WA20260135

Heavy

Davis-Bacon Act general wage determination for heavy construction in Washington.

Modification 1, revised 05/18/2026 108 trade rates 1 county View on SAM.gov

Track WA20260135

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ELEC0077-002 Effective 02/01/2024
Trade Rate Fringe Total
LINE CONSTRUCTION: LINE PERSON $64.17 $24.54 $88.71
ELEC0077-003 Effective 02/01/2023
Trade Rate Fringe Total
TREE TRIMMER: GROUND PERSON $22.60 $16.37 $38.97
TREE TRIMMER $42.57 $17.97 $60.54
ELEC0077-005 Effective 02/01/2024
Trade Rate Fringe Total
LINE CONSTRUCTION: EQUIPMENT OPERATOR $55.19 $20.94 $76.13
ELEC0112-010 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN $60.00 $27.78 $87.78
ENGI0302-106 Effective 06/01/2025
Trade Rate Fringe Total
OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL OPERATOR (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.23 $27.57 $86.80
OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL LOCATOR (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: DRILL: DRILLING MACHINE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $60.67 $27.57 $88.24
OPERATOR: BULLDOZER: D9 & UNDER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.23 $27.57 $86.80
ENGI0302-110 Effective 06/01/2024
Trade Rate Fringe Total
OPERATOR: ROLLER WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN $38.91 $22.45 $61.36
OPERATOR: LOADER OVERHEAD UNDER 4 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN $40.18 $22.45 $62.63
OPERATOR: LOADER OVERHEAD 4 YARDS INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN $40.69 $22.45 $63.14
Heavy Equipment Operator: Screed (East of the 120th Meridian) $40.69 $22.45 $63.14
Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (East of the 120th Meridian) $40.69 $22.45 $63.14
Heavy Equipment Operator: Mechanic (East of the 120th Meridian) $38.96 $22.45 $61.41
OPERATOR: ROLLER PLANT MIX OR MULTI-LIFT MATERIALS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $59.23 $27.57 $86.80
OPERATOR: ROLLER OTHER THAN PLANT MIX WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $55.43 $27.57 $83.00
OPERATOR: LOADER OVERHEAD UNDER 6 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $59.88 $27.57 $87.45
OPERATOR: LOADER OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $60.67 $27.57 $88.24
Heavy Equipment Operator: Screed (West of the 120th Meridian) $60.67 $27.57 $88.24
Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (West of the 120th Meridian) $60.67 $27.57 $88.24
Heavy Equipment Operator: Mechanic (West of the 120th Meridian) $61.56 $27.57 $89.13
OPERATOR: ROLLER WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN $38.91 $22.45 $61.36
OPERATOR: LOADER OVERHEAD UNDER 4 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN $40.18 $22.45 $62.63
OPERATOR: LOADER OVERHEAD 4 YARDS INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN $40.69 $22.45 $63.14
Heavy Equipment Operator: Screed (East of the 120th Meridian) $40.69 $22.45 $63.14
Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (East of the 120th Meridian) $40.69 $22.45 $63.14
Heavy Equipment Operator: Mechanic (East of the 120th Meridian) $38.96 $22.45 $61.41
OPERATOR: ROLLER PLANT MIX OR MULTI-LIFT MATERIALS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $59.23 $27.57 $86.80
OPERATOR: ROLLER OTHER THAN PLANT MIX WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $55.43 $27.57 $83.00
OPERATOR: LOADER OVERHEAD UNDER 6 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $59.88 $27.57 $87.45
OPERATOR: LOADER OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $60.67 $27.57 $88.24
Heavy Equipment Operator: Screed (West of the 120th Meridian) $60.67 $27.57 $88.24
Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (West of the 120th Meridian) $60.67 $27.57 $88.24
Heavy Equipment Operator: Mechanic (West of the 120th Meridian) $61.56 $27.57 $89.13
ENGI0302-110 Effective 06/01/2025
Trade Rate Fringe Total
OPERATOR: ROLLER WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN $38.91 $22.45 $61.36
OPERATOR: LOADER OVERHEAD UNDER 4 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN $40.18 $22.45 $62.63
OPERATOR: LOADER OVERHEAD 4 YARDS INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN $40.69 $22.45 $63.14
Heavy Equipment Operator: Screed (East of the 120th Meridian) $40.69 $22.45 $63.14
Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (East of the 120th Meridian) $40.69 $22.45 $63.14
Heavy Equipment Operator: Mechanic (East of the 120th Meridian) $38.96 $22.45 $61.41
OPERATOR: ROLLER PLANT MIX OR MULTI-LIFT MATERIALS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $59.23 $27.57 $86.80
OPERATOR: ROLLER OTHER THAN PLANT MIX WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $55.43 $27.57 $83.00
OPERATOR: LOADER OVERHEAD UNDER 6 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $59.88 $27.57 $87.45
OPERATOR: LOADER OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $60.67 $27.57 $88.24
Heavy Equipment Operator: Screed (West of the 120th Meridian) $60.67 $27.57 $88.24
Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (West of the 120th Meridian) $60.67 $27.57 $88.24
Heavy Equipment Operator: Mechanic (West of the 120th Meridian) $61.56 $27.57 $89.13
OPERATOR: ROLLER WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN $38.91 $22.45 $61.36
OPERATOR: LOADER OVERHEAD UNDER 4 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN $40.18 $22.45 $62.63
OPERATOR: LOADER OVERHEAD 4 YARDS INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN $40.69 $22.45 $63.14
Heavy Equipment Operator: Screed (East of the 120th Meridian) $40.69 $22.45 $63.14
Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (East of the 120th Meridian) $40.69 $22.45 $63.14
Heavy Equipment Operator: Mechanic (East of the 120th Meridian) $38.96 $22.45 $61.41
OPERATOR: ROLLER PLANT MIX OR MULTI-LIFT MATERIALS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $59.23 $27.57 $86.80
OPERATOR: ROLLER OTHER THAN PLANT MIX WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $55.43 $27.57 $83.00
OPERATOR: LOADER OVERHEAD UNDER 6 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $59.88 $27.57 $87.45
OPERATOR: LOADER OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN $60.67 $27.57 $88.24
Heavy Equipment Operator: Screed (West of the 120th Meridian) $60.67 $27.57 $88.24
Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (West of the 120th Meridian) $60.67 $27.57 $88.24
Heavy Equipment Operator: Mechanic (West of the 120th Meridian) $61.56 $27.57 $89.13
ENGI0302-111 Effective 06/01/2025
Trade Rate Fringe Total
OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: OILER: TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.23 $27.57 $86.80
OPERATOR: OILER: DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $60.67 $27.57 $88.24
OPERATOR: CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.23 $27.57 $86.80
OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: OILER: TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.23 $27.57 $86.80
OPERATOR: OILER: DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $60.67 $27.57 $88.24
OPERATOR: CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.23 $27.57 $86.80
ENGI0302-111 Effective 07/07/2025
Trade Rate Fringe Total
OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: OILER: TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.23 $27.57 $86.80
OPERATOR: OILER: DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $60.67 $27.57 $88.24
OPERATOR: CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.23 $27.57 $86.80
OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: OILER: TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.23 $27.57 $86.80
OPERATOR: OILER: DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 $27.57 $87.45
OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $60.67 $27.57 $88.24
OPERATOR: CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.23 $27.57 $86.80
LABO0242-010 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: NOZZLE PERSON $52.31 $17.01 $69.32
LABO0348-010 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: PIPELAYER $37.80 $16.90 $54.70
PAIN0300-002 Effective 07/01/2025
Trade Rate Fringe Total
PAINTER $41.24 $14.70 $55.94
SUWA2018-035 Effective 03/01/2024
Trade Rate Fringe Total
TRUCK DRIVER: WATER TRUCK $31.62 $16.84 $48.46
TRUCK DRIVER: DUMP TRUCK $34.94 $15.63 $50.57
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $30.61 $10.89 $41.50
TRAFFIC CONTROL: FLAGGER $27.75 $11.15 $38.90
OPERATOR: GRADER/BLADE $40.28 $16.17 $56.45
OPERATOR: FORKLIFT $45.93 $19.20 $65.13
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $43.60 $0.00 $43.60
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $48.70 $0.00 $48.70
LABORER: FENCE ERECTOR $30.21 $0.00 $30.21
LABORER: MASON TENDER - CEMENT/CONCRETE $38.46 $0.00 $38.46
LABORER: HOD CARRIER $35.06 $10.94 $46.00
LABORER: CONCRETE SAW CHAIN $37.30 $4.30 $41.60
LABORER: COMMON OR GENERAL $34.41 $0.00 $34.41
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $37.63 $11.25 $48.88
IRONWORKER $43.29 $25.63 $68.92
GRADE CHECKER $37.54 $0.00 $37.54
FORM WORKER $37.16 $14.74 $51.90
CEMENT MASON/CONCRETE FINISHER $39.33 $0.00 $39.33
CARPENTER, EXCLUDES FORM WORK $29.72 $0.00 $29.72
TEAM0313-001 Effective 06/01/2025
Trade Rate Fringe Total
TRUCK DRIVER: ASPHALT MIX $55.43 $27.52 $82.95

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Washington.

Get notified when WA20260135 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.