ID20260005
rev 0Residential
0 trades
Applies to
Bannock, Bear Lake, Caribou, Franklin, Oneida, Power in Idaho.
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Residential SUID1979-001 | $10.25 | $1.00 | $11.25 |
| BRICKLAYER Building BRID0003-003 | $26.79 | $17.34 | $44.13 |
| CARPENTER Residential SUID1979-001 | $7.25 | $0.00 | $7.25 |
| CARPENTER Building CARP0808-001 | $35.68 | $18.24 | $53.92 |
| CARPENTER (Form Work Only) Highway SUID2013-015 | $26.57 | $8.10 | $34.67 |
| CEMENT MASON/CONCRETE FINISHER Residential SUID1979-001 | $9.53 | $0.00 | $9.53 |
| CEMENT MASON/CONCRETE FINISHER Building SUID2010-014 | $14.76 | $2.80 | $17.56 |
| CEMENT MASON/CONCRETE FINISHER Highway PLAS0072-001 | $40.89 | $18.64 | $59.53 |
| ELECTRICIAN Residential SUID1979-001 | $9.65 | $0.00 | $9.65 |
| ELECTRICIAN Building ELEC0449-007 (Including Low Voltage Wiring) | $40.00 | $18.74 | $58.74 |
| ELECTRICIAN Highway SUID2013-015 | $25.00 | $10.93 | $35.93 |
| GROUP 5B Building TEAM0983-001 | $35.78 | $17.00 | $52.78 |
| GROUP 5C Building TEAM0983-001 | $36.01 | $17.00 | $53.01 |
| GROUP 5D Building TEAM0983-001 | $36.12 | $17.00 | $53.12 |
| GROUP 5E Building TEAM0983-001 | $36.75 | $17.00 | $53.75 |
| GROUP 5F Building TEAM0983-001 | $37.19 | $17.00 | $54.19 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway SUID2013-015 | $23.37 | $10.50 | $33.87 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Highway SUID2013-015 | $22.68 | $10.90 | $33.58 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Concrete Saw Highway SUID2013-015 (Hand Held/Walk Behind) | $23.98 | $11.05 | $35.03 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Grade Checker Highway SUID2013-015 | $23.52 | $11.05 | $34.57 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Mason Tender - Cement/Concrete Highway SUID2013-015 | $23.42 | $10.90 | $34.32 |
| HIGHWAY/PARKING LOT STRIPING: Painter Highway SUID2013-015 | $24.80 | $6.91 | $31.71 |
| INSULATOR - MECHANICAL Building SUID2010-014 (Duct, Pipe & Mechanical System Insulation) | $20.13 | $1.80 | $21.93 |
| IRONWORKER, STRUCTURAL Building IRON0732-002 | $33.37 | $22.98 | $56.35 |
| LABORER Residential SUID1979-001 | $7.25 | $0.00 | $7.25 |
| LABORER Building LABO0155-005 (Common or General) Group 1 | $32.62 | $16.50 | $49.12 |
| LABORER: Mason Tender - Cement/Concrete Group 4 Building LABO0155-005 | $33.93 | $16.50 | $50.43 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUID2013-015 | $25.74 | $10.07 | $35.81 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUID2013-015 | $25.35 | $11.55 | $36.90 |
| OPERATOR: OPERATOR: Broom/Sweeper Highway SUID2013-015 | $24.95 | $10.18 | $35.13 |
| OPERATOR: OPERATOR: Bulldozer Highway SUID2013-015 | $26.19 | $9.60 | $35.79 |
| OPERATOR: OPERATOR: Crane Highway SUID2013-015 | $26.22 | $10.00 | $36.22 |
| OPERATOR: OPERATOR: Crusher Highway SUID2013-015 | $25.06 | $9.23 | $34.29 |
| OPERATOR: OPERATOR: Grader/Blade Highway SUID2013-015 | $25.96 | $10.00 | $35.96 |
| OPERATOR: OPERATOR: Hydroseeder Highway SUID2013-015 | $24.76 | $11.51 | $36.27 |
| OPERATOR: OPERATOR: Loader Highway SUID2013-015 | $26.22 | $9.98 | $36.20 |
| OPERATOR: OPERATOR: Mechanic Highway SUID2013-015 | $26.91 | $10.22 | $37.13 |
| OPERATOR: OPERATOR: Oiler Highway SUID2013-015 | $25.66 | $9.23 | $34.89 |
| OPERATOR: OPERATOR: Paver Highway SUID2013-015 (Asphalt, Aggregate, and Concrete) | $26.13 | $10.40 | $36.53 |
| OPERATOR: OPERATOR: Roller Highway SUID2013-015 | $25.54 | $10.62 | $36.16 |
| OPERATOR: OPERATOR: Roller (Subgrade) Highway SUID2013-015 | $22.24 | $8.57 | $30.81 |
| OPERATOR: OPERATOR: Rotomill Highway SUID2013-015 | $25.84 | $10.63 | $36.47 |
| OPERATOR: OPERATOR: Screed Highway SUID2013-015 | $25.42 | $9.93 | $35.35 |
| OPERATOR: TRAFFIC CONTROL: Flagger Highway SUID2013-015 | $22.68 | $10.90 | $33.58 |
| PAINTER Residential SUID1979-001 | $8.81 | $0.00 | $8.81 |
| PAINTER: Brush, Roller and Spray Building SUID2010-014 | $16.12 | 0.00 | $16.12 |
| PLUMBER Residential SUID1979-001 | $9.86 | $0.00 | $9.86 |
| PLUMBER Building PLUM0648-004 | $36.75 | $18.93 | $55.68 |
| POWER EQUIPMENT OPERATOR - GROUP 3: Forklift Building ENGI0302-033 | $36.33 | $16.10 | $52.43 |
| POWER EQUIPMENT OPERATOR - GROUP 5: Backhoe Building ENGI0302-033 (up to 3/4 yd), Industrial Oiler | $36.81 | $16.10 | $52.91 |
| POWER EQUIPMENT OPERATOR - GROUP 6: Backhoe Building ENGI0302-033 (3/4 yd to 3 1/2 yd), Crane (up to and including 50 ton) | $36.98 | $16.10 | $53.08 |
| POWER EQUIPMENT OPERATOR - GROUP 7: Excavator, Crane Building ENGI0302-033 (over 50 tons), Tower Crane, Heavy Duty Mechanic | $37.35 | $16.10 | $53.45 |
| ROOFER Residential SUID1979-001 | $9.40 | $1.00 | $10.40 |
| ROOFER Building ROOF0200-002 | $29.02 | $19.90 | $48.92 |
| Sheet metal worker Residential SUID1979-001 | $10.47 | $1.79 | $12.26 |
| SHEET METAL WORKER, Includes HVAC Duct Installation Building SHEE0103-003 | $35.50 | $22.25 | $57.75 |
| SPRINKLER FITTER Building SUID2010-014 (Fire Sprinklers) | $26.80 | $12.00 | $38.80 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway SUID2013-015 | $22.66 | $10.90 | $33.56 |
| TRAFFIC CONTROL: TRUCK DRIVER: Distributor Truck Highway SUID2013-015 | $21.66 | $13.04 | $34.70 |
| TRAFFIC CONTROL: TRUCK DRIVER: Dump Truck Highway SUID2013-015 | $21.86 | $13.18 | $35.04 |
| TRAFFIC CONTROL: TRUCK DRIVER: Lowboy Truck Highway SUID2013-015 | $21.53 | $12.96 | $34.49 |
| TRAFFIC CONTROL: TRUCK DRIVER: Oil Distributor Truck Highway SUID2013-015 | $22.54 | $12.35 | $34.89 |
| TRAFFIC CONTROL: TRUCK DRIVER: Water Truck Highway SUID2013-015 | $21.35 | $13.33 | $34.68 |
| TRUCK DRIVER Residential SUID1979-001 | $8.86 | $0.00 | $8.86 |
| TRUCK DRIVER GROUP 5A Building TEAM0983-001 | $35.60 | $17.00 | $52.60 |
No trade rates match your search and filter selection.
Residential
Applies to
Bannock, Bear Lake, Caribou, Franklin, Oneida, Power in Idaho.
Building
Applies to
Bear Lake, Bingham, Fremont, Lemhi, Oneida, Teton in Idaho.
Highway
Applies to
Bear Lake, Caribou, Clark, Fremont, Lemhi, Madison, Oneida, Teton in Idaho.