WA20260022

Building

Davis-Bacon Act general wage determination for building construction in Washington.

Modification 1, revised 05/18/2026 30 trade rates 1 county View on SAM.gov

Track WA20260022

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0007-005 Effective 06/01/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR (PIPE INSULATION) $75.37 $18.82 $94.19
BRWA0001-015 Effective 06/01/2025
Trade Rate Fringe Total
BRICKLAYER $55.34 $20.05 $75.39
BRWA0001-016 Effective 06/01/2025
Trade Rate Fringe Total
TILE SETTER $49.70 $18.62 $68.32
TILE FINISHER $40.98 $18.17 $59.15
CARP0096-001 Effective 06/01/2025
Trade Rate Fringe Total
MILLWRIGHT $55.39 $22.38 $77.77
CARP0425-003 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC, DRYWALL HANGER & FORM WORK) $63.98 $19.13 $83.11
ELEC0046-006 Effective 08/04/2025
Trade Rate Fringe Total
ELECTRICIAN $75.96 $33.48 $109.44
ENGI0302-023 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS $55.43 $27.57 $83.00
ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) $63.35 $27.57 $90.92
ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS $62.47 $27.57 $90.04
ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS $61.56 $27.57 $89.13
ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10 $60.67 $27.57 $88.24
IRON0086-003 Effective 07/07/2025
Trade Rate Fringe Total
IRONWORKER (REINFORCING, STRUCTURAL AND ORNAMENTAL) $57.94 $34.52 $92.46
LABO0252-008 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL $52.31 $17.01 $69.32
LABORER: ZONE 1: GROUP 4 PIPE LAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL $51.52 $16.99 $68.51
LABORER: ZONE 1: GROUP 3 GENERAL OR COMMON LABORER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL $50.38 $16.96 $67.34
PAIN0188-001 Effective 07/01/2025
Trade Rate Fringe Total
GLAZIER $61.14 $23.76 $84.90
PAIN0300-004 Effective 07/01/2025
Trade Rate Fringe Total
PAINTER (BRUSH AND ROLLER, EXCLUDES SPRAY AND DRYWALL FINISHING/TAPING) $41.24 $14.70 $55.94
PAIN1238-002 Effective 07/01/2025
Trade Rate Fringe Total
SOFT FLOOR LAYER (INCLUDING VINYL AND CARPET) $42.01 $20.20 $62.21
PLAS0528-004 Effective 06/01/2024
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $54.16 $21.27 $75.43
PLUM0032-010 Effective 06/01/2025
Trade Rate Fringe Total
PLUMBERS AND PIPEFITTERS $75.21 $33.88 $109.09
ROOF0054-001 Effective 06/01/2023
Trade Rate Fringe Total
ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) $44.50 $16.45 $60.95
SFWA0699-006 Effective 01/01/2023
Trade Rate Fringe Total
SPRINKLER FITTER (FIRE SPRINKLERS) $44.13 $26.40 $70.53
SHEE0066-003 Effective 06/01/2025
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT WORK ONLY) $69.86 $33.39 $103.25
SUWA2002-002 Effective 06/18/2009
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK $23.50 $6.87 $30.37
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION $24.83 $0.00 $24.83
PLUMBER $35.00 $0.00 $35.00
PAINTER: SPRAY $17.80 $4.18 $21.98
PAINTER: DRYWALL FINISHING/TAPING $33.32 $0.00 $33.32
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $27.94 $0.00 $27.94

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Washington.

Get notified when WA20260022 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.