ID20260005
rev 1Residential
10 trades
Applies to
Bannock, Bear Lake, Caribou, Franklin, Oneida, Power
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Bannock County, Idaho are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| BRICKLAYER Residential SUID1979-001 | $10.25 | $1.00 | $11.25 | |
| BRICKLAYER Building BRIC0001-001 | $35.53 | $19.85 | $55.38 | |
| CARPENTER Residential SUID1979-001 | $7.25 | 0.00 | $7.25 | |
| CARPENTER Building CARP0808-003 | $35.68 | $18.24 | $53.92 | |
| CARPENTER Heavy SUID2021-010 | $24.00 | $2.62 | $26.62 | |
| CARPENTER (FORM WORK ONLY) Highway SUID2013-019 | $26.24 | $9.48 | $35.72 | |
| CARPENTER, EXCLUDES FORM WORK Highway SUID2013-019 | $23.92 | $9.84 | $33.76 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUID1979-001 | $9.53 | 0.00 | $9.53 | |
| CEMENT MASON/CONCRETE FINISHER Highway SUID2013-019 | $22.90 | $11.99 | $34.89 | |
| CEMENT MASON/CONCRETE FINISHER Building SUID2021-006 | $22.21 | $3.80 | $26.01 | |
| ELECTRICIAN Residential SUID1979-001 | $9.65 | 0.00 | $9.65 | |
| ELECTRICIAN Highway SUID2013-019 | $26.33 | $11.45 | $37.78 | |
| ELECTRICIAN Building ELEC0449-002 | $40.00 | $18.74 | $58.74 | |
| ELECTRICIAN Heavy ELEC0291-005 | $42.25 | $18.84 | $61.09 | |
| HIGHWAY/PARKING LOT STRIPING: PAINTER Highway SUID2013-019 | $25.47 | $9.52 | $34.99 | |
| IRONWORKER Building IRON0732-004 | $33.37 | $22.98 | $56.35 | |
| IRONWORKER Heavy IRON0014-007 | $43.40 | $30.27 | $73.67 | |
| LABORER Residential SUID1979-001 | $7.25 | 0.00 | $7.25 | |
| LABORER (COMMON OR GENERAL) Building LABO0155-013 | $33.63 | $16.50 | $50.13 | |
| LABORER (COMMON OR GENERAL) Heavy LABO0155-011 | $34.25 | $13.80 | $48.05 | |
| LABORER (MASON TENDER - CEMENT/CONCRETE) Building LABO0155-012 | $33.93 | $13.80 | $47.73 | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway SUID2013-019 | $19.38 | $7.63 | $27.01 | |
| LABORER: COMMON OR GENERAL Highway SUID2013-019 | $19.18 | $7.65 | $26.83 | |
| LABORER: GRADE CHECKER Highway SUID2013-019 | $20.64 | $7.37 | $28.01 | |
| LABORER: GRADE CHECKER Building LABO0155-012 | $33.98 | $13.80 | $47.78 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Highway SUID2013-019 | $22.34 | $10.90 | $33.24 | |
| LABORER: PIPELAYER ZONE DIFFERENTIAL Highway LABO0238-035 (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building SUID2021-006 | $28.92 | $10.39 | $39.31 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway SUID2013-019 | $21.15 | $8.20 | $29.35 | |
| OPERATOR: BROOM/SWEEPER Highway SUID2013-019 | $24.34 | $8.04 | $32.38 | |
| OPERATOR: CRANE Highway SUID2013-019 | $23.34 | $9.45 | $32.79 | |
| OPERATOR: FORKLIFT Highway SUID2013-019 | $23.13 | $9.17 | $32.30 | |
| OPERATOR: OILER Highway SUID2013-019 | $22.25 | $6.52 | $28.77 | |
| OPERATOR: PAVER Highway SUID2013-019 (ASPHALT, AGGREGATE, AND CONCRETE) | $24.37 | $7.11 | $31.48 | |
| OPERATOR: ROLLER (SUBGRADE) Highway SUID2013-019 | $19.99 | $7.99 | $27.98 | |
| OPERATOR: SCREED Highway SUID2013-019 | $22.30 | $7.22 | $29.52 | |
| PAINTER Residential SUID1979-001 | $8.81 | 0.00 | $8.81 | |
| PAINTER Building SUID2021-006 | $17.11 | $1.25 | $18.36 | |
| PLUMBER Residential SUID1979-001 | $9.86 | 0.00 | $9.86 | |
| POWER EQUIPMENT OPERATOR: Highway ENGI0370-043 (GROUP 6): BLADE OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR (3/4 YDS- 3 1/2 YDS, FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT OVER SCALE | $36.98 | $16.10 | $53.08 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Heavy ENGI0302-011 | $36.14 | $16.10 | $52.24 | |
| POWER EQUIPMENT OPERATOR: CRANE Heavy ENGI0302-006 | $36.98 | $20.50 | $57.48 | |
| POWER EQUIPMENT OPERATOR: FORKLIFT Building ENGI0302-012 | $36.33 | $15.40 | $51.73 | |
| POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER Highway ENGI0370-043 (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. | $36.64 | $16.10 | $52.74 | |
| POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR Highway ENGI0370-043 (UNDER 3/4 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.81 | $16.10 | $52.91 | |
| POWER EQUIPMENT OPERATOR: GROUP 7 GRADER Highway ENGI0370-043 (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | |
| POWER EQUIPMENT OPERATOR: LOADER Building ENGI0302-012 | $36.14 | $16.10 | $52.24 | |
| ROOFER Residential SUID1979-001 | $9.40 | $1.00 | $10.40 | |
| ROOFER Building ROOF0200-003 | $29.02 | $19.90 | $48.92 | |
| SHEET METAL WORKER Residential SUID1979-001 | $10.47 | $1.79 | $12.26 | |
| SHEET METAL WORKER Building SHEE0103-014 (EXCLUDES HVAC DUCT INSTALLATION) | $35.50 | $22.52 | $58.02 | |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Building SHEE0103-006 | $35.50 | $22.52 | $58.02 | |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER Highway SUID2013-019 | $17.69 | $4.66 | $22.35 | |
| TRUCK DRIVER Residential SUID1979-001 | $8.86 | 0.00 | $8.86 | |
| TRUCK DRIVER: DUMP TRUCK Highway SUID2013-019 | $21.59 | $10.93 | $32.52 | |
| TRUCK DRIVER: DUMP TRUCK Building SUID2021-006 | $25.06 | $8.81 | $33.87 | |
| TRUCK DRIVER: DUMP TRUCK Heavy TEAM0983-004 | $35.60 | $17.00 | $52.60 | |
| TRUCK DRIVER: LOWBOY TRUCK Highway SUID2013-019 | $26.61 | $13.21 | $39.82 | |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK Highway SUID2013-019 | $23.93 | $11.27 | $35.20 | |
| TRUCK DRIVER: WATER TRUCK Highway SUID2013-019 | $21.54 | $12.19 | $33.73 |
No trade rates match your search and filter selection.
Residential
Applies to
Bannock, Bear Lake, Caribou, Franklin, Oneida, Power
Highway
Building
Applies to
Bannock, Franklin
Heavy
Applies to
Bannock, Franklin