VA20260012
BuildingDavis-Bacon Act general wage determination for building construction in Virginia.
Track VA20260012
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0024-006 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 | $60.94 |
BOIL0045-003 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $38.97 | $27.39 | $66.36 |
ENGI0147-019 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (CRANES UNDER 90 TONS) | $39.99 | $18.05 | $58.04 |
| POWER EQUIPMENT OPERATOR (CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND) | $40.99 | $18.05 | $59.04 |
IRON0005-023 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, ORNAMENTAL AND STRUCTURAL | $37.86 | $25.86 | $63.72 |
PAIN0051-033 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: SPRAY ONLY | $29.16 | $11.86 | $41.02 |
SUVA2013-024 Effective 01/11/2016 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $16.58 | $1.73 | $18.31 |
| TILE SETTER | $27.80 | $10.25 | $38.05 |
| TILE FINISHER | $23.40 | $0.00 | $23.40 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $18.38 | $3.30 | $21.68 |
| ROOFER | $16.17 | $3.73 | $19.90 |
| PLUMBER | $21.15 | $3.92 | $25.07 |
| PIPEFITTER | $24.98 | $9.14 | $34.12 |
| PAINTER (BRUSH AND ROLLER) | $20.01 | $0.00 | $20.01 |
| OPERATOR: ROLLER | $16.25 | $4.88 | $21.13 |
| OPERATOR: LOADER | $21.28 | $3.17 | $24.45 |
| OPERATOR: FORKLIFT | $19.40 | $7.00 | $26.40 |
| OPERATOR: BULLDOZER | $16.00 | $0.00 | $16.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.95 | $4.03 | $22.98 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.24 | $0.87 | $17.11 |
| LABORER: PIPELAYER | $12.00 | $1.17 | $13.17 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.32 | $0.00 | $15.32 |
| LABORER: MASON TENDER - BRICK | $13.41 | $3.15 | $16.56 |
| LABORER: COMMON OR GENERAL, INCLUDING PIPELAYING | $12.38 | $1.40 | $13.78 |
| IRONWORKER, REINFORCING | $25.36 | $6.68 | $32.04 |
| ELECTRICIAN | $21.78 | $9.31 | $31.09 |
| CARPENTER | $14.81 | $2.19 | $17.00 |
| BRICKLAYER | $23.54 | $6.73 | $30.27 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Virginia.
Get notified when VA20260012 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.