UT20260028
HeavyDavis-Bacon Act general wage determination for heavy construction in Utah.
Track UT20260028
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ENGI0003-054 Effective 07/01/2013 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | $11.88 | $33.91 |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | $17.57 | $53.25 |
LABO0295-018 Effective 07/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
| LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $21.65 | $8.65 | $30.30 |
| LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
| LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.59 | $8.65 | $29.24 |
| LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
SUUT2008-024 Effective 08/19/2008 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | $0.00 | $12.00 |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 | $0.00 | $10.89 |
| OPERATOR: LOADER (FRONT END) | $11.38 | $0.00 | $11.38 |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | $0.00 | $13.61 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.67 | $0.00 | $12.67 |
| LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.00 | $0.00 | $9.00 |
| LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $10.92 | $0.00 | $10.92 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.00 | $0.36 | $9.36 |
| CEMENT MASON/CONCRETE FINISHER | $14.00 | $0.56 | $14.56 |
| CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 |
TEAM0222-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: NATURAL GAS PIPELINE CONSTRUCTION ONLY: GROUP 2 STRINGER TRUCK PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE | $41.06 | $15.75 | $56.81 |
| TRUCK DRIVER: NATURAL GAS PIPELINE CONSTRUCTION ONLY: GROUP 1 LOW BOY AND TRUCK MECHANIC PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE | $41.71 | $15.75 | $57.46 |
| TRUCK DRIVER: GROUP 3 AMBULANCE , BUS, DUMP TRUCK (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) NATURAL GAS PIPELINE CONSTRUCTION ONLY PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS GROUP 1: LOW BOY AND TRUCK MECHANIC GROUP 2: STRINGER TRUCK | $40.66 | $15.75 | $56.41 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Utah.
Get notified when UT20260028 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.