Modification 1, revised 05/18/2026 57 trade rates 1 county View on SAM.gov

Track WA20260113

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0007-007 Effective 06/01/2025
Trade Rate Fringe Total
HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) $75.37 $18.82 $94.19
BRWA0001-013 Effective 06/01/2025
Trade Rate Fringe Total
TILE SETTER $49.70 $18.62 $68.32
TILE FINISHER $40.98 $18.17 $59.15
BRWA0001-015 Effective 06/01/2025
Trade Rate Fringe Total
BRICKLAYER $55.34 $20.05 $75.39
BRWA0001-022 Effective 06/01/2025
Trade Rate Fringe Total
TERRAZZO WORKER/SETTER $51.70 $18.62 $70.32
TERRAZZO FINISHER $40.98 $18.17 $59.15
MASON - STONE $55.34 $20.05 $75.39
MARBLE SETTER $49.70 $18.62 $68.32
MARBLE FINISHER $40.98 $18.17 $59.15
CARP0096-001 Effective 06/01/2025
Trade Rate Fringe Total
MILLWRIGHT $55.39 $22.38 $77.77
CARP0425-003 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC, DRYWALL HANGER & FORM WORK) $63.98 $19.13 $83.11
ELEC0191-006 Effective 01/01/2024
Trade Rate Fringe Total
ELECTRICIAN $55.01 $29.20 $84.21
ENGI0302-096 Effective 06/01/2025
Trade Rate Fringe Total
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) $61.93 $27.57 $89.50
OPERATOR: GRADER/BLADE $61.93 $27.57 $89.50
OPERATOR: BULLDOZER (D9 & UNDER) $60.46 $27.57 $88.03
OPERATOR: BLADE FINISH $61.14 $27.57 $88.71
ENGI0302-102 Effective 06/01/2025
Trade Rate Fringe Total
OPERATOR: SCREED $61.14 $27.57 $88.71
OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) $60.46 $27.57 $88.03
OPERATOR: ROLLER (OTHER THAN PLANT MIX) $56.63 $27.57 $84.20
OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) $60.46 $27.57 $88.03
OPERATOR: OILER (DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) $61.14 $27.57 $88.71
OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) $61.14 $27.57 $88.71
OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) $61.93 $27.57 $89.50
OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) $61.93 $27.57 $89.50
IRON0086-006 Effective 07/07/2025
Trade Rate Fringe Total
IRONWORKER $57.94 $34.52 $92.46
LABO0242-011 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) $50.38 $16.96 $67.34
LABO0242-012 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $52.31 $17.01 $69.32
LABO0242-015 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: FORM STRIPPING $50.38 $16.96 $67.34
LABO0242-017 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: GRADE CHECKER $52.31 $17.01 $69.32
LABO0242-018 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: JACKHAMMER $51.52 $16.99 $68.51
LABO0242-019 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: MASON TENDER - CEMENT/CONCRETE $50.38 $16.96 $67.34
LABO0242-020 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: NOZZLE PERSON $52.31 $17.01 $69.32
LABO0242-021 Effective 06/01/2025
Trade Rate Fringe Total
SCAFFOLD BUILDER $50.38 $16.96 $67.34
LABO0242-022 Effective 06/01/2025
Trade Rate Fringe Total
TRAFFIC CONTROL: FLAGGER $40.88 $16.72 $57.60
LABO0252-017 Effective 06/01/2025
Trade Rate Fringe Total
LABORER, MASON TENDER BRICK $50.38 $16.96 $67.34
LABO0292-011 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: CONCRETE SAW CHAIN $51.52 $16.99 $68.51
LABO0335-007 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: FIRE WATCH $40.56 $15.60 $56.16
PAIN0188-001 Effective 07/01/2025
Trade Rate Fringe Total
GLAZIER $61.14 $23.76 $84.90
PAIN0300-003 Effective 07/01/2025
Trade Rate Fringe Total
PAINTER $41.24 $14.70 $55.94
PAIN0364-001 Effective 07/01/2025
Trade Rate Fringe Total
DRYWALL FINISHER/TAPER $53.59 $23.65 $77.24
PAIN1238-001 Effective 07/01/2025
Trade Rate Fringe Total
FLOOR LAYER: SOFT FLOORS $42.01 $20.20 $62.21
PLAS0528-009 Effective 06/01/2024
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $54.16 $21.27 $75.43
PLAS0528-010 Effective 06/01/2024
Trade Rate Fringe Total
PLASTERER $52.50 $20.67 $73.17
PLUM0026-015 Effective 06/01/2025
Trade Rate Fringe Total
PIPEFITTER $60.72 $34.15 $94.87
PLUM0032-005 Effective 06/01/2025
Trade Rate Fringe Total
PLUMBER $75.21 $33.88 $109.09
ROOF0153-006 Effective 02/01/2024
Trade Rate Fringe Total
ROOFER $48.01 $16.44 $64.45
SFWA0699-004 Effective 07/01/2025
Trade Rate Fringe Total
SPRINKLER FITTER $68.89 $33.80 $102.69
SHEE0066-014 Effective 06/01/2025
Trade Rate Fringe Total
SHEET METAL WORKER $69.86 $33.39 $103.25
SUWA2018-013 Effective 03/01/2024
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK $35.46 $13.00 $48.46
OPERATOR: MECHANIC $42.85 $19.20 $62.05
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $40.53 $9.56 $50.09
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $45.65 $0.00 $45.65
LABORER: PIPELAYER $35.83 $10.89 $46.72
LABORER: LANDSCAPE $18.22 $5.60 $23.82
LABORER: COMMON OR GENERAL $36.71 $9.91 $46.62
TEAM0174-009 Effective 06/01/2025
Trade Rate Fringe Total
TRUCK DRIVER: CONCRETE TRUCK $55.43 $27.52 $82.95
TEAM0174-011 Effective 06/01/2025
Trade Rate Fringe Total
TRUCK DRIVER: PICKUP TRUCK $51.78 $27.52 $79.30

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Washington.

Get notified when WA20260113 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.