Cochise

5 wage determinations 137 trade rates

Popular Trades In Cochise

Track Cochise County updates

Get an email when wage determinations covering Cochise County, Arizona are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
BOILERMAKER Heavy
BOIL0627-003
$36.07 $30.59 $66.66
BRICKLAYER Building
BRAZ0003-001
$32.29 $9.97 $42.26
BRICKLAYER ZONE PAY: Heavy
BRAZ0003-005 (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOUR
$31.68 $8.90 $40.58
CARPENTER Residential
SUAZ2004-008
$13.35 0.00 $13.35
CARPENTER Highway
SUAZ2023-020
$28.08 $12.74 $40.82
CARPENTER Building
CARP1912-001
$33.19 $19.20 $52.39
CARPENTER (INCLUDING FORM WORK) Heavy
CARP0408-004 Scope differs by code/WD
$28.08 $12.74 $40.82
CARPENTER (INCLUDING FORM WORK) Heavy
CARP0408-004 Scope differs by code/WD
$28.08 $12.74 $40.82
CARPENTER: FORMWORK CONCRETE Highway
SUAZ2023-020
$29.34 $7.09 $36.43
CARPENTER: FORMWORK CONCRETE Heavy
LABO1184-050
$31.98 $9.26 $41.24
CEMENT MASON/CONCRETE FINISHER Heavy
PLAS0394-005
$28.78 $9.17 $37.95
CEMENT MASON/CONCRETE FINISHER Highway
SUAZ2023-020
$26.96 $6.45 $33.41
CEMENT MASON/CONCRETE FINISHER Building
SUAZ2019-001
$21.00 0.00 $21.00
CEMENT MASON/FINISHER Residential
SUAZ2004-008
$11.84 0.00 $11.84
DIVER Heavy
CARP1914-002 (WET): ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER
$48.29 $8.93 $57.22
DIVER Heavy
CARP1914-002 (WET): ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER
$45.17 $8.93 $54.10
DIVER Heavy
CARP1914-002 (WET): ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER
$43.79 $8.93 $52.72
DIVER Heavy
CARP1914-002 (STANDBY): ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER
$28.49 $8.93 $37.42
DIVER Heavy
CARP1914-002 (STANDBY): ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER
$25.37 $8.93 $34.30
DIVER Heavy
CARP1914-002 (STANDBY): ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER
$22.98 $8.93 $31.91
DRYWALL FINISHER/TAPER Building
SUAZ2019-001
$22.47 0.00 $22.47
ELECTRICIAN Heavy
ELEC0518-001 (APACHE COUNTY [SOUTH OF HIGHWAY 66]; ALL OF GILA COUNTY; NAVAJO COUNTY [SOUTH AND EAST OF BOUNDARY BEGINNING AT A POINT WHERE CLEAR CREEK CROSSES THE COCONINO-NAVAJO COUNTY LINE, EXTENDING NORTHEASTERLY ALONG CLEAR CREEK AND NORTHEASTERLY TO COTTONWOOD WASH, ALONG COTTONWOOD WASH NORTH EASTERLY TO WHERE IT INTERSECTS THE NAVAJO INDIAN RESERVATION, THEN EAST ALONG THE NAVAJO INDIAN RESERVATION BOUNDARY LINE TO A POINT WHERE IT INTERSECTS THE NAVAJO-APACHE COUNTY LINE]; AND PINAL COU
$36.50 $14.84 $51.34
ELECTRICIAN Heavy
ELEC0640-003 (COCONINO AND YAVAPAI COUNTIES; AND THE FOLLOWING PORTIONS OF COUNTIES: NAVAJO COUNTY (NORTH AND WEST OF A BOUNDARY BEGINNING AT A POINT WHERE CLEAR CREEK CROSSES THE COCONINO-NAVAJO COUNTY LINE, NORTHEASTERLY ALONG CLEAR CREEK AND NORTHEASTERLY TO COTTONWOOD WASH, ALONG COTTONWOOD WASH NORTHEASTERLY TO WHERE IT INTERSECTS THE NAVAJO INDIAN RESERVATION THEN EASTERLY ALONG THE NAVAJO INDIAN RESERVATION BOUNDARY LINE TO A POINT WHERE IT INTERSECTS THE NAVAJO-APACHE COUNTY LINE); PINAL
$30.30 $12.36 $42.66
ELECTRICIAN Highway
SUAZ2023-020
$28.71 $7.58 $36.29
ELECTRICIAN Heavy
ELEC0570-014 Scope differs by code/WD
$33.00 $13.04 $46.04
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) Building
ELEC0570-001
$33.00 $13.04 $46.04
ELECTRICIAN (LOW VOLTAGE WIRING) Building
SUAZ2019-001
$26.16 $9.91 $36.07
ELECTRICIAN COCHISE, GRAHAM, LA PAZ, AND SANTA CRUZ COUNTIES ZONE DEFINITIONS- ZONE A: THE AREA WITHIN A THIRTY-NINE Heavy
ELEC0570-004 (39) MILE RADIUS FROM A BASING POINT AT THE TUCSON TOWN HALL. ZONE B: 40 TO 74 MILE RADIUS FROM THE TOWN HALL IN TUCSON- AN ADDITIONAL $ 3.50 PER HOUR ZONE C: 75 MILE RADIUS FROM THE TOWN HALL IN TUCSON TO THE OUTER LIMITS OF THE GEOGRAPHIC JURISDICTION- AN ADDITIONAL $ 7.50 PER HOUR
$33.00 $13.04 $46.04
ELECTRICIAN: GROUNDPERSON Heavy
ELEC0769-003
$36.00 $16.88 $52.88
ELECTRICIAN: LINE EQUIPMENT OPERATOR Heavy
ELEC0769-004
$46.56 $19.15 $65.71
ELECTRICIAN: LINEPERSON Heavy
ELEC0769-001
$62.08 $22.49 $84.57
ELECTRICIAN/WIREMAN Residential
SUAZ2004-008
$14.24 0.00 $14.24
ELECTRICIAN/WIREMAN: Heavy
ELEC0611-005 (ZONE 1) APACHE COUNTY [AREA NORTH OF HIGHWAY 66] ZONE 1: 0 TO 10 MILES FROM GALLUP, NM ZONE 2: 10 TO 30 MILES FROM GALLUP - ADD 9% ZONE 3: 30 TO 40 MILES FROM GALLUP - ADD 15% ZONE 4: OVER 40 MILES FROM GALLUP - ADD 26%
$40.30 $13.41 $53.71
IRONWORKER Highway
SUAZ2023-020
$32.00 $17.54 $49.54
IRONWORKER, REINFORCING Building
SUAZ2019-001
$22.04 0.00 $22.04
IRONWORKER, STRUCTURAL Building
IRON0075-007
$33.00 $19.91 $52.91
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway
SUAZ2023-020
$23.85 $7.97 $31.82
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Heavy
LABO1184-022
$29.05 $9.26 $38.31
LABORER: COMMON OR GENERAL Building
SUAZ2019-001
$12.00 0.00 $12.00
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) Highway
SUAZ2023-020
$25.22 $5.08 $30.30
LABORER: FENCE ERECTOR Highway
SUAZ2023-020
$22.00 $4.03 $26.03
LABORER: GENERAL Highway
SUAZ2023-020
$23.96 $2.07 $26.03
LABORER: GENERAL Heavy
LABO1184-012
$27.41 $9.26 $36.67
LABORER: GENERAL/CLEANUP Residential
SUAZ2004-008
$7.98 0.00 $7.98
LABORER: GRADE SETTER Highway
LABO1184-027
$29.91 $9.26 $39.17
LABORER: GUARDRAIL INSTALLER Highway
SUAZ2023-020
$19.01 $2.99 $22.00
LABORER: JACKHAMMER Heavy
LABO1184-013
$29.05 $9.26 $38.31
LABORER: LANDSCAPE LABORER Highway
SUAZ2023-020
$19.44 0.00 $19.44
LABORER: MASON TENDER Highway
SUAZ2023-020
$26.48 $7.09 $33.57
LABORER: MASON TENDER Heavy
LABO1184-019
$27.41 $9.26 $36.67
LABORER: MASON TENDER - CEMENT/CONCRETE Building
SUAZ2019-001
$19.79 0.00 $19.79
LABORER: PIPELAYER Highway
SUAZ2023-020
$26.36 $7.09 $33.45
LABORER: PIPELAYER Building
SUAZ2019-001
$16.77 $1.05 $17.82
LABORER: PIPELAYER Heavy
LABO1184-020
$27.41 $9.26 $36.67
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building
SUAZ2019-001
$19.58 $3.79 $23.37
OPERATOR: LOADER Building
SUAZ2019-001
$15.00 $4.15 $19.15
OPERATOR: ROLLER Building
SUAZ2019-001
$23.62 $6.44 $30.06
PAINTER Residential
SUAZ2004-008
$9.00 0.00 $9.00
PAINTER Heavy
PAIN0086-004
$25.47 $8.00 $33.47
PAINTER Building
SUAZ2019-001
$15.00 0.00 $15.00
PAINTER: PAVEMENT MARKING Highway
SUAZ2023-020
$27.76 $6.34 $34.10
PAINTER: SIGN AND DISPLAY ERECTOR Highway
SUAZ2023-020
$19.84 $4.73 $24.57
PILEDRIVERMAN Heavy
CARP0408-004 Scope differs by code/WD
$27.38 $12.44 $39.82
PILEDRIVERMAN Heavy
CARP0408-004 Scope differs by code/WD
$27.38 $12.44 $39.82
PIPEFITTER Building
PLUM0469-009
$51.15 $21.00 $72.15
PLUMBER Residential
SUAZ2004-008
$15.45 0.00 $15.45
PLUMBER Building
SUAZ2019-001
$28.51 0.00 $28.51
PLUMBER/PIPEFITTER APACHE, COCONINO,GILA, GREENLEE, LA PAZ, NAVAJO, AND YAVAPAI Heavy
PLUM0469-006
$48.40 $19.50 $67.90
PLUMBER/PIPEFITTER COCHISE AND SANTA CRUZ Heavy
PLUM0469-006
$48.40 $19.50 $67.90
POWER EQUIPMENT OPERATOR: (CRANE/DERRICKS) Highway
ENGI0012-078
$39.17 $18.12 $57.29
POWER EQUIPMENT OPERATOR: (DRILL RIG/AUGER) Heavy
ENGI0012-048
$35.56 $18.12 $53.68
POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE Highway
SUAZ2023-020
$26.16 $6.19 $32.35
POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE Heavy
ENGI0012-045
$35.56 $18.12 $53.68
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway
SUAZ2023-020
$29.85 $8.78 $38.63
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER Heavy
ENGI0012-044
$32.29 $18.12 $50.41
POWER EQUIPMENT OPERATOR: BOOM/CRANE TRUCK Highway
SUAZ2023-020
$36.99 $12.37 $49.36
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER Highway
SUAZ2023-020
$24.22 $4.77 $28.99
POWER EQUIPMENT OPERATOR: BULLDOZER Highway
ENGI0012-046
$35.56 $18.12 $53.68
POWER EQUIPMENT OPERATOR: BULLDOZER Building
ENGI0428-016
$31.69 $13.52 $45.21
POWER EQUIPMENT OPERATOR: BULLDOZER Heavy
ENGI0012-046
$35.56 $18.12 $53.68
POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER Highway
SUAZ2023-020
$22.30 $4.14 $26.44
POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER Heavy
ENGI0012-047
$35.56 $18.12 $53.68
POWER EQUIPMENT OPERATOR: CONCRETE PUMP TRUCK Highway
SUAZ2023-020
$43.11 $10.87 $53.98
POWER EQUIPMENT OPERATOR: CONCRETE SCREED Highway
SUAZ2023-020
$26.41 $7.64 $34.05
POWER EQUIPMENT OPERATOR: CRANE Building
ENGI0428-016
$36.04 $13.52 $49.56
POWER EQUIPMENT OPERATOR: CRANE/DERRICK Heavy
ENGI0012-042
$36.64 $18.12 $54.76
POWER EQUIPMENT OPERATOR: DRILL RIG/AUGER Highway
SUAZ2023-020
$31.64 0.00 $31.64
POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE Highway
SUAZ2023-020
$31.96 $8.33 $40.29
POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE Heavy
ENGI0012-076 (GREATER THAN 1/2 CUBIC YARD)
$36.64 $18.12 $54.76
POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE Heavy
ENGI0012-076 (1/2 CUBIC YARD OR SMALLER)
$35.56 $18.12 $53.68
POWER EQUIPMENT OPERATOR: FIELD EQUIPMENT SERVICEPERSON Highway
SUAZ2023-020
$35.44 $11.45 $46.89
POWER EQUIPMENT OPERATOR: FIELD EQUIPMENT SERVICEPERSON Heavy
ENGI0012-037
$35.56 $18.12 $53.68
POWER EQUIPMENT OPERATOR: FORKLIFT Highway
SUAZ2023-020
$30.14 $12.57 $42.71
POWER EQUIPMENT OPERATOR: FORKLIFT Heavy
LABO1184-015
$30.88 $9.26 $40.14
POWER EQUIPMENT OPERATOR: GRADE CHECKER Highway
SUAZ2023-020
$24.58 $7.18 $31.76
POWER EQUIPMENT OPERATOR: GRADE CHECKER Heavy
ENGI0012-059
$36.64 $18.12 $54.76
POWER EQUIPMENT OPERATOR: GROUP 1 A-FRAME BOOM TRUCK, WINCH TRUCK, AIR COMPRESSOR, BELTCRETE, BORING BRIDGE AND TEXTURE, CONCRETE MIXER Heavy
ENGI0428-002 (SKIP TYPE), CONDUCTOR, BRAKEMAN, HANDLER, CONVEYOR, CROSS TIMING AND PIPE FLOAT, CURING MACHINE, DINKY (UNDER 20 TONS), ELEVATOR HOIST (HUSKY AND SIMILAR), FIREMEN (ALL), FORKLIFT AND ROSS CARRIER, GENERATOR (ALL), HIGHLINE CABLEWAY SIGNALMAN, HYDROGRAPHIC MULCHER, HYDROGRAPHIC SEEDER, JOINT INSERTER, JUMBO FINISHING MACHINE, KOLMAN BELT LOADER, MACHINE CONVEYOR, MULTIPLE POWER CONCRETE SAW, OILER, PAVEMENT BREAKER, POWER GRIZZLY, POWER SWEEPER, PRESSURE GROUT MACHINE, PUMP, ROLLER (EXCEPT AS OTHERWISE CLASSIFIED), SELF-PROPELLED CHIP SPREADING MACHINE, SKIPLOADER (3 CU. YD. AND LESS), SLURRY SEAL MACHINE (MOTO PAVER DRIVER), SMALL SELF-PROPELLED COMPACTOR (WITH BLADE)-BACKFILL, DITCH OPERATION, STRAW BLOWER, TRACTOR (D-5 AND UNDER), TRIPPER, TUGGER, WELDING MACHINE, WHEEL-TYPE TRACTOR (FORD, FERGUSON TYPE WITH ATTACHMENTS, BEE GEE ETC.)
$27.04 $11.72 $38.76
POWER EQUIPMENT OPERATOR: GROUP 2 AGGREGATE PLANT Heavy
ENGI0428-002 (INCLUDING CRUSHING, SCREENING AND SAND PLANTS, ETC.), ASPHALT PLANT MIXER, ASPHALT LAYDOWN MACHINE, BACKHOE (RUBBER TIRED OR TRACK, LESS THAN 1 CU. YD. MRC), BEE GEE OPERATOR BORING MACHINE, CONCRETE BATCH PLANT (ALL TYPES AND SIZES), CONCRETE MECHANICAL TAMPING, SPREADING OR FINISHING MACHINE (INCLUDING CLARY, JOHNSON OR SIMILAR TYPES), CONCRETE MIXER (PAVING TYPE AND MOBILE MIXERS), CONCRETE PUMP, CRANE (CRAWLER AND PNEUMATIC LESS THAN 15 TON CAPACITY MRC), DRILLING MACHINE (INCLUDING WATER WELLS), ELEVATING GRADER (ALL TYPES AND SIZES EXCEPT AS OTHERWISE CLASSIFIED), FIELD EQUIPMENT SERVICEMAN, PAVER AND SIMILAR TYPE EQUIPMENT, MOTOR GRADER (ANY TYPE POWER BLADE-ROUGH), OILER DRIVER, OPERATING ENGINEER RIGGER, PNEUMATIC TIRED SCRAPER (ALL SIZES AND TYPES), POWER JUMBO FORM SETTER, ROAD OIL MIXING MACHINE, ROLLER (ON ALL TYPES ASPHALT PAVEMENT), SCREED, SELF-PROPELLED COMPACTOR (WITH BLADE, 815, 825 OR EQUIVALENT-GRADE OPERATION), SKIP LOADER (ALL TYPES WITH A RATED CAPACITY OVER 3 BUT LESS THAN 6 CU. YD.), SLIP FORM (POWER DRIVEN LIFTING DEVICE FOR CONCRETE FORMS), SOIL CEMENT ROAD MIXINGMACHINE (SINGLE PASS TYPE), HEATER AND PLANER, TRACTOR (DOZER, PUSHER-ALL), TRAVELING PIPE-WRAPPING MACHINE, TRENCHING MACHINE, TUGGER (TWO OR MORE)
$30.31 $11.72 $42.03
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT OR CONCRETE PLANING, ROTOMILL AND MILLING MACHINE, AUTO GRADE MACHINE Heavy
ENGI0428-002 (CMI AND SIMILAR EQUIPMENT), BORING MACHINE (INCLUDING MOLE, BADGER AND SIMILAR TYPE), CONCRETE PUMP (TRUCK MOUNTED WITH BOOM), CRANE (CRAWLER AND PNEUMATIC OVER 15 TONS BUT LESS THAN 100 TONS CAPACITY MRC), CRAWLER TYPE TRACTOR WITH BOOM ATTACHMENT AND SLOPE BAR, DERRICK, GRADALL, HEAVY DUTY MECHANIC/WELDER, HELICOPTER HOIST OPERATOR OR PILOT, HIGHLINE CABLEWAY, MASS EXCAVATOR (150 BUCYRUS, ERIE AND SIMILAR TYPE), MECHANICAL HOIST (TWO OR MORE DRUMS), MOTOR GRADER (ANY TYPE POWER BLADE-FINISH), MUCKING MACHINE, OVERHEAD CRANE, GRADE CHECKER, PILEDRIVER ENGINEER (PORTABLE, STATIONARY OR SKID RIG), POWER DRIVEN DITCH LINING OR DITCH TRIMMING MACHINE, REMOTE CONTROL EARTH MOVING MACHINE, SKIP LOADER (ALL TYPES WITH RATED CAPACITY 6 CU. YD. BUT LESS THAN 10 CU. YD.), SLIP FORM PAVING MACHINE (INCLUDING GUNNERT, ZIMMERMAN AND SIMILAR TYPES), TOWER CRANE OR SIMILAR TYPE, UNIVERSAL EQUIPMENT OPERATOR (BACKHOE, CLAMSHELL, DRAGLINE, SHOVEL ETC., UP TO 10 CU. YD.); OPERATING ENGINEERS ELECTRICIAN INCLUDING TOWER ERECTOR, LINEMAN & CABLE SPLICER (LOAD SIDE OF MAIN DISCONNECT)
$31.39 $11.72 $43.11
POWER EQUIPMENT OPERATOR: GROUP 4 CRANE OPERATOR Heavy
ENGI0428-002 (PNEUMATIC OR CRAWLER-100 TONS HOISTING CAPACITY AND OVER, MRC RATING), SKIP LOADER (ALL TYPES WITH RATED CAPACITY OF 10 CU. YD. OR MORE), UNIVERSAL EQUIPMENT OPERATOR (BACKHOE, CLAMSHELL, DRAGLINE, SHOVEL, ETC., 10 CU. YD. AND OVER) MULTIPLE-UNIT EARTH EQUIPMENT (HOLLAND LOADER ETC.), TRACTOR OPERATOR, PNEUMATIC-TIRED OR TRACK TYPE, TWO UNITS-$0.50 PER HOUR OVER BASE RATE; AND $1.00 PER HOUR FOR EACH ADDITIONAL UNIT ALL OPERATORS, OILERS, AND MOTOR CRANE DRIVERS ON EQUIPMENT WITH BOOMS, EXCEPT CONCRETE PUMPING TRUCK BOOMS, INCLUDING JIBS, SHALL RECEIVE $0.01 PER HOUR PER FOOT OVER 80 FT IN ADDITION TO REGULAR RATE OF PAY PREMIUM PAY FOR PERFORMING HAZARDOUS WASTE REMOVAL $0.50 PER HOUR OVER BASE RATE
$32.42 $11.72 $44.14
POWER EQUIPMENT OPERATOR: HORIZONTAL DIRECTIONAL DRILL Highway
LABO1184-016
$31.98 $9.26 $41.24
POWER EQUIPMENT OPERATOR: HORIZONTAL DIRECTIONAL DRILL Heavy
LABO1184-016
$31.98 $9.26 $41.24
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER Highway
SUAZ2023-020
$25.89 $3.94 $29.83
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER Heavy
ENGI0012-060 (RATED CAPACITY 6, LESS THAN 10 CUBIC YDS)
$36.64 $18.12 $54.76
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER Heavy
ENGI0012-060 (ALL TYPES RATED CAPACITY OVER 3, LESS THAN 6 CUBIC YDS)
$35.56 $18.12 $53.68
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER Heavy
ENGI0012-060 (ALL TYPES RATED CAPACITY 3 CUBIC YDS OR LESS)
$32.29 $18.12 $50.41
POWER EQUIPMENT OPERATOR: MECHANIC Highway
SUAZ2023-020
$31.86 $12.12 $43.98
POWER EQUIPMENT OPERATOR: MECHANIC Heavy
ENGI0012-043
$37.67 $18.12 $55.79
POWER EQUIPMENT OPERATOR: MILLING MACHINE Highway
SUAZ2023-020
$29.25 $7.45 $36.70
POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE Highway
SUAZ2023-020
$30.13 $5.81 $35.94
POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE Heavy
ENGI0012-061
$36.64 $18.12 $54.76
POWER EQUIPMENT OPERATOR: OILER Highway
SUAZ2023-020
$31.86 $12.12 $43.98
POWER EQUIPMENT OPERATOR: OILER Heavy
ENGI0012-035
$32.29 $18.12 $50.41
POWER EQUIPMENT OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT (ASPHALT, AGGREGATE, & CONCRETE) Highway
SUAZ2023-020
$31.47 0.00 $31.47
POWER EQUIPMENT OPERATOR: SCRAPER Highway
SUAZ2023-020
$26.29 $5.90 $32.19
POWER EQUIPMENT OPERATOR: SCRAPER Heavy
SUAZ2023-005
$32.30 0.00 $32.30
POWER EQUIPMENT OPERATOR: TRACTOR Highway
ENGI0012-053
$35.56 $18.12 $53.68
POWER EQUIPMENT OPERATOR: TRENCHER Highway
LABO1184-033
$30.88 $9.26 $40.14
POWER EQUIPMENT OPERATOR: TRENCHER Heavy
ENGI0012-054
$35.56 $18.12 $53.68
SHEET METAL WORKER Building
SHEE0359-001
$49.39 $19.86 $69.25
TILE SETTER Building
SUAZ2019-001
$21.50 0.00 $21.50
TRAFFIC CONTROL Highway
SUAZ2023-020
$19.24 $2.58 $21.82
TRAFFIC CONTROL Heavy
LABO1184-042
$27.41 $9.26 $36.67
TRUCK DRIVER GROUP 2: 2 OR 3 AXLE DUMP , WATER TRUCK UNDER 2500 GAL. FOOTNOTE: HEALTH & WELFARE AS OF SEPTEMBER 1, 2024 Heavy
TEAM0104-002
$26.95 $1.65 $28.60
TRUCK DRIVER GROUP 3- 4 AXLE DUMP, WATER TRUCK DRIVE- Heavy
TEAM0104-002 (2500 GAL BUT LESS THAN 4000 GAL) FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024
$27.43 $1.65 $29.08
TRUCK DRIVER GROUP 4- 5 AXLE DUMP, WATER TRUCK 4000 GAL AND OVER FOOTNOTE: HEALTH & WELFARE AS OF SEPTEMBER 1, 2024 Heavy
TEAM0104-002
$28.68 $1.65 $30.33
TRUCK DRIVER GROUP 5- 6-AXLE DUMP FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 Heavy
TEAM0104-002
$27.80 $1.65 $29.45
TRUCK DRIVER GROUP 6- 7-AXLE DUMP, 8-AXLE DUMP ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 Heavy
TEAM0104-002
$29.47 $1.65 $31.12
TRUCK DRIVER: CONCRETE Highway
LABO1184-047
$30.88 $9.26 $40.14
TRUCK DRIVER: CONCRETE Heavy
LABO1184-034
$30.88 $9.26 $40.14
TRUCK DRIVER: DUMP Highway
SUAZ2023-020
$24.50 $2.72 $27.22
TRUCK DRIVER: DUMP Heavy
LABO1184-035
$30.88 $9.26 $40.14
TRUCK DRIVER: HYDROVAC Heavy
ENGI0012-055
$35.56 $18.12 $53.68
TRUCK DRIVER: OIL DISTRIBUTOR Highway
SUAZ2023-020
$29.97 $9.43 $39.40
TRUCK DRIVER: SWEEPER Highway
SUAZ2023-020
$20.24 $5.48 $25.72
TRUCK DRIVER: WATER Highway
SUAZ2023-020
$26.13 $7.09 $33.22
TRUCK DRIVER: WATER Heavy
LABO1184-036
$30.88 $9.26 $40.14

Wage Determinations

Residential

6 trades

Applies to

Apache, Cochise, Gila, Graham, Greenlee, La Paz, Navajo, Santa Cruz

Heavy

29 trades

Applies to

Apache, Cochise, Coconino, Gila, Graham, Greenlee, La Paz, Navajo, Santa Cruz, Yavapai