WA20260042
BuildingDavis-Bacon Act general wage determination for building construction in Washington.
Track WA20260042
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BRWA0003-002 Effective 06/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $33.95 | $19.33 | $53.28 |
BRWA0003-009 Effective 06/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $29.86 | $13.95 | $43.81 |
CARP0059-022 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING DRYWALL HANGING AND FORM WORK) | $44.21 | $17.28 | $61.49 |
ELEC0073-004 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $49.55 | $19.09 | $68.64 |
ENGI0302-133 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 8 LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) | $42.36 | $23.40 | $65.76 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER) LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) | $40.39 | $23.40 | $63.79 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC | $40.05 | $23.40 | $63.45 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.) | $39.71 | $23.40 | $63.11 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T) | $39.51 | $23.40 | $62.91 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) | $39.31 | $23.40 | $62.71 |
| POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT | $38.56 | $23.40 | $61.96 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS | $38.17 | $23.40 | $61.57 |
IRON0014-012 Effective 07/07/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $43.40 | $32.77 | $76.17 |
LABO0238-007 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER, MASON TENDER BRICK | $38.05 | $16.75 | $54.80 |
LABO0238-008 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: A-1: GROUP 10 GRADE CHECKER | $40.21 | $16.90 | $57.11 |
| LABORER: A-1: GROUP 3 CEMENT/CONCRETE; PIPELAYER | $37.46 | $16.90 | $54.36 |
PAIN0427-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| DRYWALL FINISHER/TAPER | $37.46 | $18.42 | $55.88 |
PAIN0427-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH, ROLLER, AND SPRAY | $33.95 | $15.65 | $49.60 |
PAIN1238-003 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| FLOOR LAYER: CARPET AND VINYL | $42.01 | $20.20 | $62.21 |
PLAS0072-008 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
PLUM0044-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER | $47.15 | $27.20 | $74.35 |
ROOF0189-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | $35.75 | $14.40 | $50.15 |
SFWA0699-005 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $44.30 | $28.58 | $72.88 |
SHEE0055-012 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEETMETAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $45.83 | $27.92 | $73.75 |
SUWA2002-022 Effective 06/18/2009 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $23.50 | $6.87 | $30.37 |
| PLUMBER | $35.00 | $0.00 | $35.00 |
| PIPE INSULATOR/WRAPPER | $24.21 | $4.07 | $28.28 |
| OPERATOR: CRANE | $25.53 | $0.00 | $25.53 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.94 | $0.00 | $27.94 |
| LABORER: COMMON OR GENERAL | $17.27 | $0.00 | $17.27 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/23/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Washington.
Get notified when WA20260042 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.