VT20260066

Heavy

Davis-Bacon Act general wage determination for heavy construction in Vermont.

Modification 1, revised 05/18/2026 11 trade rates 7 counties View on SAM.gov

Track VT20260066

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

IRON0007-002 Effective 09/16/2025
Trade Rate Fringe Total
IRONWORKER, REINFORCING $33.65 $26.12 $59.77
LABO0668-004 Effective 12/01/2023
Trade Rate Fringe Total
LABORER (COMMON OR GENERAL) $25.40 $21.43 $46.83
LABO0668-005 Effective 12/01/2023
Trade Rate Fringe Total
LABORER: PIPELAYER $25.40 $21.43 $46.83
SUVT2017-005 Effective 08/06/2019
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK $18.43 $0.00 $18.43
TRAFFIC CONTROL: FLAGGER $14.85 $0.29 $15.14
OPERATOR: ROLLER $21.26 $0.00 $21.26
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) $23.33 $0.00 $23.33
OPERATOR: LOADER $21.36 $0.00 $21.36
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.15 $2.79 $24.94
ELECTRICIAN $24.13 $11.96 $36.09
CARPENTER, INCLUDES FORM WORK $22.54 $12.82 $35.36

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 7 counties in Vermont.

Get notified when VT20260066 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.