HeavyDavis-Bacon Act general wage determination for heavy construction in Texas.
Track TX20260017
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0021-003 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS) | $33.23 | $7.52 | $40.75 |
ELEC0020-003 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIANS | $39.75 | $11.67 | $51.42 |
ELEC0220-001 Effective 06/02/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: TRUCK DRIVER | $23.14 | $9.45 | $32.59 |
| LINE CONSTRUCTION: LINEMAN | $41.31 | $15.72 | $57.03 |
| LINE CONSTRUCTION: GROUNDMAN | $19.28 | $8.67 | $27.95 |
| LINE CONSTRUCTION: EQUIPMENT OPERATORS | $25.83 | $13.05 | $38.88 |
ENGI0178-001 Effective 06/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CRANES: (HYDRAULIC OVER 35 TONS,DERRICKS, OVERHEAD GENTRY,STIFFLEG,TOWER,ETC., AND CRANES WITH PILEDRIVING OR CAISSON ATTACHEMENTS) | $32.60 | $13.10 | $45.70 |
| CRANES: (HYDRAULIC CRANE (35 TON & UNDER)) | $32.35 | $13.10 | $45.45 |
IRON0263-010 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKERS: REINFORCING & STRUCTURAL | $29.64 | $8.43 | $38.07 |
PLUM0100-002 Effective 11/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBERS AND PIPEFITTERS | $39.76 | $14.04 | $53.80 |
SHEE0068-002 Effective 11/01/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER | $27.64 | $8.84 | $36.48 |
SUTX1990-040 Effective 08/01/1990 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $7.47 | $0.00 | $7.47 |
| POWER EQUIPMENT OPERATORS: SCRAPER | $8.00 | $0.00 | $8.00 |
| POWER EQUIPMENT OPERATORS: OILER | $9.18 | $0.00 | $9.18 |
| POWER EQUIPMENT OPERATORS: MOTOR GRADER | $11.63 | $0.00 | $11.63 |
| POWER EQUIPMENT OPERATORS: MECHANIC | $9.88 | $0.00 | $9.88 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | $10.77 | $0.00 | $10.77 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $9.94 | $0.00 | $9.94 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $10.97 | $0.00 | $10.97 |
| PIPELAYER | $7.96 | $0.00 | $7.96 |
| LABORERS: (UTILITY) | $7.25 | $0.00 | $7.25 |
| LABORERS: (COMMON) | $7.25 | $0.00 | $7.25 |
| FORM SETTER | $9.58 | $0.00 | $9.58 |
| FORM BUILDER | $8.04 | $0.00 | $8.04 |
| CONCRETE FINISHER | $9.60 | $0.00 | $9.60 |
| CARPENTER | $10.54 | $0.00 | $10.54 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Texas.
Get notified when TX20260017 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.