HighwayDavis-Bacon Act general wage determination for highway construction in Virginia.
Track VA20260121
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ELEC0080-011 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $36.85 | $14.13 | $50.98 |
PLAS0891-011 Effective 06/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $20.70 | $8.03 | $28.73 |
SUVA2016-057 Effective 07/02/2018 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SINGLE & MULTI AXLE | $18.84 | $0.00 | $18.84 |
| TRUCK DRIVER: HEAVY OVER 7 CY | $18.05 | $0.00 | $18.05 |
| TRUCK DRIVER: FUEL AND LUBRICANT SERVICE | $18.25 | $0.00 | $18.25 |
| TRUCK DRIVER : HEAVY 7CY & UNDER | $15.53 | $0.00 | $15.53 |
| TRAFFIC CONTROL: FLAGGER | $13.64 | $0.00 | $13.64 |
| PAVEMENT MARKING TRUCK DRIVER | $18.78 | $0.00 | $18.78 |
| PAVEMENT MARKING OPERATOR | $22.15 | $0.00 | $22.15 |
| OPERATOR: BULLDOZER, INCLUDING UTILITY | $20.64 | $0.00 | $20.64 |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | $20.58 | $2.31 | $22.89 |
| OPERATOR: SCREED | $22.13 | $4.89 | $27.02 |
| OPERATOR: ROLLER (FINISHING) | $18.73 | $3.23 | $21.96 |
| OPERATOR: ROLLER | $18.92 | $0.00 | $18.92 |
| OPERATOR: PILEDRIVER | $21.83 | $4.08 | $25.91 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.33 | $2.81 | $23.14 |
| OPERATOR: PAVEMENT PLANER GROUNDSMEN | $19.75 | $0.00 | $19.75 |
| OPERATOR: PAVEMENT PLANER | $21.14 | $0.00 | $21.14 |
| OPERATOR: MILLING MACHINE | $23.19 | $2.94 | $26.13 |
| OPERATOR: MECHANIC | $22.84 | $0.00 | $22.84 |
| OPERATOR: LOADER | $18.92 | $0.00 | $18.92 |
| OPERATOR: HYDROSEEDER | $16.64 | $0.00 | $16.64 |
| OPERATOR: GRADER/BLADE | $23.21 | $0.00 | $23.21 |
| OPERATOR: GRADALL | $19.26 | $0.00 | $19.26 |
| OPERATOR: DRILL | $24.89 | $0.00 | $24.89 |
| OPERATOR: CRANE | $29.46 | $0.00 | $29.46 |
| OPERATOR: BROOM/SWEEPER | $17.40 | $2.01 | $19.41 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.00 | $3.49 | $22.49 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.93 | $0.00 | $23.93 |
| LABORER: POWER TOOL OPERATOR | $15.69 | $0.00 | $15.69 |
| LABORER: PIPELAYER | $20.48 | $0.00 | $20.48 |
| LABORER: GRADE CHECKER | $14.88 | $0.00 | $14.88 |
| LABORER: COMMON OR GENERAL | $15.14 | $0.00 | $15.14 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $19.05 | $1.75 | $20.80 |
| IRONWORKER, STRUCTURAL | $34.18 | $0.00 | $34.18 |
| IRONWORKER, REINFORCING | $34.18 | $0.00 | $34.18 |
| FENCE ERECTOR | $15.28 | $0.00 | $15.28 |
| CARPENTER, INCLUDES FORM WORK | $20.97 | $0.00 | $20.97 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 2 counties in Virginia.
Get notified when VA20260121 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.