TX20260017

Heavy

Davis-Bacon Act general wage determination for heavy construction in Texas.

Modification 1, revised 05/18/2026 26 trade rates 1 county View on SAM.gov

Track TX20260017

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0021-003 Effective 06/01/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS) $33.23 $7.52 $40.75
ELEC0020-003 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIANS $39.75 $11.67 $51.42
ELEC0220-001 Effective 06/02/2024
Trade Rate Fringe Total
LINE CONSTRUCTION: TRUCK DRIVER $23.14 $9.45 $32.59
LINE CONSTRUCTION: LINEMAN $41.31 $15.72 $57.03
LINE CONSTRUCTION: GROUNDMAN $19.28 $8.67 $27.95
LINE CONSTRUCTION: EQUIPMENT OPERATORS $25.83 $13.05 $38.88
ENGI0178-001 Effective 06/01/2020
Trade Rate Fringe Total
CRANES: (HYDRAULIC OVER 35 TONS,DERRICKS, OVERHEAD GENTRY,STIFFLEG,TOWER,ETC., AND CRANES WITH PILEDRIVING OR CAISSON ATTACHEMENTS) $32.60 $13.10 $45.70
CRANES: (HYDRAULIC CRANE (35 TON & UNDER)) $32.35 $13.10 $45.45
IRON0263-010 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKERS: REINFORCING & STRUCTURAL $29.64 $8.43 $38.07
PLUM0100-002 Effective 11/01/2024
Trade Rate Fringe Total
PLUMBERS AND PIPEFITTERS $39.76 $14.04 $53.80
SHEE0068-002 Effective 11/01/2012
Trade Rate Fringe Total
SHEET METAL WORKER $27.64 $8.84 $36.48
SUTX1990-040 Effective 08/01/1990
Trade Rate Fringe Total
TRUCK DRIVER $7.47 $0.00 $7.47
POWER EQUIPMENT OPERATORS: SCRAPER $8.00 $0.00 $8.00
POWER EQUIPMENT OPERATORS: OILER $9.18 $0.00 $9.18
POWER EQUIPMENT OPERATORS: MOTOR GRADER $11.63 $0.00 $11.63
POWER EQUIPMENT OPERATORS: MECHANIC $9.88 $0.00 $9.88
POWER EQUIPMENT OPERATORS: FRONT END LOADER $10.77 $0.00 $10.77
POWER EQUIPMENT OPERATORS: BULLDOZER $9.94 $0.00 $9.94
POWER EQUIPMENT OPERATORS: (BACKHOE) $10.97 $0.00 $10.97
PIPELAYER $7.96 $0.00 $7.96
LABORERS: (UTILITY) $7.25 $0.00 $7.25
LABORERS: (COMMON) $7.25 $0.00 $7.25
FORM SETTER $9.58 $0.00 $9.58
FORM BUILDER $8.04 $0.00 $8.04
CONCRETE FINISHER $9.60 $0.00 $9.60
CARPENTER $10.54 $0.00 $10.54

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Texas.

Get notified when TX20260017 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.