BRWA0001-024 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $55.34 | $20.05 | $75.39 |
CARP0196-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PILEDRIVER PERSON | $65.53 | $19.13 | $84.66 |
CARP0360-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $63.98 | $19.13 | $83.11 |
ELEC0076-001 Effective 08/31/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $65.14 | $26.56 | $91.70 |
ELEC0077-002 Effective 02/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 | $88.71 |
ELEC0077-003 Effective 02/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 | $38.97 |
| TREE TRIMMER | $42.57 | $17.97 | $60.54 |
ELEC0077-004 Effective 02/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: (CABLE SPLICER) | $64.17 | $24.77 | $88.94 |
ELEC0077-005 Effective 02/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $55.19 | $20.94 | $76.13 |
ELEC0077-006 Effective 02/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: (GROUND PERSON) | $37.53 | $17.74 | $55.27 |
ENGI0612-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: BULLDOZER | $59.96 | $27.32 | $87.28 |
ENGI0612-007 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS; PLANT FEED) | $60.63 | $27.32 | $87.95 |
ENGI0612-023 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: SCRAPER (SELF-PROPELLED UNDER 45 YARDS) | $60.63 | $27.32 | $87.95 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $59.96 | $27.32 | $87.28 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE; TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | $60.53 | $27.32 | $87.85 |
| OPERATOR: GRADER/BLADE | $61.41 | $27.32 | $88.73 |
| OPERATOR: DRILL (HORIZONTAL/DIRECTIONAL DRILL OPERATOR) | $60.63 | $27.32 | $87.95 |
| OPERATOR: DRILL (HORIZONTAL/DIRECTIONAL DRILL LOCATOR) | $59.96 | $27.32 | $87.28 |
| OPERATOR: DRILL (DRILLING MACHINE) | $62.32 | $27.32 | $89.64 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M) | $60.63 | $27.32 | $87.95 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | $61.41 | $27.32 | $88.73 |
| OPERATOR: CONCRETE PUMP (MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE) | $59.96 | $27.32 | $87.28 |
IRON0086-005 Effective 07/07/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER | $57.94 | $34.52 | $92.46 |
LABO0242-009 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 | $67.34 |
LABO0242-010 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 |
LABO0252-013 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: PIPELAYER | $51.52 | $16.99 | $68.51 |
PAIN0300-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER | $41.24 | $14.70 | $55.94 |
PLAS0528-008 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 |
PLUM0026-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $60.72 | $34.15 | $94.87 |
PLUM0032-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER | $75.21 | $33.88 | $109.09 |
SHEE0066-011 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER | $69.86 | $33.39 | $103.25 |
SUWA2018-027 Effective 03/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 | $48.46 |
| TRUCK DRIVER: DUMP TRUCK | $26.75 | $8.37 | $35.12 |
| TRAFFIC CONTROL: FLAGGER | $27.79 | $11.03 | $38.82 |
| OPERATOR: SCREED | $49.96 | $9.66 | $59.62 |
| OPERATOR: ROLLER | $47.22 | $11.61 | $58.83 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.35 | $13.44 | $45.79 |
| OPERATOR: MILLING MACHINE | $48.95 | $10.33 | $59.28 |
| OPERATOR: MECHANIC | $37.11 | $19.20 | $56.31 |
| OPERATOR: FORKLIFT | $49.89 | $0.00 | $49.89 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $51.50 | $0.00 | $51.50 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $40.11 | $14.47 | $54.58 |
| MILLWRIGHT | $51.09 | $8.85 | $59.94 |
| LABORER: FENCE ERECTOR | $29.01 | $0.00 | $29.01 |
| LABORER: LANDSCAPE | $27.40 | $0.00 | $27.40 |
| LABORER: HOD CARRIER | $38.58 | $10.89 | $49.47 |
| LABORER: CONCRETE SAW CHAIN | $36.41 | $10.89 | $47.30 |
| LABORER: COMMON OR GENERAL | $33.86 | $9.48 | $43.34 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $42.89 | $5.01 | $47.90 |
TEAM0313-001 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 | $82.95 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Washington.
Get notified when WA20260127 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.