UT20260022

Heavy

Davis-Bacon Act general wage determination for heavy construction in Utah.

Modification 1, revised 05/18/2026 22 trade rates 1 county View on SAM.gov

Track UT20260022

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ENGI0003-047 Effective 07/01/2020
Trade Rate Fringe Total
OPERATOR: POWER EQUIPMENT (3)BACKHOE: EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION $30.78 $16.09 $46.87
ENGI0003-054 Effective 07/01/2013
Trade Rate Fringe Total
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $22.03 $11.88 $33.91
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $35.68 $17.57 $53.25
LABO0295-018 Effective 07/01/2014
Trade Rate Fringe Total
LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50
LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY $21.65 $8.65 $30.30
LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50
LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.59 $8.65 $29.24
LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50
SUUT2008-028 Effective 08/19/2008
Trade Rate Fringe Total
TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) $12.00 $0.00 $12.00
OPERATOR: EXCAVATOR (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) $12.75 $0.00 $12.75
OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) $13.63 $0.00 $13.63
OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) $10.89 $0.00 $10.89
OPERATOR: LOADER (FRONT END) $11.38 $0.00 $11.38
OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION $13.61 $0.00 $13.61
LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) $9.00 $0.00 $9.00
LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) $12.00 $0.00 $12.00
LABORER: MASON TENDER - CEMENT/CONCRETE $9.00 $0.36 $9.36
CEMENT MASON/CONCRETE FINISHER $14.00 $0.56 $14.56
CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) $14.75 $3.03 $17.78
TEAM0222-020 Effective 07/01/2025
Trade Rate Fringe Total
TRUCK DRIVER: NATURAL GAS PIPELINE CONSTRUCTION ONLY: GROUP 2 STRINGER TRUCK PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE $46.02 $15.75 $61.77
TRUCK DRIVER: NATURAL GAS PIPELINE CONSTRUCTION ONLY: GROUP 1 LOW BOY AND TRUCK MECHANIC PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE $46.65 $15.75 $62.40
TRUCK DRIVER: GROUP 3 AMBULANCE , BUS, DUMP TRUCK (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) NATURAL GAS PIPELINE CONSTRUCTION ONLY PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS GROUP 1: LOW BOY AND TRUCK MECHANIC GROUP 2: STRINGER TRUCK $41.90 $15.75 $57.65

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Utah.

Get notified when UT20260022 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.