WA20260045

Heavy

Davis-Bacon Act general wage determination for heavy construction in Washington.

Modification 2, revised 05/18/2026 26 trade rates 1 county View on SAM.gov

Track WA20260045

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

CARP0059-024 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER (INCLUDING FORM WORK) $44.21 $17.28 $61.49
CARP1607-009 Effective 06/01/2025
Trade Rate Fringe Total
MILLWRIGHT $61.62 $20.43 $82.05
ELEC0077-001 Effective 02/01/2023
Trade Rate Fringe Total
LINE CONSTRUCTION: LINEMEN $60.54 $24.88 $85.42
ELEC0191-015 Effective 06/01/2020
Trade Rate Fringe Total
ELECTRICIAN $46.15 $26.10 $72.25
ENGI0302-126 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) $45.36 $23.40 $68.76
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE $43.39 $23.40 $66.79
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC $43.05 $23.40 $66.45
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); BOOM TRUCK (UNDER 25 TONS) $42.71 $23.40 $66.11
POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T); OILER $42.51 $23.40 $65.91
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) $42.31 $23.40 $65.71
POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT $41.56 $23.40 $64.96
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS $41.17 $23.40 $64.57
IRON0014-001 Effective 07/07/2025
Trade Rate Fringe Total
IRONWORKER (REINFORCING AND STRUCTURAL) $43.40 $32.77 $76.17
LABO0238-003 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: A-2: GROUP 10 GRADE CHECKER $43.21 $16.90 $60.11
LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS $40.46 $16.90 $57.36
LABORER: A-2: GROUP 1 FLAGGER $37.03 $16.90 $53.93
LABO0238-007 Effective 06/01/2025
Trade Rate Fringe Total
LABORER, MASON TENDER BRICK $38.05 $16.75 $54.80
PAIN0427-003 Effective 07/01/2025
Trade Rate Fringe Total
PAINTER (BRUSH, ROLLER, AND SPRAY.) $36.26 $17.01 $53.27
SUWA2009-036 Effective 08/07/2009
Trade Rate Fringe Total
TRUCK DRIVER: 10 YARD TRUCK $24.61 $8.34 $32.95
TRUCK DRIVER: WATER TRUCK $24.36 $8.30 $32.66
TRUCK DRIVER: DUMP TRUCK $19.67 $0.00 $19.67
PIPEFITTER $25.98 $3.98 $29.96
OPERATOR: DRILL $28.15 $8.20 $36.35
LABORER: LANDSCAPE $14.67 $0.00 $14.67
LABORER: COMMON OR GENERAL $22.68 $0.00 $22.68
CEMENT MASON/CONCRETE FINISHER $17.21 $0.00 $17.21

Modification History

Modification Publication Date
1 01/23/2026
2 05/18/2026

Counties Covered

This wage determination applies to 1 county in Washington.

Get notified when WA20260045 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.