| ASBESTOS WORKER/HEAT & FROST INSULATOR | 56.02 | 37.24 | 93.26 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUD… | 40.20 | 25.68 | 65.88 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUD… | 40.20 | 25.68 | 65.88 |
| TILE, MARBLE SETTER | 35.63 | 17.23 | 52.86 |
| TILE & MARBLE FINISHER | 24.33 | 13.16 | 37.49 |
| TERRAZZO WORKER/SETTER | 36.38 | 17.24 | 53.62 |
| TERRAZZO FINISHER | 23.38 | 13.15 | 36.53 |
| BRICKLAYER, STONE MASON, POINTER, CAULKING | 36.24 | 17.39 | 53.63 |
| TILE, MARBLE & TERRAZZO FINISHER | 31.55 | 19.08 | 50.63 |
| TILE SETTER & MARBLE MASON MECHANIC | 31.55 | 19.08 | 50.63 |
| TERRAZZO WORKER MECHANIC | 36.30 | 22.04 | 58.34 |
| TERRAZZO GRINDER FINISHER | 31.00 | 17.89 | 48.89 |
| BRICKLAYER: STONE MASON, MARBLE MASONS, POINTER, C… | 35.00 | 21.60 | 56.60 |
| TILE SETTER | 29.08 | 17.32 | 46.40 |
| TILE FINISHER | 29.08 | 17.32 | 46.40 |
| BRICKLAYER | 35.34 | 21.72 | 57.06 |
| TILE, MARBLE SETTER | 37.22 | 18.05 | 55.27 |
| TILE & MARBLE FINISHER | 25.33 | 14.19 | 39.52 |
| TERRAZZO WORKER/SETTER | 37.97 | 18.06 | 56.03 |
| TERRAZZO FINISHER | 25.33 | 14.19 | 39.52 |
| BRICKLAYER, STONEMASON | 35.21 | 18.19 | 53.40 |
| BRICKLAYER: BRICKLAYERS, STONEMASONS AND CEMENT MA… | 33.70 | 16.57 | 50.27 |
| BRICKLAYER: TILE LAYER, MARBLE MASON, MOSAIC WORKE… | 38.16 | 18.22 | 56.38 |
| BRICKLAYER: TERRAZZO WORKER | 37.97 | 18.06 | 56.03 |
| BRICKLAYER: TERRAZO FINISHER | 25.33 | 14.19 | 39.52 |
| BRICKLAYER: CEMENT MASON | 37.16 | 18.22 | 55.38 |
| BRICKLAYER: BRICKLAYERS, STONE MASONS AND POINTER/… | 38.16 | 18.22 | 56.38 |
| TILE & MARBLE SETTER; MOSAIC WORKER | 35.83 | 20.89 | 56.72 |
| TILE & MARBLE FINISHER | 25.33 | 14.19 | 39.52 |
| TERRAZZO WORKER/SETTER | 37.97 | 18.06 | 56.03 |
| TERRAZZO FINISHER | 25.33 | 14.19 | 39.52 |
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLE… | 35.83 | 20.89 | 56.72 |
| TILE, MARBLE & TERRAZZO WORKER | 42.05 | 28.22 | 70.27 |
| BRICKLAYER: INCLUDING STONEMASON, AND POINTER, CAU… | 42.05 | 28.22 | 70.27 |
| TILE & MARBLE SETTER; MOSAIC WORKER | 35.63 | 17.23 | 52.86 |
| TILE & MARBLE FINISHER | 24.33 | 13.16 | 37.49 |
| TERRAZZO WORKER/SETTER | 36.38 | 17.24 | 53.62 |
| TERRAZZO FINISHER | 23.38 | 13.15 | 36.53 |
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLE… | 33.75 | 20.12 | 53.87 |
| BRICKLAYER, CAULKER, CLEANER, POINTER | 34.00 | 19.71 | 53.71 |
| CARPENTER | 31.09 | 28.53 | 59.62 |
| CARPENTER | 34.69 | 25.59 | 60.28 |
| CARPENTER | 35.80 | 25.59 | 61.39 |
| CARPENTER | 30.52 | 29.11 | 59.63 |
| CARPENTER | 35.14 | 25.10 | 60.24 |
| CARPENTER | 30.59 | 29.03 | 59.62 |
| CARPENTER | 30.94 | 29.08 | 60.02 |
| CARPENTER | 33.74 | 25.84 | 59.58 |
| CARPENTER | 34.25 | 25.59 | 59.84 |
| CARPENTER | 34.06 | 25.67 | 59.73 |
| CARPENTER (JASPER, NEWTON, AND STARKE COUNTIES) | 45.91 | 35.90 | 81.81 |
| CARPENTER | 34.55 | 25.59 | 60.14 |
| MILLWRIGHT | 26.81 | 19.28 | 46.09 |
| MILLWRIGHT | 47.92 | 37.23 | 85.15 |
| MILLWRIGHT | 39.10 | 26.94 | 66.04 |
| MILLWRIGHT: ZONE 2: GIBSON, GREENE AND SULLIVAN CO… | 35.00 | 29.33 | 64.33 |
| MILLWRIGHT: ZONE 1: POSEY, VANDERBURGH AND WARRICK… | 36.30 | 28.37 | 64.67 |
| ELECTRICIAN | 41.04 | 18.94 | 59.98 |
| ELECTRICIAN | 33.98 | 18.04 | 52.02 |
| LINE CONSTRUCTION:: LINEMAN & CABLE SPLICERS | 44.52 | 18.43 | 62.95 |
| LINE CONSTRUCTION: GROUNDMAN | 25.90 | 13.97 | 39.87 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | 39.11 | 17.13 | 56.24 |
| COMMUNICATION TECHNICIAN | 26.50 | 18.33 | 44.83 |
| ELECTRICIAN | 46.00 | 29.23 | 75.23 |
| COMMUNICATION TECHNICIAN | 26.50 | 18.33 | 44.83 |
| ELECTRICIAN | 46.00 | 29.23 | 75.23 |
| ELECTRICIAN | 27.20 | 14.54 | 41.74 |
| ELECTRICIAN | 38.05 | 22.32 | 60.37 |
| ELECTRICIAN | 40.18 | 23.18 | 63.36 |
| ELECTRICIAN | 36.00 | 21.51 | 57.51 |
| ELECTRICIAN | 40.96 | 22.44 | 63.40 |
| ELECTRICIAN | 45.45 | 28.19 | 73.64 |
| ELECTRICIAN | 35.76 | 18.96 | 54.72 |
| ELECTRICIAN (JASPER, PULASKI, AND STARKE COUNTIES) | 49.00 | 32.89 | 81.89 |
| ELECTRICIAN | 27.64 | 13.23 | 40.87 |
| ELECTRICIAN | 41.00 | 27.36 | 68.36 |
| ELECTRICIAN | 40.64 | 20.46 | 61.10 |
| ELECTRICIAN | 33.02 | 16.10 | 49.12 |
| ELECTRICIAN | 42.00 | 24.15 | 66.15 |
| ELECTRICIAN | 41.50 | 31.23 | 72.73 |
| ELECTRICIAN (NEWTON COUNTY) | 48.10 | 31.28 | 79.38 |
| LINE CONSTRUCTION: LINEMAN | 60.15 | 26.90 | 87.05 |
| LINE CONSTRUCTION: HEAVY-EQUIPMENT OPERATOR: ALL C… | 49.30 | 23.64 | 72.94 |
| LINE CONSTRUCTION: GROUNDMAN-EQUIPMENT OPERATOR | 43.19 | 21.81 | 65.00 |
| LINE CONSTRUCTION: GROUNDMAN, CLASS A | 33.96 | 19.04 | 53.00 |
| COMMUNICATION TECHNICIAN | 30.00 | 18.07 | 48.07 |
| ELECTRICIAN | 43.30 | 25.32 | 68.62 |
| ELECTRICIAN | 39.20 | 17.95 | 57.15 |
| ELECTRICIAN | 40.18 | 22.15 | 62.33 |
| ELECTRICIAN | 30.08 | 17.23 | 47.31 |
| ELECTRICIAN | 42.02 | 23.07 | 65.09 |
| LINE CONSTRUCTION:: LINEMAN (REMAINING COUNTIES) | 50.28 | 22.38 | 72.66 |
| LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER | 31.49 | 16.93 | 48.42 |
| POWER EQUIPMENT OPERATORS: GROUP 3- ASSISTANT PLAN… | 41.96 | 23.35 | 65.31 |
| POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILR… | 35.95 | 36.65 | 72.60 |
| POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILR… | 24.30 | 30.85 | 55.15 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CO… | 35.95 | 45.93 | 81.88 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CO… | 41.40 | 45.93 | 87.33 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CO… | 48.70 | 45.93 | 94.63 |
| POWER EQUIPMENT OPERATORS:: GROUP B | 44.15 | 19.60 | 63.75 |
| POWER EQUIPMENT OPERATORS:: GROUP A | 46.80 | 19.60 | 66.40 |
| POWER EQUIPMENT OPERATORS:: GROUP B | 35.30 | 19.60 | 54.90 |
| POWER EQUIPMENT OPERATORS:: GROUP A | 43.43 | 19.60 | 63.03 |
| POWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTIL… | 38.80 | 27.15 | 65.95 |
| IRONWORKER | 38.00 | 26.39 | 64.39 |
| IRONWORKERS: STRUCTURAL, MACHINERY MOVERS, RIGGERS | 37.77 | 23.90 | 61.67 |
| IRONWORKERS: ORNAMENTAL | 37.77 | 23.90 | 61.67 |
| IRONWORKERS: FENCE ERECTORS | 35.88 | 23.90 | 59.78 |
| IRONWORKER | 36.17 | 25.80 | 61.97 |
| IRONWORKER: REINFORCING | 36.17 | 25.80 | 61.97 |
| IRONWORKER | 35.34 | 25.75 | 61.09 |
| IRONWORKER | 35.40 | 26.92 | 62.32 |
| IRONWORKERS: | 35.39 | 24.35 | 59.74 |
| IRONWORKER | 39.76 | 25.00 | 64.76 |
| IRONWORKER: SHEETER | 48.00 | 41.28 | 89.28 |
| IRONWORKER | 47.75 | 41.28 | 89.03 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 | 33.45 | 27.50 | 60.95 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTI… | 30.68 | 27.50 | 58.18 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTI… | 30.65 | 18.00 | 48.65 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTI… | 30.65 | 18.00 | 48.65 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTI… | 30.65 | 18.00 | 48.65 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTI… | 30.65 | 18.00 | 48.65 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTI… | 30.65 | 18.00 | 48.65 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTI… | 30.65 | 18.00 | 48.65 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTI… | 30.65 | 18.00 | 48.65 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTI… | 30.65 | 18.00 | 48.65 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTI… | 30.65 | 18.00 | 48.65 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK … | 31.65 | 18.00 | 49.65 |
| LABORERS: UTILITY CONSTRCTION: GROUP 1 CONSTRUCTIO… | 30.65 | 18.22 | 48.87 |
| PAINTER: SPRAY | 28.79 | 14.46 | 43.25 |
| PAINTER: SANDBLASTING, WATERBLASTING | 31.68 | 14.46 | 46.14 |
| PAINTER: BRUSH & ROLLER, PAPERHANGER, DRYWALL TAPI… | 30.34 | 14.46 | 44.80 |
| PAINTER: BRIDGES, LEAD ABATEMENT | 31.68 | 14.46 | 46.14 |
| GLAZIER (NEWTON COUNTY, WEST OF HIGHWAY #41) | 53.55 | 44.88 | 98.43 |
| PAINTER SPRAY AND SAND-BLASTING (NON-BRIDGE WORK) | 30.52 | 15.89 | 46.41 |
| PAINTER BRUSH, ROLLER (NON-BRIDGE WORK) | 31.02 | 16.89 | 47.91 |
| PAINTER: SPRAY AND SANDBLASTING | 32.10 | 18.76 | 50.86 |
| PAINTER: BRUSH AND ROLLER | 31.15 | 18.76 | 49.91 |
| PAINTER: SPRAY | 33.00 | 19.86 | 52.86 |
| PAINTER: BRUSH & ROLLER, DRYWALL TAPING & FINISHIN… | 32.50 | 19.86 | 52.36 |
| PAINTERS: SPRAY, SANDBLAST & WATERBLAST | 37.42 | 15.99 | 53.41 |
| PAINTERS: BRUSH, ROLLER & PAPERHANGER | 37.42 | 15.99 | 53.41 |
| PAINTERS:: SPRAY, SANDBLAST, POWER TOOLS, WATERBLA… | 32.12 | 21.20 | 53.32 |
| PAINTERS:: SPRAY OF MASTICS CREOSOTES, KWINCH KOAT… | 32.12 | 21.20 | 53.32 |
| PAINTERS: DRYWALL FINISHERS | 31.87 | 21.20 | 53.07 |
| PAINTERS: BRUSH & ROLLER OF MASTICS, CREOSOTES, KE… | 31.12 | 21.20 | 52.32 |
| PAINTERS: BRUSH & ROLLER | 31.12 | 21.20 | 52.32 |
| PAINTERS: SPRAY & POT MAN | 32.20 | 15.55 | 47.75 |
| PAINTERS: SANDBLASTING | 34.20 | 15.55 | 49.75 |
| PAINTERS: BRUSH & ROLLER | 31.20 | 15.55 | 46.75 |
| GLAZIER | 31.95 | 17.75 | 49.70 |
| PAINTERS: DRYWALL TAPING & FINISHING | 41.80 | 31.26 | 73.06 |
| PAINTERS: BRUSH AND ROLLER | 41.00 | 31.26 | 72.26 |
| PAINTERS: BRUSH & ROLLER | 41.00 | 31.26 | 72.26 |
| PAINTERS: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAS… | 27.04 | 16.27 | 43.31 |
| PAINTERS: SPRAY & SANDBLAST POT TENDERS AND GROUND… | 27.04 | 16.27 | 43.31 |
| PAINTERS: LEAD ABATEMENT | 32.24 | 16.27 | 48.51 |
| PAINTERS: BRUSH, ROLLER, PAPERHANGER, & DRYWALL FI… | 27.04 | 16.27 | 43.31 |
| PAINTERS: SPRAY/WATERBLASTING; SANDBLASTING | 26.10 | 16.39 | 42.49 |
| PAINTERS: BRUSH; ROLLER; PAPERHANGING; DRYWALL FIN… | 25.10 | 16.39 | 41.49 |
| GLAZIER | 35.13 | 19.57 | 54.70 |
| GLAZIER | 29.50 | 19.02 | 48.52 |
| GLAZIER | 44.09 | 30.73 | 74.82 |
| GLAZIER | 34.22 | 24.67 | 58.89 |
| GLAZIER | 36.03 | 20.55 | 56.58 |
| CEMENT MASON/CONCRETE FINISHER | 25.75 | 13.50 | 39.25 |
| CEMENT MASON/CONCRETE FINISHER | 28.50 | 13.50 | 42.00 |
| CEMENT MASON/CONCRETE FINISHER | 31.50 | 14.30 | 45.80 |
| PLASTERER | 25.69 | 11.75 | 37.44 |
| CEMENT MASON/CONCRETE FINISHER | 23.38 | 11.94 | 35.32 |
| CEMENT MASON/CONCRETE FINISHER | 36.01 | 25.40 | 61.41 |
| PLASTERER: AREA #46 | 31.50 | 18.32 | 49.82 |
| CEMENT MASON/CONCRETE FINISHER: AREA #821 | 30.02 | 18.20 | 48.22 |
| CEMENT MASON/CONCRETE FINISHER: AREA #83 | 32.55 | 22.04 | 54.59 |
| PLASTERER: AREA #83 | 30.60 | 17.19 | 47.79 |
| CEMENT MASON/CONCRETE FINISHER: AREA #83 | 32.55 | 22.04 | 54.59 |
| PLASTERER: AREA #83 | 30.60 | 17.19 | 47.79 |
| CEMENT MASON/CONCRETE FINISHER: AREA #83 | 32.55 | 22.04 | 54.59 |
| PLASTERER: AREA #83 | 30.60 | 17.19 | 47.79 |
| CEMENT MASON/CONCRETE FINISHER: AREA #83 | 32.55 | 22.04 | 54.59 |
| PLASTERER: AREA #83 | 30.60 | 17.19 | 47.79 |
| PLASTERER: AREA #121 | 33.76 | 20.05 | 53.81 |
| CEMENT MASON/CONCRETE FINISHER: AREA #121 | 33.50 | 21.95 | 55.45 |
| PLASTERER: AREA #121 | 33.76 | 20.05 | 53.81 |
| CEMENT MASON/CONCRETE FINISHER: AREA #121 | 33.50 | 21.95 | 55.45 |
| CEMENT MASON/CONCRETE FINISHER: AREA #165 | 41.24 | 24.55 | 65.79 |
| CEMENT MASON/CONCRETE FINISHER: AREA #406 | 43.72 | 35.59 | 79.31 |
| CEMENT MASON/CONCRETE FINISHER: AREA #532 | 35.00 | 20.61 | 55.61 |
| CEMENT MASON/CONCRETE FINISHER: AREA #566 | 32.50 | 20.77 | 53.27 |
| PLUMBERS AND PIPEFITTERS | 46.42 | 21.33 | 67.75 |
| PLUMBERS AND PIPEFITTERS | 46.65 | 23.45 | 70.10 |
| PLUMBER AND STEAMFITTER | 45.06 | 23.16 | 68.22 |
| PLUMBER (ELKHART, KOSCIUSKO, AND LAGRANGE COUNTIES… | 45.06 | 23.16 | 68.22 |
| PLUMBER, PIPEFITTER, STEAMFITTER | 44.93 | 23.03 | 67.96 |
| PLUMBER | 49.77 | 28.56 | 78.33 |
| PLUMBERS AND PIPEFITTERS | 40.70 | 29.52 | 70.22 |
| PLUMBERS AND PIPEFITTERS | 50.05 | 20.39 | 70.44 |
| PLUMBER AND STEAMFITTER | 50.05 | 20.39 | 70.44 |
| PLUMBER/PIPEFITTER | 32.00 | 20.13 | 52.13 |
| PIPEFITTER | 48.50 | 31.12 | 79.62 |
| ROOFER: SLATE & TILE | 36.05 | 21.04 | 57.09 |
| ROOFER: COMPOSITION | 34.55 | 21.04 | 55.59 |
| ROOFER (JASPER AND NEWTON COUNTIES) | 42.50 | 25.76 | 68.26 |
| ROOFER (DEARBORN, OHIO AND RIPLEY COUNTIES) | 33.00 | 19.51 | 52.51 |
| ROOFER: SLATE & TILE | 28.95 | 20.81 | 49.76 |
| ROOFER: COMPOSITION | 28.73 | 20.81 | 49.54 |
| ROOFER: SLATE & TILE (CLINTON COUNTY) | 24.60 | 20.09 | 44.69 |
| ROOFER: COMPOSITION (CLINTON COUNTY) | 24.38 | 20.09 | 44.47 |
| ROOFER: SLATE & TILE | 31.60 | 19.43 | 51.03 |
| ROOFER: COMPOSITION | 31.60 | 19.43 | 51.03 |
| ROOFER | 30.97 | 14.66 | 45.63 |
| ROOFER | 32.00 | 16.61 | 48.61 |
| ROOFER | 30.00 | 18.30 | 48.30 |
| SHEET METAL WORKER (HVAC DUCT WORK) | 40.19 | 27.33 | 67.52 |
| SHEET METAL WORKER | 45.81 | 26.57 | 72.38 |
| SHEET METAL WORKER (CLINTON COUNTY) | 37.82 | 26.37 | 64.19 |
| SHEET METAL WORKER | 40.91 | 25.22 | 66.13 |
| TRUCK DRIVER: GROUP12 ACEY WAGON | 35.19 | 20.51 | 55.70 |
| TRUCK DRIVER: GROUP11 HELPERS; GREASERS; TIRE MEN;… | 35.09 | 20.51 | 55.60 |
| TRUCK DRIVER: GROUP10 PICK-UP TRUCKS REMAINING COU… | 34.54 | 20.51 | 55.05 |
| TRUCK DRIVER: GROUP 5 TANDEM TRUCKS OVER 15 TONS P… | 34.89 | 20.51 | 55.40 |
| TRUCK DRIVER: GROUP 4 TANDEM AXLE FUEL TRUCKS; TAN… | 34.84 | 20.51 | 55.35 |
| TRUCK DRIVER: GROUP 2 SINGLE AXLE FUEL AND WATER T… | 34.74 | 20.51 | 55.25 |
| TRUCK DRIVER: GROUP 1 SINGLE/BATCHES AXLE STRAIGHT… | 34.69 | 20.51 | 55.20 |