CT20260003
rev 2Highway
37 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Hartford County, Connecticut are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| BRICK POINTER/CAULKER/CLEANER Building BRCT0001-002 | $45.56 | $36.94 | $82.50 | |
| BRICKLAYER Building BRCT0001-001 | $45.56 | $36.94 | $82.50 | |
| BRICKLAYERS, CEMENT MASONS, CEMENT FINISHERS, PLASTERERS, STONE MASONS Highway BRCT0001-003 | $46.09 | $36.29 | $82.38 | |
| CARPENTER Building CARP0326-028 (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $42.03 | $29.19 | $71.22 | |
| CARPENTER (SCAFFOLD BUILDER) Building CARP0326-027 | $42.03 | $29.19 | $71.22 | |
| CARPENTER, INCLUDING DRYWALL HANGING Residential SUCT2002-003 | $15.50 | 0.00 | $15.50 | |
| CARPENTER, PILEDRIVER Heavy CARP0326-015 (AVON, BLOOMFIELD, EAST BRANBY, EAST HARTFOD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) | $42.03 | $29.19 | $71.22 | |
| CARPENTER: DIVER Heavy CARP0326-010 (BERLIN, BRISTOL, BURLINGTON, CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE AND SOUTHINGTON) | $50.49 | $29.19 | $79.68 | |
| CARPENTER: DIVER Heavy CARP0326-015 (AVON, BLOOMFIELD, EAST BRANBY, EAST HARTFOD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) | $50.49 | $29.19 | $79.68 | |
| CARPENTER: DIVER TENDER Heavy CARP0326-010 (BERLIN, BRISTOL, BURLINGTON, CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE AND SOUTHINGTON) | $42.03 | $29.19 | $71.22 | |
| CARPENTER: DIVER TENDER Heavy CARP0326-015 (AVON, BLOOMFIELD, EAST BRANBY, EAST HARTFOD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) | $42.03 | $29.19 | $71.22 | |
| CARPENTERS, PILEDRIVERS Highway CARP0326-002 (BERLIN, BRISTOL, BURLINGTON,CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON) | $42.03 | $29.19 | $71.22 | |
| CARPENTERS, PILEDRIVERS Highway CARP0326-013 (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) | $42.03 | $29.19 | $71.22 | |
| CARPENTERS, PILEDRIVERS Heavy CARP0326-010 (BERLIN, BRISTOL, BURLINGTON, CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE AND SOUTHINGTON) | $42.03 | $29.19 | $71.22 | |
| CARPENTERS: DIVER TENDERS Highway CARP0326-002 (BERLIN, BRISTOL, BURLINGTON,CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON) | $42.03 | $29.19 | $71.22 | |
| CARPENTERS: DIVER TENDERS Highway CARP0326-013 (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) | $42.03 | $29.19 | $71.22 | |
| CARPENTERS: DIVERS Highway CARP0326-002 (BERLIN, BRISTOL, BURLINGTON,CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON) | $50.49 | $29.19 | $79.68 | |
| CARPENTERS: DIVERS Highway CARP0326-013 (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) | $50.49 | $29.19 | $79.68 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUCT2002-003 | $21.22 | 0.00 | $21.22 | |
| CEMENT MASON/CONCRETE FINISHER Heavy BRCT0001-012 | $46.09 | $36.29 | $82.38 | |
| CEMENT MASON/CONCRETE FINISHER Building BRCT0001-005 | $45.56 | $36.94 | $82.50 | |
| DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $48.48 | $15.34 | $63.82 | |
| DREDGING: CLASS A2: CRANE OPERATOR Heavy ENGI0025-001 (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $43.20 | $14.99 | $58.19 | |
| DREDGING: CLASS B1: DERRICK OPERATOR Heavy ENGI0025-001 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $41.93 | $14.90 | $56.83 | |
| DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $39.46 | $14.73 | $54.19 | |
| DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $38.38 | $14.66 | $53.04 | |
| DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $37.15 | $14.57 | $51.72 | |
| DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $30.86 | $14.15 | $45.01 | |
| DRYWALL FINISHER/TAPER Residential SUCT2002-003 | $16.25 | $2.70 | $18.95 | |
| DRYWALL FINISHER/TAPER Building PAIN0011-023 | $40.32 | $26.75 | $67.07 | |
| ELECTRICIAN Residential SUCT2002-003 | $19.99 | $2.00 | $21.99 | |
| ELECTRICIAN Heavy ELEC0035-006 (ENTIRE COUNTY EXCLUDING BERLIN, BRISTOL, HARTLAND, NEW BRITAIN, NEWINGTON, PLAINVILLE AND SOUTHINGTON TOWNSHIPS) | $48.25 | $36.67 | $84.92 | |
| ELECTRICIAN Heavy ELEC0090-005 (BERLIN, BRISTOL, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON TOWNSHIPS) | $46.48 | $38.05 | $84.53 | |
| ELECTRICIAN (HARTLAND TOWNSHIP) Heavy ELEC0488-005 | $47.40 | $36.74 | $84.14 | |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) Building ELEC0035-014 | $48.25 | $36.67 | $84.92 | |
| ELECTRICIANS: Highway ELEC0035-002 (ENTIRE COUNTY, EXCLUDING BERLIN, BRISTOL, HARTLAND, NEW BRITAIN, NEWINGTON, PLAINVILLE AND SOUTHINGTON) | $48.25 | $36.67 | $84.92 | |
| ELECTRICIANS: Highway ELEC0090-001 (BERLIN, BRISTOL, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON) | $46.48 | $38.05 | $84.53 | |
| ELECTRICIANS: Highway ELEC0488-004 Scope differs by code/WD | $47.40 | $36.74 | $84.14 | |
| FLOOR LAYER: CARPET ONLY Building CARP0326-024 | $42.03 | $29.19 | $71.22 | |
| FLOOR LAYER: HARDWOOD FLOORS ONLY Building CARP0326-025 | $42.03 | $29.19 | $71.22 | |
| GLAZIER Building PAIN0011-014 | $43.13 | $26.75 | $69.88 | |
| HEAT & FROST INSULATOR Building ASBE0033-002 (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $48.81 | $33.65 | $82.46 | |
| IRONWORKER, REINFORCING Heavy SUCT2002-009 | $27.13 | $13.57 | $40.70 | |
| IRONWORKER: REINFORCING, STRUCTURAL, ORNAMENTAL Building IRON0015-010 | $45.25 | $43.62 | $88.87 | |
| IRONWORKER: STRUCTURAL A. PAID HOLIDAY: LABOR DAY PROVIDED EMPLOYEE HAS BEEN ON THE PAYROLL FOR THE 5 CONSECUTIVE WORK DAYS PRIOR TO LABOR DAY Heavy IRON0015-007 | $45.25 | $43.62 | $88.87 | |
| LABORER: COMMON OR GENERAL Heavy SUCT2002-009 | $21.03 | $5.30 | $26.33 | |
| LABORER: COMMON OR GENERAL Building LABO0230-001 | $35.70 | $28.85 | $64.55 | |
| LABORER: MASON TENDER-CEMENT/CONCRETE Building LABO0230-001 | $35.70 | $28.85 | $64.55 | |
| LABORERS GROUP 1 LABORERS Heavy LABO0146-004 (UNSKILLED),CONCRETE SPECIALIST | $35.70 | $28.85 | $64.55 | |
| LABORERS GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN Heavy LABO0146-004 | $35.95 | $28.85 | $64.80 | |
| LABORERS GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER Heavy LABO0146-004 (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER | $36.20 | $28.85 | $65.05 | |
| LABORERS GROUP 4 ASBESTOS/LEAD REMOVAL Heavy LABO0146-004 | $38.70 | $28.85 | $67.55 | |
| LABORERS GROUP 5 BLASTERS Heavy LABO0146-004 | $37.45 | $28.85 | $66.30 | |
| LABORERS GROUP 6 TOXIC WASTE REMOVER Heavy LABO0146-004 | $37.70 | $28.85 | $66.55 | |
| LABORERS GROUP 7 TRAFFIC CONTROL SIGNALMAN Heavy LABO0146-004 | $21.42 | $28.85 | $50.27 | |
| LABORERS GROUP 8 ACETYLENE BURNER Heavy LABO0146-004 (HOURS WORKED WITH A TORCH) | $36.70 | $28.85 | $65.55 | |
| LABORERS GROUP 9 TOXIC WASTE REMOVERS A OR B WITH PPE Heavy LABO0146-004 (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT WORN.) | $38.70 | $28.85 | $67.55 | |
| LABORERS: COMMON OR GENERAL Residential SUCT2002-003 | $13.09 | $1.63 | $14.72 | |
| LABORERS: GROUP 1 LABORERS Highway LABO0146-001 (UNSKILLED), CONCRETE SPECIALIST | $35.70 | $28.85 | $64.55 | |
| LABORERS: GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN Highway LABO0146-001 | $35.95 | $28.85 | $64.80 | |
| LABORERS: GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER Highway LABO0146-001 (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER | $36.20 | $28.85 | $65.05 | |
| LABORERS: GROUP 4 ASBESTOS/LEAD REMOVAL Highway LABO0146-001 | $38.70 | $28.85 | $67.55 | |
| LABORERS: GROUP 5 BLASTERS Highway LABO0146-001 | $37.45 | $28.85 | $66.30 | |
| LABORERS: GROUP 6 TOXIC WASTE REMOVER Highway LABO0146-001 | $37.70 | $28.85 | $66.55 | |
| LABORERS: GROUP 7 TRAFFIC CONTROL SIGNALMAN Highway LABO0146-001 | $21.42 | $28.85 | $50.27 | |
| LABORERS: GROUP 8: ACETYLENE BURNER Highway LABO0146-001 (HOURS WORKED WITH A TORCH) | $36.70 | $28.85 | $65.55 | |
| LABORERS: GROUP 9: TOXIC WASTE REMOVERS A OR B WITH PPE Highway LABO0146-001 (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT WORN.) | $38.70 | $28.85 | $67.55 | |
| LABORERS: LANDSCAPE Residential SUCT2002-003 | $14.96 | $4.63 | $19.59 | |
| MILLWRIGHT Highway CARP1121-006 | $45.14 | $30.24 | $75.38 | |
| MILLWRIGHT Heavy CARP1121-006 | $45.14 | $30.24 | $75.38 | |
| OPERATOR: EXCAVATOR Heavy SUCT2002-009 | $27.77 | $7.60 | $35.37 | |
| PAINTER (BRUSH AND ROLLER) Heavy PAIN0011-013 | $36.42 | $22.90 | $59.32 | |
| PAINTER (SPRAY ONLY) Heavy PAIN0011-013 | $39.42 | $22.90 | $62.32 | |
| PAINTER (STEEL ONLY) Heavy PAIN0011-013 | $38.42 | $22.90 | $61.32 | |
| PAINTER: BRUSH AND ROLLER Building PAIN0011-021 | $39.57 | $26.75 | $66.32 | |
| PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING Residential SUCT2002-003 | $15.33 | $1.56 | $16.89 | |
| PAINTERS: BLAST AND SPRAY Highway PAIN0011-004 | $42.57 | $26.75 | $69.32 | |
| PAINTERS: BRUSH AND ROLL Highway PAIN0011-004 | $39.57 | $26.75 | $66.32 | |
| PAINTERS: BRUSH, ROLLER, BLASTING Highway PAIN0011-003 (SAND, WATER, ETC.) SPRAY (BRIDGE CONSTRUCTION) | $59.70 | $26.90 | $86.60 | |
| PAINTERS: TANKS, TOWERS, SWING Highway PAIN0011-004 | $41.57 | $26.75 | $68.32 | |
| PIPEFITTER Building PLUM0777-003 | $50.58 | $35.85 | $86.43 | |
| PLUMBER Building PLUM0777-001 | $50.58 | $35.85 | $86.43 | |
| PLUMBER: HVAC PIPE INSTALLATION Building PLUM0777-004 | $50.58 | $35.85 | $86.43 | |
| PLUMBER/PIPEFITTER Residential SUCT2002-003 (INCLUDING HVAC PIPE INSTALLATION) | $16.67 | $2.63 | $19.30 | |
| POWER EQUIPMENT OPERATOR, BULLDOZER: FINEGRADE Building ENGI0478-005 (SLOPES, SHAPING, LASER OR GPS, ETC.) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 | |
| POWER EQUIPMENT OPERATOR: BULLDOZER Residential ENGI0478-006 (ROUGH GRADE DOZER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 | |
| POWER EQUIPMENT OPERATOR: BULLDOZER Heavy ENGI0478-010 (ROUGH GRADE DOZER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 | |
| POWER EQUIPMENT OPERATOR: BULLDOZER FINE GRADE Heavy ENGI0478-010 (INCLUDES SLOPES, SHAPING, LASER OR GPS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 | |
| POWER EQUIPMENT OPERATOR: CRANES Heavy ENGI0478-010 (UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY. B. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA . CRANE WITH BOOM, INCLUDING JIB, 200 FEET- $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA | $56.79 | $29.80 | $86.59 | |
| POWER EQUIPMENT OPERATOR: CRANES Heavy ENGI0478-010 (100 TON CAPACITY & OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY. B. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA . CRANE WITH BOOM, INCLUDING JIB, 200 FEET- $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA | $57.78 | $29.80 | $87.58 | |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER Heavy ENGI0478-010 (UNDER 3 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 | |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER Heavy ENGI0478-010 (7 CUBIC YARDS OR OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 | |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER Heavy ENGI0478-010 (3 CUBIC YARDS UP TO 7 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 | |
| POWER EQUIPMENT OPERATOR: LOADER Residential ENGI0478-006 (UNDER 3 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 | |
| POWER EQUIPMENT OPERATOR: LOADER Residential ENGI0478-006 (7 CUBIC YARDS OR OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 | |
| POWER EQUIPMENT OPERATOR: LOADER Residential ENGI0478-006 (3 CUBIC YARDS UP TO 7 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 | |
| POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER Heavy ENGI0478-001 (2 DRUMS OR OVER) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $58.19 | $29.80 | $87.99 | |
| POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR TONE; HOISTING ENGINEER Highway ENGI0478-002 (2 DRUMS OR OVER). HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB): JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): $7.00 EXTRA. CRANE WITH 400 FT. BOOM (INCLUDING JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $58.19 | $29.80 | $87.99 | |
| POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR, EARTH ROLLER, POWER PAVEMENT BREAKER Heavy ENGI0478-001 (WHIPHAMMER), ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $45.96 | $29.80 | $75.76 | |
| POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR; EARTH ROLLER; POWER PAVEMENT BREAKER Highway ENGI0478-002 (WHIPHAMMER); ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $45.96 | $29.80 | $75.76 | |
| POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT, VACUUM TRUCK, ZIM MIXER, SWEEPER; Heavy ENGI0478-001 (MINIMUM FOR ANY JOB REQUIRING A CDL LICENSE) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $44.70 | $29.80 | $74.50 | |
| POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT; VACUUM TRUCK; ZIM MIXER; SWEEPER; Highway ENGI0478-002 (MINIMUM FOR ANY JOB REQUIRING A CDL LICENSE) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $44.70 | $29.80 | $74.50 | |
| POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR, TOW MOTOR OPERATOR Heavy ENGI0478-001 (SOLID TIRE NO ROUGH TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $43.60 | $29.80 | $73.40 | |
| POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR; TOW MOTOR OPERATOR Highway ENGI0478-002 (SOLID TIRE NO ROUGH TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $43.60 | $29.80 | $73.40 | |
| POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER Highway ENGI0478-002 (7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 | |
| POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER Heavy ENGI0478-001 (7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 | |
| POWER EQUIPMENT OPERATORS: GROUP 2 CRANES Highway ENGI0478-002 (100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON. HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB): $2.50 EXTRA. CRANE WITH 250 FT. BOOM (INCLUDING JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): $7.00 EXTRA. CRANE WITH 400 FT. BOOM (INCLUDING JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $57.78 | $29.80 | $87.58 | |
| POWER EQUIPMENT OPERATORS: GROUP 2 CRANES Heavy ENGI0478-001 (100 TON CAPACITY & OVER) BAUER DRILL/CAISSON HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $57.78 | $29.80 | $87.58 | |
| POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER Highway ENGI0478-002 ($3.00 PREMIUM WHEN OPERATOR CONTROLS HAMMER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $52.92 | $29.80 | $82.72 | |
| POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER Heavy ENGI0478-001 ($3.00 PREMIUM WHEN OPERATOR CONTROLS HAMMER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $52.92 | $29.80 | $82.72 | |
| POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER Highway ENGI0478-002 (ALL TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT 1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE (SLOPES SHAPING, LASER OR GPS, ECT) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 | |
| POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER Heavy ENGI0478-001 (ALL TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT 1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE (SLOPES SHAPING, LASER OR GPS, ECT.) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 | |
| POWER EQUIPMENT OPERATORS: GROUP 3 CRANES Highway ENGI0478-002 (UNDER 100 TON RATED CAPACITY). HAZARDOUS WASTE PREMIUM 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB): $2.50 EXTRA. CRANE WITH 250 FT. BOOM (INCLUDING JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 | $86.59 | |
| POWER EQUIPMENT OPERATORS: GROUP 3 CRANES Heavy ENGI0478-001 (UNDER 100 TON RATED CAPACITY) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 | $86.59 | |
| POWER EQUIPMENT OPERATORS: GROUP 4 TRENCHING MACHINES, LIGHTER DERRICK, CONCRETE FINISHING MACHINE, CMI MACHINE OR SIMILAR, KOEHRING LOADER Heavy ENGI0478-001 (SKOOPER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 | |
| POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADER Highway ENGI0478-002 (3 CU. YDS. UP TO 7 CUBIC YARDS); BULLDOZER (ROUGH GRADE DOZER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 | |
| POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADER Heavy ENGI0478-001 (3 CU. YDS. UP TO 7 CU. YARDS), BULLDOZER (ROUGH GRADE DOZER) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 | |
| POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER, CONCRETE SAWS AND CUTTERS Heavy ENGI0478-001 (RIDE ON TYPES), VERMEER CONCRETE CUTTER, STUMP GRINDER, SCRAPER, SNOOPER, SKIDDER, MILLING MACHINE (24"" AND UNDER MANDREL). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $49.25 | $29.80 | $79.05 | |
| POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER; CONCRETE SAWS AND CUTTERS Highway ENGI0478-002 (RIDE ON TYPES); VERMEER CONCRETE CUTTER; STUMP GRINDER; SCRAPER; SNOOPER; SKIDDER; MILLING MACHINE (24"" AND UNDER MANDREL). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $49.25 | $29.80 | $79.05 | |
| POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER Highway ENGI0478-002 (UNDER 3 CUBIC YARDS); SKID STEER LOADER (REGARDLESS OF ATTACHMENTS); (BOBCAT OR SIMILAR); FORK LIFT; POWER CHIPPER; LANDSCAPE EQUIPMENT (INCLUDING HYDROSEEDER).VACUUM EXCAVATION TRUCK AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 | |
| POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER Heavy ENGI0478-001 (UNDER 3 CUBIC YARDS), SKID STEER LOADER (REGARDLESS OF ATTACHMENTS), BOBCAT OR SIMILAR, FORKLIFT, POWER CHIPPER, LANDSCAPE EQUIPMENT (INCLUDING HYDROSEEDER), VACUUM EXACAVATION TRUCK AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 | |
| ROOFER: COMPOSITION Residential ROOF0009-005 | $45.15 | $23.53 | $68.68 | |
| ROOFER: COMPOSITION Building ROOF0009-001 | $45.15 | $23.53 | $68.68 | |
| ROOFER: SLATE AND TILE Residential ROOF0009-005 | $45.65 | $23.53 | $69.18 | |
| ROOFER: SLATE AND TILE Building ROOF0009-001 | $45.65 | $23.53 | $69.18 | |
| SHEET METAL WORKER Residential SHEE0040-003 | $44.70 | $44.50 | $89.20 | |
| SHEET METAL WORKER Building SHEE0040-001 (INCLUDING HVAC UNIT INSTALLATION) | $44.70 | $44.50 | $89.20 | |
| SHEET METAL WORKER Building SHEE0040-002 (METAL FLASHING AND HVAC DUCT INSTALLATION ONLY) | $44.70 | $44.50 | $89.20 | |
| SHEET METAL WORKER (METAL ROOFS INSTALLATION) Building SHEE0040-008 | $44.70 | $44.50 | $89.20 | |
| SPRINKLER FITTER Building SFCT0669-002 | $53.76 | $33.44 | $87.20 | |
| TRUCK DRIVER: 3 AXLE & SEMI - TRUCK Heavy SUCT2002-009 | $19.93 | $7.39 | $27.32 | |
| TRUCK DRIVER: DUMP TRUCK Building TEAM0191-001 | $36.39 | $32.68 | $69.07 | |
| TRUCK DRIVERS: SPECIALIZED Highway TEAM0064-005 (EARTH MOVING EQUIPMENT OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED | $36.44 | $32.68 | $69.12 | |
| TRUCK DRIVERS: SPECIALIZED Heavy TEAM0064-001 (EARTH MOVING EQUIPMENT OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED | $36.44 | $32.68 | $69.12 |
No trade rates match your search and filter selection.
Highway
Heavy
Applies to
Fairfield, Hartford, Litchfield, Middlesex, New Haven, New London, Tolland, Windham
Residential
Heavy
Building