0.00 $12.87
FORM BUILDER/FORM SETTER (PAVING & CURB) $12.94 $0.00 $12.94
ELECTRICIAN $26.35 $0.00 $26.35
CEMENT MASON/CONCRETE FINISHER (PAVING AND STRUCTURES) $12.56 $0.00 $12.56

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 20 counties in Texas.

Get notified when TX20260007 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.