Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0024-006 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 | $60.94 |
BOIL0045-003 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $38.97 | $27.39 | $66.36 |
ELEC1340-001 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING AND ALARM INSTALLATION) | $34.03 | $17.03 | $51.06 |
ENGI0147-019 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (CRANES UNDER 90 TONS) | $39.99 | $18.05 | $58.04 |
| POWER EQUIPMENT OPERATOR (CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND) | $40.99 | $18.05 | $59.04 |
IRON0028-006 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, RIGGER | $30.22 | $17.56 | $47.78 |
IRON0028-007 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $31.00 | $18.28 | $49.28 |
PLUM0110-008 Effective 11/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $36.92 | $18.25 | $55.17 |
| PIPEFITTER (INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS) | $36.92 | $18.25 | $55.17 |
SUVA2013-037 Effective 01/11/2016 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $15.50 | $0.75 | $16.25 |
| TILE SETTER | $27.80 | $10.25 | $38.05 |
| TILE FINISHER | $23.40 | $0.00 | $23.40 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $18.91 | $4.67 | $23.58 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $19.24 | $2.80 | $22.04 |
| ROOFER | $18.40 | $2.31 | $20.71 |
| PAINTER: SPRAY | $18.10 | $5.43 | $23.53 |
| PAINTER (BRUSH AND ROLLER) | $16.87 | $0.00 | $16.87 |
| OPERATOR: ROLLER | $16.25 | $4.88 | $21.13 |
| OPERATOR: LOADER | $21.28 | $3.17 | $24.45 |
| OPERATOR: FORKLIFT | $19.40 | $7.00 | $26.40 |
| OPERATOR: BULLDOZER | $18.07 | $3.50 | $21.57 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.95 | $4.03 | $22.98 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.69 | $1.35 | $22.04 |
| LABORER: COMMON OR GENERAL, INCLUDING DEMOLITION | $12.14 | $1.60 | $13.74 |
| LABORER: PIPELAYER | $12.40 | $1.96 | $14.36 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.96 | $3.12 | $16.08 |
| LABORER: MASON TENDER - BRICK | $13.48 | $3.27 | $16.75 |
| IRONWORKER, REINFORCING | $27.18 | $4.13 | $31.31 |
| GLAZIER | $19.36 | $4.68 | $24.04 |
| CEMENT MASON/CONCRETE FINISHER | $17.48 | $0.00 | $17.48 |
| CAULKER | $18.49 | $1.33 | $19.82 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $18.50 | $0.00 | $18.50 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/30/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Virginia.
Get notified when VA20260022 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.