WA20260105
BuildingDavis-Bacon Act general wage determination for building construction in Washington.
Track WA20260105
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BRWA0001-020 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $49.60 | $25.18 | $74.78 |
BRWA0001-025 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $43.93 | $21.81 | $65.74 |
| TILE FINISHER | $32.68 | $16.48 | $49.16 |
CARP0503-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $54.69 | $16.81 | $71.50 |
ENGI0701-053 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $52.55 | $17.15 | $69.70 |
| OPERATOR: LOADER (LESS THAN 25,000 LBS.) | $51.31 | $17.15 | $68.46 |
| OPERATOR: LOADER (25,000 LBS. AND LESS THAN 60,000 LBS.) | $52.55 | $17.15 | $69.70 |
| OPERATOR: GRADER/BLADE | $52.55 | $17.15 | $69.70 |
| OPERATOR: BULLDOZER (OVER 70,000 LBS. UP TO AND INCLUDING 120,000 LBS.) | $55.88 | $17.15 | $73.03 |
| OPERATOR: BLADE FINISH | $52.55 | $17.15 | $69.70 |
IRON0086-006 Effective 07/07/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER | $57.94 | $34.52 | $92.46 |
LABO0242-015 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: FORM STRIPPING | $50.38 | $16.96 | $67.34 |
LABO0242-018 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: JACKHAMMER | $51.52 | $16.99 | $68.51 |
LABO0242-020 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 |
LABO0252-017 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER, MASON TENDER BRICK | $50.38 | $16.96 | $67.34 |
LABO0335-006 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL | $44.06 | $15.60 | $59.66 |
LABO0335-007 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: FIRE WATCH | $40.56 | $15.60 | $56.16 |
LABO0335-012 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: HOD CARRIER | $48.14 | $15.60 | $63.74 |
LABO0335-021 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SCAFFOLD BUILDER | $44.06 | $15.60 | $59.66 |
PAIN0300-003 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER | $41.24 | $14.70 | $55.94 |
PLAS0555-008 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 | $66.44 |
PLUM0026-015 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER | $60.72 | $34.15 | $94.87 |
ROOF0153-003 Effective 02/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $48.01 | $16.44 | $64.45 |
SHEE0066-014 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER | $69.86 | $33.39 | $103.25 |
SUWA2018-005 Effective 03/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $47.74 | $28.52 | $76.26 |
| OPERATOR: ROLLER | $42.04 | $12.79 | $54.83 |
| OPERATOR: OILER | $36.39 | $16.62 | $53.01 |
| OPERATOR: MECHANIC | $40.77 | $15.91 | $56.68 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 | $50.09 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $37.76 | $7.02 | $44.78 |
| LABORER: GRADE CHECKER | $31.86 | $12.98 | $44.84 |
| LABORER: PIPELAYER | $32.17 | $11.49 | $43.66 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.66 | $9.76 | $36.42 |
| LABORER: CONCRETE SAW CHAIN | $35.03 | $10.86 | $45.89 |
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $39.50 | $14.21 | $53.71 |
TEAM0174-009 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: CONCRETE TRUCK | $55.43 | $27.52 | $82.95 |
TEAM0589-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK (LESS THAN 16 YARD CAPACITY) | $53.84 | $27.52 | $81.36 |
| TRUCK DRIVER: DUMP TRUCK (16 TO 30 YARD CAPACITY) | $54.68 | $27.52 | $82.20 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Washington.
Get notified when WA20260105 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.