WA20260002
BuildingHeavyHighwayDavis-Bacon Act general wage determination for building, heavy, highway construction in Washington.
Track WA20260002
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
SUWA2001-001 Effective 09/03/2001 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: GROUP 6 A-Frame; Service Greaser; Tireperson; Truck, side, end, and bottom & articulated end dump (up to and including 12 yds); Water Tank Truck, 4001 to 8000 gallons, Warehouseperson, to include shipping and receiving | $37.22 | $21.81 | $59.03 |
| TRUCK DRIVER: GROUP 5 Auto Crane, 2000 lbs capacity; Dumptor (6 yds and under); Flat Bed Truck (with hydraulic system); Fork Lift (3001-16,000 lbs); Fuel Truck Driver, steam cleaner and washer; Rubber-tired Tunnel Jumbo; Scissors Truck; Slurry Truck Driver; Transite Mixers & mixers hauling concrete 3 yd to and including 6 yd.; Wrecker and Tow Trucks | $37.02 | $21.81 | $58.83 |
| TRUCK DRIVER: GROUP 4 Buggy Mobile and similar; Bulk Cement Tanks and Spreader; Power Operated Sweeper; Straddle Carrier (Ross, Hyster and similar); Water Tank Truck, 1801-4000 gallons | $36.91 | $21.81 | $58.72 |
| TRUCK DRIVER: GROUP 3 Bus Driver or Employee Haul Driver; Flat Bed Truck, dual rear axle; Power Boat hauling employees or material | $36.58 | $21.81 | $58.39 |
| TRUCK DRIVER: GROUP 1 Escort Driver or Pilot Car tender and swamper, Pickup Hauling Employees or Materials | $33.83 | $21.81 | $55.64 |
| SPRINKLER FITTER | $41.33 | $28.58 | $69.91 |
| SHEET METAL WORKER | $47.76 | $27.70 | $75.46 |
| ROOFER (INCLUDING WATERPROOFER AND KETTLEMAN) | $34.72 | $13.31 | $48.03 |
| POWER EQUIPMENT OPERATOR: GROUP 8 Cranes (all cranes over 100 tons); Climbing, Rail and Tower Cranes over 45 tons ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft .50 hr. additional to classification Over 200 ft .80 hr. additional to classificaiton. ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft .50 hr. additional to classification Over 200 ft .80 hr. additional to classificaiton | $41.22 | $22.45 | $63.67 |
| POWER EQUIPMENT OPERATOR: GROUP 7 Backhoes (3 yds and over); Cranes (All Cranesover 45 tons, including 100 tons) Climbing, Rail and Tower Cranes up to including 45 tons; Clamshell Operator (3 yds. and over); Derricks and Stifflegs (65 tons and over); Draglines (3 yds and over); Lead Water Well Driller; Loader (360 degrees revolving Koehring Scooper or similar); Loaders (overhead and front-end, over 8 yds); Shovels (3 yds and over); Whirleys and Hammerheads, all; Vacuum Blasting Machine Operator; HD Mechanic/welder ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft .50 hr. additional to classification Over 200 ft .80 hr. additional to classificaiton. ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft .50 hr. additional to classification Over 200 ft .80 hr. additional to classificaiton | $39.11 | $22.45 | $61.56 |
| POWER EQUIPMENT OPERATOR: GROUP 6 Asphalt Plant Operator (Backhoes (1 yd to 3 yds); Blade (finish and bluetop) Automatic, CMI, ABC and similar when used as automatic; Boom Cats (side); Cableway Operators; Clamshell Operators (under 3 yds); Concrete Slip Form Paver; Cranes (over 25 tons, including 45 tons); Crusher, Grizzle and Screening Plant Operator; Draglines (under 3 yds); Elevating Belt (holland type); Gradall (1 yd to 3 yds); Loader Operator (front-end and overhead, 4 yards, including 8 yds); Mucking Machine; Quadtrack or similar equipment; Rubber-tired Scrapers; Shovels (under 3 yds); Tractors (D-6 and equivalent and over); Vactor Guzzler, Super Sucker; Concrete Cleaning/Decontamination Machine; Ultra High Pressure Waterjet Cutting Tool System (30,000 psi) ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft .50 hr. additional to classification Over 200 ft .80 hr. additional to classificaiton | $37.96 | $22.45 | $60.41 |
| POWER EQUIPMENT OPERATOR: GROUP 5 Automatic Subgrader (Ditches and Trimmers) (Autograde, ABC, R.A. Hansen and similar on grade wire); Backhoe (under 1 yd); Batch Plant (over 4 units); Batch and Wet Mix Operator (mutiple units, 2 and including 4); Boat Operator; Cableway Controller (dispatcher); Concrete Pump Boom Truck; Conveyor Aggregate Placement Equipment; Cranes (25 tons and under); Derricks and Stifflegs (under 65 tons); Drill Doctor; Multiple Dozer Units with single blade; Paving Machine (asphalt and concrete); Piledriving Engineers; Rollerman (finishing pavement); Trenching Machines (7 ft depth and over). ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft .50 hr. additional to classification Over 200 ft .80 hr. additional to classificaiton | $37.64 | $22.45 | $60.09 |
| POWER EQUIPMENT OPERATOR: GROUP 4 Blade Operator (motor patrol and attachments); Concrete Pumps (squeeze-crete, flow-crete, pump-crete, Whitman and similar); Drilling Equipment (8 inch bit and over) (Robbins, reverse circulation and similar); Drills (Churn, Core, Calyx, or Diamond); Equipment Serviceman, Greaser and Oiler; Hoe Ram; Hoist (2 or more drums or Tower Hoist); Loaders (overhead and front-end, under 4 yards R/T);Paving (Dual Drum) Rubber Tire; Refrigeration Plant Engineers (under 1000 ton); Signalman (Whileys, Highline, Hammerheads or similar); Skidders (R/T with or without attachments); Screed Operator; Trenching Machines (under 7 ft depth capacity); Vacuum Drill (reverse circulation drill under 8 inch bit) | $37.34 | $22.45 | $59.79 |
| POWER EQUIPMENT OPERATOR: GROUP 3 A-Frame Truck (2 or more drums); Assistant Regrigeration Plant and Chiller Operator (over 1000 ton); Backfillers (Cleveland and similar); Batch Plant and Wet Mix Operator single unit (concrete); Belt-crete Conveyors with power pack or similar; Belt Laoder (Kocal or similar); Bend Machine; Bob Cat; Boring Machine (earth); Boring Machine (rock under 8 inch bit) (Quarry Master, Joy or similar); Bump Cutter (Wayne, Saginau or similar); Canal Lining Machine (concrete) Chipper (without crane), Cleaning and Doping Machine (pipeline); Curb Extruder (Asphalt and Concrete); Deck Engineer; Elevating Belt-type Loader (Euclid, Barber Green and similar); Elevating Grader-type Loader (Dumor, Adams or similar); Generator Plant Engineers (diesel, electric); Gunite Combination Mixer and Compressor; Locomotive Engineer; Mixermobile; Posthole Auger or Punch; Pump (grout or jet); Soil Stabilizer (P & H or similar); Spreader Machine; Surface Heater and Planer Machine; Tractor (to D-6 or equivalent) and Traxacavator; Traverse Finish Machine; Turnhead Operator | $36.99 | $22.45 | $59.44 |
| POWER EQUIPMENT OPERATOR: GROUP 2 A-Frame Truck (single drum); Assistant Refrigeration Plant (under 1000 ton); Assistant Plant Operator, Fireman or Pugmixer (asphalt); Bagley or Stationary Scraper; Belt Finishing Machine; Blower Operator (cement); Cement Hog; Compresor (2000 CFM or over, 2 or more, gas, diesel or electric power); Concrete Saw (multiple cut); Distributor Leverman; Ditch Witch or similar; Elevator, hoisting materials; Dope Pots (power agitated); Fork Lift or Lumber Stacker, Hydra-lift and similar; Gin Trucks (pipeline); Hoist, single drum; Loaders (bucket, elevators and conveyors); Longitudinal Float; Mixer (portable - concrete); Pavement Breaker, Hydra-hammer and similar; Power Broom; Spray Curing Machine (concrete); Spreader Box (self-propelled); Straddle Buggy (Ross and similar on construction job only); Tractor (Farm type R/T with attachments, except Backhoe); Tugger Operator | $36.28 | $22.45 | $58.73 |
| POWER EQUIPMENT OPERATOR: GROUP 1 Bit Grinders; Bolt Threading Machine; Compressors (under 2000 CFM, gas, diesel or electric power); Crusher Feeder (mechanical); Deck Hand; Drillers Tender; Fireman and Heater Tender; Grade Checker; Tender Mechanic, Welder H.D.; Hydro- seeder, Mulcher, Nozzleman; Oiler; Oiler and Cable Tender, Mucking Machine; Pumpman; Rollers, all types on subgrade (farm type, Case, John Deere and similar, or Compacting Vibrator), except when pulled by Dozer with operable blade; Steam Cleaner; Welding Machine | $35.91 | $22.45 | $58.36 |
| PLUMBER/PIPEFITTER | $62.95 | $33.76 | $96.71 |
| PAINTER (SOFT FLOOR COVERS, GLAZIERS, SPRAY PAINTERS, STEEL PAINTERS, STEAM CLEAN AND ACID ETCHING, SIGN WRITERS) | $38.11 | $16.27 | $54.38 |
| LABORER: GROUP 9 Grade Checker | $38.03 | $16.30 | $54.33 |
| LABORER: GROUP 8 Powderman | $37.65 | $16.30 | $53.95 |
| LABORER: GROUP 7 Hod Carrier | $37.10 | $16.30 | $53.40 |
| LABORER: GROUP 6 Construction Specialist | $35.94 | $16.30 | $52.24 |
| LABORER: GROUP 5 SANDHOGS-[ (38-44 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $312.36 | $16.30 | $328.66 |
| LABORER: GROUP 5 SANDHOGS-[ (26-32 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $307.99 | $16.30 | $324.29 |
| LABORER: GROUP 5 SANDHOGS-[ (22-26 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $305.37 | $16.30 | $321.67 |
| LABORER: GROUP 5 SANDHOGS-[ (14-18 LBS),(6 HRS)] RATE PER SHIFT(RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $300.77 | $16.30 | $317.07 |
| LABORER: GROUP 5 SANDHOGS-[ (1-14 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $295.84 | $16.30 | $312.14 |
| LABORER: GROUP 5 OUTSIDE LOCK AND GAUGE TENDER (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $288.48 | $16.30 | $304.78 |
| LABORER: GROUP 5 SANDHOGS-[ (32-38 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $310.95 | $16.30 | $327.25 |
| LABORER: GROUP 5 SANDHOGS-[ (18-22 LBS),(6 HRS)] RATE PER SHIFT. (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $301.05 | $16.30 | $317.35 |
| LABORER: GROUP 4 Drills with dual masts, Miner, Class """"D"""" (to include Raise and Shaft Miner, Laser Beam Operator on raises and shafts.) Welder, electric, manual or automatic, Remote Equipment Operator (to include HDPE or similar pipe and liner) | $36.06 | $16.30 | $52.36 |
| LABORER: GROUP 3- AIR AND HYDRAULIC TRACK DRILL, ASPHALT RAKER, BRUSH MACHINE (TO INCLUDE HORIZONTAL CONSTRUCTION JOINT CLEAN-UP BRUSH MACHINE, POWER PROPELLED); CAISSON WORKER, FREE AIR; CHAIN SAW OPERATOR AND FALLER; CONCRETE STACK (TO INCLUDE LABORERS WHEN WORKING ON FREE STANDING CONCRETE STACKS FOR SMOKE OR FUME CONTROL ABOVE 40 FT HIGH); FUNNITE (TO INCLUDE OPERATION OF MACHINE AND NOZZLE); GUNNITE (TO INCLUDE OPERATION OF MACHINE AND NOZZEL); HIGH SCALER; MINER, CLASS ""C"" (TO INCLUDE MINER, NOZZLEMAN FOR CONCRETE, LASER BEAM OPERATOR, AND RIGGER ON TUNNELS); MONITOR OPERATOR (AIR TRACK OR SIMILAR MOUNTING); MORTAR MIXER; NOZZLEMAN (TO INCLUDE JET BLASTING NOZZLEMAN, OVER 1200 LBS., JET BLAST MACHINE, POWER PROPELLED, SANDBLAST NOZZLE, SQUEEZE AND FLO-CRETE NOZZLE); PAVEMENT BREAKER, 90 LBS. & OVER; PIPELAYER (TO INCLUDE WORKING TOPMAN, CAULKER, COLLARMAN, JOINTER, MORTARMAN, RIGGER, JACKER, SHORER, VALVE OR METER INSTALLER, TEMPER, (INCLUDING PRESSURIZED AND NON-PRESSURIZED DUCTILE PIPE, GRAVITY PIPE AND HDPE (FUSED AND NON-FUSED); PIPEWRAPPER; PLASTERER TENDER, TRENCHLESS TECHNOLOGY, VIBRATORS (ALL); LASER BEAM OPERATOR (ELEVATION CONTROL; TECHNICIAN) | $35.74 | $16.30 | $52.04 |
| LABORER: GROUP 1- FLAGMAN, LANDSCAPE LABORER, SCALEMAN, TRAFFIC CONTROL SUPERVISOR, ASBESTOS ABATEMENT WORKER, BRICK PAVERS (TO INCLUDE THE INSTALLATION OF BRICK OR GRASS PAVERS FOR SIDEWALKS, DRIVEWAYS, STREETS, AND PARKING LOTS), BRUCH HOG FEEDER; CARPENTER TENDER; CEMENT HANDLER; CONCRETE SIGNALMAN; CONCRETE CREWMAN (TO INCLUDE STRIPPING OF FORMS, HAND OPERATING JACKS ON SLIP FORM CONSTRUCTION, APPLICATION OF CONCRETE CURING COMOUNDS, PUMPCRETE MACHINE, SIGNALING, HANDLING THE NOZZLE OF SQUEEZCRETE OR SIMILAR MACHINE-6 INCHES AND SMALLER); CONFINED SPACE ATTENDANT, CRUSHER FEEDER; DEMOLITION (TO INCLUDE CLEAN-UP, BURNING, LOADING, WRECKING AND SALVAGE OF ALL MATERIAL); DRY STACK WALLS (INCLUDING ALL DRY STACK WALLS, INCLUDING KEYSTONE WALLS AND OTHERS USING BLOCKS AND INTERLOCKING PEGS.), DUMPMAN; TRAFFIC CONTROL LABORER (TO INCLUDE BUT IS NOT LIMITED TO, ERECTION AND MAINTENANCE OF BARRICADES, SIGNS AND RELIEF OF FLAG PERSON.), WINDOW WASHER/CLEANER, PILOT CAR, HAZARDOUS WASTE WORKER, EROSION CONTROL LABORER, FENCE ERECTOR, GUARD RAIL (TO INCLUDE GUARD RAIL, GUIDE AND REFERENCE POSTS, SIGN POSTS, AND RIGHT-OF-WAY MARKERS); FIREWATH. FORM CLEANING MACHINE FEEDER; STACKER; GENERAL LABORER; GROUP MACHINE HEADER TENDER; MINER, CLASS ""A"" (TO INCLUDE BULL GNAG, CONCRETE CREWMAN, DUMPAN AND PUMPCRETE CREWMAN, INCLUDING DISTRIBUTING PIP, ASSEMBLY AND DISMANTLE, AND NIPPER); LEAD ABATEMENT WORKER, MOLD ABATEMENT WORKER, NIPPER; RIPRAP MAN; SANDBLAST TAILHOSEMAN, SCAFFOLD ERECTOR (WOOD OR STEEL); STAKE JUMPER; STRUCTURAL MOVER (TO INCLUDE SEPARATING FOUNDATION, PREPARATION, CRIBBING, SHORING, JACKING AND UNLOADING OF STRUCTURES); TAILHOSEMAN (WATER NOSSEL); TIMBER BUCKER AND FALLER (BY HAND); TRACK LABORER (RR); TRUCK LOADER; WELLPOINT MAN; (hdpe OR SIMILAR LINER INSTALLER) | $35.10 | $16.30 | $51.40 |
| IRONWORKER | $41.91 | $32.27 | $74.18 |
| ELECTRICIAN: ELECTRICIANS | $58.00 | $25.92 | $83.92 |
| ELECTRICIAN: CABLE SPLICERS | $60.90 | $26.01 | $86.91 |
| DRYWALL FINISHER/TAPER | $35.45 | $18.13 | $53.58 |
| CEMENT MASON/CONCRETE FINISHER (GROUP 3) Grinding, bushing or chipping of toxic materials or high density concrete; Operating of power tools on a scaffold | $40.68 | $17.04 | $57.72 |
| CEMENT MASON/CONCRETE FINISHER (GROUP 2) Power troweling machine operator; Troweling of magnesite, torganal or material with epoxy bases of oxichloride base; All power grinders, bushing hammer, chipping gun; Gunite Nozzleman. All sandblasting for architectural finishes, patch preparation and exposing of aggregate for finish; Concrete sawing and cutting for concrete and expansion joints and scoring for decorative patterns; Operating of Clary-type floats, Longitudinal Floats, Rodding Machines and Belting Machines; Scarifiers; Working on scaffolds | $40.17 | $17.04 | $57.21 |
| CEMENT MASON/CONCRETE FINISHER (GROUP 1) Rodding, tamping, floating, troweling, patching, stoning, rubbing, sack rubbing; All exposed aggregate finishing and sealing. All architectural finishing, staining, stamping and coloring, washing and power washing of concrete, polymer, latex and composite materials; Setting of screeds, screeds forms, curb and gutter and sidewalk forms; Preparation of all concrete for caulking of the joints and the caulking of expansion joints; Preparation of concrete for the application of hardners, sealers and curing compounds and their application; Grouting and dry packing of machine base; Removal of snap ties and she bolts prior to patching of concrete | $39.55 | $17.04 | $56.59 |
| CARPENTER: PILEDRIVER | $47.41 | $16.56 | $63.97 |
| CARPENTER: TENDERS | $51.73 | $16.56 | $68.29 |
| CARPENTER: MILLWRIGHT & MACHINE ERECTOR | $59.83 | $19.05 | $78.88 |
| CARPENTER: DIVERS | $52.73 | $16.56 | $69.29 |
| CARPENTER: CARPENTERS | $45.86 | $16.56 | $62.42 |
| BRICKLAYER | $38.48 | $20.09 | $58.57 |
| BOILERMAKER | $43.83 | $32.56 | $76.39 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $44.51 | $22.89 | $67.40 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
| 2 | 05/20/2026 |
Counties Covered
This wage determination applies to 2 counties in Washington.
Get notified when WA20260002 is modified
This determination has been revised 3 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.