Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0007-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $75.37 | $18.82 | $94.19 |
BRWA0001-013 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $49.70 | $18.62 | $68.32 |
| TILE FINISHER | $40.98 | $18.17 | $59.15 |
BRWA0001-015 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $55.34 | $20.05 | $75.39 |
CARP0096-001 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $55.39 | $22.38 | $77.77 |
CARP0425-003 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC, DRYWALL HANGER & FORM WORK) | $63.98 | $19.13 | $83.11 |
ELEC0191-013 Effective 06/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (ISLAND, SAN JUAN, SKAGIT, SNOHOMISH AND WHATCOM COUNTIES) | $53.20 | $27.51 | $80.71 |
ENGI0302-023 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS | $55.43 | $27.57 | $83.00 |
| ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) | $63.35 | $27.57 | $90.92 |
| ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS | $62.47 | $27.57 | $90.04 |
| ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS | $61.56 | $27.57 | $89.13 |
| ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10 | $60.67 | $27.57 | $88.24 |
IRON0086-011 Effective 07/07/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (REINFORCING, STRUCTURAL AND ORNAMENTAL) | $57.94 | $34.52 | $92.46 |
LABO0292-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $52.31 | $17.01 | $69.32 |
| LABORER: ZONE 1: GROUP 4 PIPE LAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $51.52 | $16.99 | $68.51 |
| LABORER: ZONE 1: GROUP 3 COMMON OR GENERAL LABORER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $50.38 | $16.96 | $67.34 |
PAIN0188-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $61.14 | $23.76 | $84.90 |
PAIN0300-004 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (BRUSH AND ROLLER, EXCLUDES SPRAY AND DRYWALL FINISHING/TAPING) | $41.24 | $14.70 | $55.94 |
PAIN1238-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SOFT FLOOR LAYER (INCLUDING VINYL AND CARPET) | $42.01 | $20.20 | $62.21 |
PLAS0528-004 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 |
PLUM0026-014 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER | $60.72 | $34.15 | $94.87 |
ROOF0054-010 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | $44.50 | $16.45 | $60.95 |
SFWA0699-006 Effective 01/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $44.13 | $26.40 | $70.53 |
SHEE0066-033 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEETMETAL WORKER (HVAC DUCT INSTALLATION ONLY) | $66.05 | $29.41 | $95.46 |
SUWA2002-018 Effective 06/18/2009 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $23.50 | $6.87 | $30.37 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $24.83 | $0.00 | $24.83 |
| PLUMBER | $35.00 | $0.00 | $35.00 |
| PAINTER: SPRAY | $17.80 | $4.18 | $21.98 |
| PAINTER: DRYWALL FINISHING/TAPING | $29.90 | $0.00 | $29.90 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.94 | $0.00 | $27.94 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Washington.
Get notified when WA20260038 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.