UT20260011
HeavyDavis-Bacon Act general wage determination for heavy construction in Utah.
Track UT20260011
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ELEC0057-002 Effective 03/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: LINEMAN | $58.83 | $21.21 | $80.04 |
ENGI0003-005 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, BOBCAT/SKID LOADER, FRONT END LOADER(UNDER 2 CU. YDS.), OILER | $36.55 | $18.62 | $55.17 |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BULLDOZER, FRONT END LOADER(2 TO 5 CU. YDS.), GRADE SETTER, OIL DISTRIBUTOR, SCRAPER | $37.79 | $18.62 | $56.41 |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER(OVER 5 CU.YDS.) | $39.01 | $18.62 | $57.63 |
| OPERATOR: POWER EQUIPMENT: (1)MECHANIC-EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION | $41.71 | $18.62 | $60.33 |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $36.55 | $18.62 | $55.17 |
| OPERATOR: POWER EQUIPMENT ((7) ROLLER(DIRT AND GRADE COMPACTION)) | $34.25 | $18.62 | $52.87 |
| OPERATOR: POWER EQUIPMENT ((2A)BLADE/GRADER) | $40.32 | $18.62 | $58.94 |
ENGI0003-056 Effective 07/01/2013 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, MECHANIC: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | $17.57 | $53.25 |
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | $11.88 | $33.91 |
IRON0027-001 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER | $32.68 | $27.55 | $60.23 |
LABO0295-006 Effective 07/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: POT TENDER AND SAND BLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
| LABORER: COMMON OR GENERAL, PIPELAYER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.59 | $8.65 | $29.24 |
LABO0295-015 Effective 07/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: (5)HAND HELD DRILL | $21.65 | $8.65 | $30.30 |
| LABORER: (3) MASON TENDER (CEMENT/CONCRETE), HAND HELD SAW, JACKHAMMER, POWER SAW) | $20.85 | $8.65 | $29.50 |
| LABORER: (1)FLAGGER | $20.59 | $8.65 | $29.24 |
LABO0295-038 Effective 07/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: (1) COMMON OR GENERAL: EXCLUDING NATURAL GAS PIPELINE & WATER/SEWER LINE CONSTRUCTION | $20.59 | $8.65 | $29.24 |
SUUT2008-040 Effective 08/19/2008 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| WATER & SEWER LINES: OPERATOR-BACKHOE/EXCAVATOR/TRACKHOE | $15.57 | $0.00 | $15.57 |
| WATER & SEWER LINES: WATER & SEWER LINES: LABORER, COMMON OR GENERAL | $12.81 | $0.00 | $12.81 |
| WATER & SEWER LINES: TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $14.40 | $3.99 | $18.39 |
| WATER & SEWER LINES: OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE AND WATER/SEWER LINE CONSTRUCTION) | $19.98 | $0.00 | $19.98 |
| WATER & SEWER LINES: OPERATOR: CRANE | $28.97 | $9.40 | $38.37 |
| WATER & SEWER LINES: LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $14.00 | $0.00 | $14.00 |
| WATER & SEWER LINES: LABORER: LANDSCAPE | $7.25 | $0.00 | $7.25 |
| WATER & SEWER LINES: ELECTRICIAN | $23.74 | $7.64 | $31.38 |
| WATER & SEWER LINES: CEMENT MASON/CONCRETE FINISHER | $17.08 | $3.14 | $20.22 |
| WATER & SEWER LINES: CARPENTER, INCLUDES FORM WORK | $14.63 | $0.97 | $15.60 |
TEAM0222-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER ZONE 2: GROUP 3 | $41.90 | $15.75 | $57.65 |
| TRUCK DRIVER ZONE 2: GROUP 2 | $46.02 | $15.75 | $61.77 |
| TRUCK DRIVER ZONE 2: GROUP 1 | $46.65 | $15.75 | $62.40 |
| TRUCK DRIVER ZONE 1: GROUP 3 | $40.37 | $15.10 | $55.47 |
| TRUCK DRIVER ZONE 1: GROUP 2 | $40.75 | $15.10 | $55.85 |
| TRUCK DRIVER ZONE 1: GROUP 1 | $41.39 | $15.10 | $56.49 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Utah.
Get notified when UT20260011 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.