WI20260031
ResidentialDavis-Bacon Act general wage determination for residential construction in Wisconsin.
Track WI20260031
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
CARP0231-003 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $45.46 | $31.52 | $76.98 |
ELEC0494-004 Effective 05/26/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $33.00 | $14.97 | $47.97 |
ENGI0139-009 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT (BACKHOE/EXCAVATOR (UNDER 130,000 LBS.), BULLDOZER; ROLLER) | $44.92 | $27.35 | $72.27 |
| OPERATOR: POWER EQUIPMENT (BACKHOE/EXCAVATOR (130,000 LBS. AND OVER)) | $45.67 | $27.35 | $73.02 |
LABO0113-007 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - BRICK | $21.65 | $18.73 | $40.38 |
PLUM0075-011 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $60.05 | $27.90 | $87.95 |
ROOF0065-001 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $41.50 | $25.54 | $67.04 |
SHEE0018-026 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER, INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION ((2) FOUR STORIES) | $37.14 | $29.98 | $67.12 |
| SHEET METAL WORKER, INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION ((1) THREE STORIES & UNDER) | $37.14 | $29.98 | $67.12 |
SUWI2012-015 Effective 04/04/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC UNIT INSTALLATION) | $24.83 | $0.00 | $24.83 |
| OPERATOR: LOADER | $25.70 | $9.58 | $35.28 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.95 | $9.05 | $34.00 |
| LABORER: COMMON OR GENERAL | $18.52 | $7.86 | $26.38 |
| CEMENT MASON/CONCRETE FINISHER | $23.64 | $6.42 | $30.06 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Wisconsin.
Get notified when WI20260031 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.