WA20260118
BuildingDavis-Bacon Act general wage determination for building construction in Washington.
Track WA20260118
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0007-007 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $75.37 | $18.82 | $94.19 |
BRWA0001-013 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $49.70 | $18.62 | $68.32 |
| TILE FINISHER | $40.98 | $18.17 | $59.15 |
BRWA0001-015 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $55.34 | $20.05 | $75.39 |
CARP0425-001 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $63.98 | $19.13 | $83.11 |
ELEC0191-006 Effective 01/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $55.01 | $29.20 | $84.21 |
ENGI0302-097 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $61.47 | $27.57 | $89.04 |
| OPERATOR: GRADER/BLADE | $61.47 | $27.57 | $89.04 |
| OPERATOR: BULLDOZER (D9 & UNDER) | $60.02 | $27.57 | $87.59 |
| OPERATOR: BLADE FINISH | $60.69 | $27.57 | $88.26 |
ENGI0302-103 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | $60.69 | $27.57 | $88.26 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) | $61.47 | $27.57 | $89.04 |
| OPERATOR: CRANE (45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $61.47 | $27.57 | $89.04 |
| OPERATOR: CRANE (200 TONS- 299 TONS, OR 250? OF BOOM INCLUDING JIB WITH ATTACHMENTS.) | $63.29 | $27.57 | $90.86 |
| OPERATOR: CRANE (20 TONS THROUGH 44 TONS WITH ATTACHMENTS; TRUCK CRANE OILER/DRIVER: 100 TONS) | $60.69 | $27.57 | $88.26 |
| OPERATOR: CRANE (100 TONS THROUGH 199 TONS, OR 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $62.39 | $27.57 | $89.96 |
IRON0086-006 Effective 07/07/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER | $57.94 | $34.52 | $92.46 |
LABO0242-015 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: FORM STRIPPING | $50.38 | $16.96 | $67.34 |
LABO0242-018 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: JACKHAMMER | $51.52 | $16.99 | $68.51 |
LABO0242-019 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 | $67.34 |
LABO0242-020 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 |
LABO0252-017 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER, MASON TENDER BRICK | $50.38 | $16.96 | $67.34 |
LABO0292-011 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: CONCRETE SAW CHAIN | $51.52 | $16.99 | $68.51 |
LABO0335-007 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: FIRE WATCH | $40.56 | $15.60 | $56.16 |
PAIN0300-003 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER | $41.24 | $14.70 | $55.94 |
PLAS0528-009 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 |
PLUM0026-015 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER | $60.72 | $34.15 | $94.87 |
PLUM0026-018 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $60.72 | $34.15 | $94.87 |
SFWA0669-001 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER | $51.65 | $27.57 | $79.22 |
SHEE0066-014 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER | $69.86 | $33.39 | $103.25 |
SUWA2018-018 Effective 03/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $31.81 | $16.53 | $48.34 |
| ROOFER | $27.00 | $0.00 | $27.00 |
| OPERATOR: ROLLER | $55.10 | $3.71 | $58.81 |
| OPERATOR: OILER | $36.39 | $16.62 | $53.01 |
| OPERATOR: MECHANIC | $40.77 | $15.91 | $56.68 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 | $50.09 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $53.76 | $0.00 | $53.76 |
| LABORER: PIPELAYER | $32.17 | $11.49 | $43.66 |
| LABORER: HOD CARRIER | $33.50 | $11.08 | $44.58 |
| LABORER: COMMON OR GENERAL | $40.32 | $0.00 | $40.32 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $41.20 | $3.03 | $44.23 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $34.42 | $10.70 | $45.12 |
TEAM0174-009 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: CONCRETE TRUCK | $55.43 | $27.52 | $82.95 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Washington.
Get notified when WA20260118 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.