Power

4 wage determinations 77 trade rates

Popular Trades In Power

Track Power County updates

Get an email when wage determinations covering Power County, Idaho are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
BRICKLAYER Residential
SUID1979-001
$10.25 $1.00 $11.25
BRICKLAYER Building
BRID0003-003
$26.79 $17.34 $44.13
CARPENTER Residential
SUID1979-001
$7.25 0.00 $7.25
CARPENTER Building
SUID2010-027
$18.00 0.00 $18.00
CARPENTER (FORM WORK ONLY) Heavy
SUID2010-065
$23.92 $9.03 $32.95
CARPENTER (FORM WORK ONLY) Highway
SUID2013-026
$26.24 $9.48 $35.72
CARPENTER, EXCLUDES FORM WORK Heavy
SUID2010-065
$26.06 $11.26 $37.32
CARPENTER, EXCLUDES FORM WORK Highway
SUID2013-026
$23.92 $9.84 $33.76
CEMENT MASON/CONCRETE FINISHER Residential
SUID1979-001
$9.53 0.00 $9.53
CEMENT MASON/CONCRETE FINISHER Building
SUID2010-027
$13.52 $2.80 $16.32
CEMENT MASON/CONCRETE FINISHER Heavy
SUID2010-065
$22.43 $15.06 $37.49
CEMENT MASON/CONCRETE FINISHER Highway
SUID2013-026
$22.90 $11.99 $34.89
ELECTRICIAN Residential
SUID1979-001
$9.65 0.00 $9.65
ELECTRICIAN Heavy
ELEC0449-004
$40.00 $18.74 $58.74
ELECTRICIAN Highway
SUID2013-026
$26.33 $11.45 $37.78
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) Building
ELEC0449-007
$40.00 $18.74 $58.74
HIGHWAY/PARKING LOT STRIPING: PAINTER Highway
SUID2013-026
$25.47 $9.52 $34.99
IRONWORKER, REINFORCING Building
SUID2010-027
$24.74 $14.82 $39.56
IRONWORKER, STRUCTURAL Building
IRON0732-002
$33.37 $22.98 $56.35
LABORER Residential
SUID1979-001
$7.25 0.00 $7.25
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway
SUID2013-026
$19.38 $7.65 $27.03
LABORER: COMMON OR GENERAL Building
SUID2010-027
$17.87 0.00 $17.87
LABORER: COMMON OR GENERAL Highway
SUID2013-026
$19.18 $7.65 $26.83
LABORER: GENERAL OR COMMON ZONE DIFFERENTIAL Heavy
LABO0238-033 (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE
$32.15 $16.30 $48.45
LABORER: GRADE CHECKER Heavy
SUID2010-065
$22.68 $10.90 $33.58
LABORER: GRADE CHECKER Highway
SUID2013-026
$20.64 $7.37 $28.01
LABORER: GROUP 4 MASON TENDER Building
LABO0155-006 (CEMENT/CONCRETE & BRICK )
$33.93 $16.50 $50.43
LABORER: MASON TENDER - CEMENT/CONCRETE Heavy
SUID2010-065
$22.15 $10.15 $32.30
LABORER: MASON TENDER - CEMENT/CONCRETE Highway
SUID2013-026
$22.34 $10.90 $33.24
LABORER: PIPELAYER ZONE DIFFERENTIAL Highway
LABO0238-035 (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE
$28.48 $13.00 $41.48
OPERATOR: BACKHOE/EXCAVATOR Building
SUID2010-027
$22.23 0.00 $22.23
OPERATOR: BOBCAT/SKID STEER/SKID LOADER Building
SUID2010-027
$16.28 0.00 $16.28
OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway
SUID2013-026
$21.15 $8.20 $29.35
OPERATOR: BROOM/SWEEPER Highway
SUID2013-026
$22.80 $7.47 $30.27
OPERATOR: BULLDOZER Building
SUID2010-027
$24.52 $7.87 $32.39
OPERATOR: CRANE Highway
SUID2013-026
$23.34 $9.45 $32.79
OPERATOR: FORKLIFT Highway
SUID2013-026
$23.13 $9.17 $32.30
OPERATOR: LOADER (FRONT END) Building
SUID2010-027
$21.27 $5.54 $26.81
OPERATOR: OILER Highway
SUID2013-026
$22.25 $6.52 $28.77
OPERATOR: PAVER Highway
SUID2013-026 (ASPHALT, AGGREGATE, AND CONCRETE)
$24.24 $7.12 $31.36
OPERATOR: ROLLER Highway
SUID2013-026
$24.26 $8.14 $32.40
OPERATOR: ROLLER (SUBGRADE) Highway
SUID2013-026
$19.99 $7.99 $27.98
OPERATOR: SCREED Highway
SUID2013-026
$22.30 $7.22 $29.52
PAINTER Residential
SUID1979-001
$8.81 0.00 $8.81
PAINTER: BRUSH, ROLLER, AND SPRAY Building
PAIN0764-001
$12.09 $5.33 $17.42
PLUMBER Residential
SUID1979-001
$9.86 0.00 $9.86
PLUMBER Building
PLUM0648-004
$36.75 $18.93 $55.68
POWER EQUIPMENT OPERATOR: Highway
ENGI0370-044 (GROUP 6): BLADE OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR (3/4 YDS- 3 1/2 YDS, FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT OVER SCALE
$36.98 $16.10 $53.08
POWER EQUIPMENT OPERATOR: BLADE OPERATOR, BACKHOE 3/4 YD-3 1/2 YD), FRONT END LOADER Heavy
ENGI0370-040 (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
$36.98 $16.10 $53.08
POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER Heavy
ENGI0370-040 (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
$38.06 $16.10 $54.16
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER Heavy
ENGI0370-040 (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
$36.64 $16.10 $52.74
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER Highway
ENGI0370-044 (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE.
$36.64 $16.10 $52.74
POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE Heavy
ENGI0370-040 (UNDER 3/4 YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
$36.81 $16.10 $52.91
POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR Highway
ENGI0370-044 (UNDER 3/4 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE
$36.81 $16.10 $52.91
POWER EQUIPMENT OPERATOR: GROUP 6 CRANE Building
ENGI0302-038 (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE
$36.98 $16.10 $53.08
POWER EQUIPMENT OPERATOR: GROUP 7 CRANE Building
ENGI0302-038 (OVER 50 TONS), TOWER CRANE ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE
$37.35 $16.10 $53.45
POWER EQUIPMENT OPERATOR: GROUP 7 GRADER Heavy
ENGI0370-040 (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
$37.35 $16.10 $53.45
POWER EQUIPMENT OPERATOR: GROUP 7 GRADER Highway
ENGI0370-044 (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE
$37.35 $16.10 $53.45
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER Heavy
ENGI0370-040 (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
$37.58 $16.10 $53.68
ROOFER Residential
SUID1979-001
$9.40 $1.00 $10.40
ROOFER Building
SUID2010-027
$19.00 0.00 $19.00
SHEET METAL WORKER Residential
SUID1979-001
$10.47 $1.79 $12.26
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION Building
SHEE0103-003
$35.50 $22.25 $57.75
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER Highway
SUID2013-026
$17.69 $4.66 $22.35
TRUCK DRIVER Residential
SUID1979-001
$8.86 0.00 $8.86
TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS) Heavy
TEAM0983-002
$35.60 $17.00 $52.60
TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS) Heavy
TEAM0983-002
$35.78 $17.00 $52.78
TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS) Heavy
TEAM0983-002
$36.01 $17.00 $53.01
TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS) Heavy
TEAM0983-002
$36.12 $17.00 $53.12
TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS) Heavy
TEAM0983-002
$36.75 $17.00 $53.75
TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS) Heavy
TEAM0983-002
$37.19 $17.00 $54.19
TRUCK DRIVER: DUMP TRUCK Building
SUID2010-027
$16.06 0.00 $16.06
TRUCK DRIVER: DUMP TRUCK Highway
SUID2013-026
$21.50 $10.91 $32.41
TRUCK DRIVER: LOWBOY TRUCK Highway
SUID2013-026
$26.61 $13.21 $39.82
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK Highway
SUID2013-026
$23.93 $11.27 $35.20
TRUCK DRIVER: WATER TRUCK Heavy
SUID2010-065
$21.00 $13.42 $34.42
TRUCK DRIVER: WATER TRUCK Highway
SUID2013-026
$21.54 $12.19 $33.73

Wage Determinations

Residential

10 trades

Applies to

Bannock, Bear Lake, Caribou, Franklin, Oneida, Power

Highway

28 trades

Applies to

Franklin, Power