VA20260021
BuildingDavis-Bacon Act general wage determination for building construction in Virginia.
Track VA20260021
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0024-006 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 | $60.94 |
BOIL0045-003 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $38.97 | $27.39 | $66.36 |
BRVA0001-008 Effective 04/27/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $38.80 | $15.17 | $53.97 |
BRVA0001-009 Effective 04/27/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MASON - STONE | $45.65 | $21.21 | $66.86 |
IRON0005-023 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, ORNAMENTAL AND STRUCTURAL | $37.86 | $25.86 | $63.72 |
PAIN0051-034 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $32.41 | $14.46 | $46.87 |
PAIN0051-035 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH, ROLLER AND SPRAY | $29.16 | $11.86 | $41.02 |
PAIN0051-036 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| DRYWALL FINISHER/TAPER | $29.16 | $11.86 | $41.02 |
SFVA0669-006 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.22 | $26.39 | $71.61 |
SUVA2013-036 Effective 01/11/2016 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| WATERPROOFER | $21.75 | $1.57 | $23.32 |
| TRUCK DRIVER: DUMP TRUCK | $19.22 | $2.58 | $21.80 |
| TILE SETTER | $27.80 | $10.25 | $38.05 |
| TILE FINISHER | $23.40 | $0.00 | $23.40 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $24.46 | $7.91 | $32.37 |
| ROOFER | $15.83 | $3.06 | $18.89 |
| OPERATOR: ROLLER | $16.25 | $4.88 | $21.13 |
| OPERATOR: LOADER | $22.26 | $3.57 | $25.83 |
| OPERATOR: FORKLIFT | $21.56 | $7.57 | $29.13 |
| OPERATOR: CRANE | $31.68 | $2.64 | $34.32 |
| OPERATOR: BULLDOZER | $21.99 | $4.98 | $26.97 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.95 | $4.03 | $22.98 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.50 | $4.50 | $28.00 |
| LABORER: PIPELAYER | $16.81 | $4.26 | $21.07 |
| LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON TENDING AND CEMENT MASON TENDING | $15.03 | $2.90 | $17.93 |
| IRONWORKER, REINFORCING | $25.85 | $6.94 | $32.79 |
| FLOOR LAYER: SOFT FLOORS | $18.75 | $0.00 | $18.75 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS | $29.87 | $11.77 | $41.64 |
| CEMENT MASON/CONCRETE FINISHER | $21.94 | $3.36 | $25.30 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $23.89 | $5.23 | $29.12 |
| BRICK POINTER/CAULKER/CLEANER | $19.68 | $0.00 | $19.68 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/09/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Virginia.
Get notified when VA20260021 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.