WA20260136
HeavyDavis-Bacon Act general wage determination for heavy construction in Washington.
Track WA20260136
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ELEC0073-009 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $49.55 | $19.09 | $68.64 |
ELEC0077-002 Effective 02/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 | $88.71 |
ELEC0077-003 Effective 02/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 | $38.97 |
| TREE TRIMMER | $42.57 | $17.97 | $60.54 |
ENGI0302-137 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| Flow-Crete, Whitman & Similar; Drill Oilers: POWER EQUIPMENT OPERATOR: Group 8 (ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $42.36 | $23.40 | $65.76 |
| Flow-Crete, Whitman & Similar; Drill Oilers: POWER EQUIPMENT OPERATOR: Group 6 (ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $40.05 | $23.40 | $63.45 |
| Flow-Crete, Whitman & Similar; Drill Oilers: POWER EQUIPMENT OPERATOR: Group 5 (ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $39.71 | $23.40 | $63.11 |
| Flow-Crete, Whitman & Similar; Drill Oilers: POWER EQUIPMENT OPERATOR: Group 4 (ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $39.51 | $23.40 | $62.91 |
| Flow-Crete, Whitman & Similar; Drill Oilers: POWER EQUIPMENT OPERATOR: Group 3 (ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $39.31 | $23.40 | $62.71 |
| Flow-Crete, Whitman & Similar; Drill Oilers: POWER EQUIPMENT OPERATOR: Group 2 (ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $38.56 | $23.40 | $61.96 |
| Flow-Crete, Whitman & Similar; Drill Oilers: POWER EQUIPMENT OPERATOR: Group 1 (ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $38.17 | $23.40 | $61.57 |
ENGI0302-138 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: Group 9 (PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $46.34 | $23.40 | $69.74 |
| POWER EQUIPMENT OPERATOR: Group 8 (PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $45.36 | $23.40 | $68.76 |
| POWER EQUIPMENT OPERATOR: Group 6 (PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $43.05 | $23.40 | $66.45 |
| POWER EQUIPMENT OPERATOR: Group 5 (PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $42.71 | $23.40 | $66.11 |
| POWER EQUIPMENT OPERATOR: Group 4 (PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $42.51 | $23.40 | $65.91 |
| POWER EQUIPMENT OPERATOR: Group 3 (PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $42.31 | $23.40 | $65.71 |
| POWER EQUIPMENT OPERATOR: Group 2 (PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $41.56 | $23.40 | $64.96 |
| POWER EQUIPMENT OPERATOR: Group 1 (PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $41.17 | $23.40 | $64.57 |
IRON0014-010 Effective 07/07/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER | $43.40 | $32.77 | $76.17 |
LABO0238-039 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL | $37.13 | $16.90 | $54.03 |
LABO0238-040 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRAFFIC CONTROL: FLAGGER | $34.03 | $16.90 | $50.93 |
LABO0242-010 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 |
PAIN0300-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER | $41.24 | $14.70 | $55.94 |
PLAS0072-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $40.89 | $18.64 | $59.53 |
SUWA2018-036 Effective 03/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 | $48.46 |
| TRUCK DRIVER: DUMP TRUCK | $31.24 | $18.60 | $49.84 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $30.61 | $10.89 | $41.50 |
| PILEDRIVER PERSON | $36.50 | $10.16 | $46.66 |
| OPERATOR: MECHANIC | $34.97 | $15.31 | $50.28 |
| OPERATOR: LOADER | $33.61 | $13.62 | $47.23 |
| OPERATOR: FORKLIFT | $45.93 | $19.20 | $65.13 |
| OPERATOR: CRANE | $31.97 | $15.15 | $47.12 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $33.72 | $13.15 | $46.87 |
| LABORER: FENCE ERECTOR | $30.21 | $0.00 | $30.21 |
| LABORER: PIPELAYER | $37.55 | $0.00 | $37.55 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.51 | $2.96 | $30.47 |
| LABORER: HOD CARRIER | $35.06 | $10.94 | $46.00 |
| LABORER: CONCRETE SAW CHAIN | $36.24 | $10.89 | $47.13 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $36.96 | $8.56 | $45.52 |
| CARPENTER | $39.31 | $3.42 | $42.73 |
TEAM0313-001 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 | $82.95 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/23/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 2 counties in Washington.
Get notified when WA20260136 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.