VT20260060

Highway

Davis-Bacon Act general wage determination for highway construction in Vermont.

Modification 1, revised 05/18/2026 12 trade rates 1 county View on SAM.gov

Track VT20260060

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

LABO0668-003 Effective 12/01/2023
Trade Rate Fringe Total
LABORER: PIPELAYER $25.40 $21.43 $46.83
SUVT2017-021 Effective 08/06/2019
Trade Rate Fringe Total
TRUCK DRIVER, INCLUDES ALL AXLES INCLUDING DUMP TRUCKS $18.90 $2.68 $21.58
TRAFFIC CONTROL: FLAGGER $12.90 $0.00 $12.90
OPERATOR: POUNDER $22.30 $5.04 $27.34
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) $21.41 $3.55 $24.96
OPERATOR: MILLING MACHINE $32.40 $23.55 $55.95
OPERATOR: LOADER $21.50 $2.41 $23.91
OPERATOR: BROOM/SWEEPER $18.57 $2.47 $21.04
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $22.85 $8.39 $31.24
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.58 $2.25 $23.83
LABORER: COMMON OR GENERAL, INCLUDES ASPHALT RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $16.48 $1.68 $18.16
CARPENTER, INCLUDES FORM WORK $21.66 $3.58 $25.24

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Vermont.

Get notified when VT20260060 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.