IN20260001
rev 3Building, Heavy, Highway
110 trades
Applies to
La Porte, Lake, Porter, St Joseph
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering St Joseph County, Indiana are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0017-002 (LAKE AND PORTER COUNTIES) | $56.02 | $37.24 | $93.26 | |
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0017-002 (LAKE AND PORTER COUNTIES) | $56.02 | $37.24 | $93.26 | |
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0075-001 (REMAINING COUNTIES) | $41.20 | $30.93 | $72.13 | |
| BOILERMAKER Building BOIL0001-005 (LAKE COUNTY, CITY OF HAMMOND; NORTH OF 114TH STREET) | $58.91 | $39.75 | $98.66 | |
| BOILERMAKER Building BOIL0374-003 Scope differs by code/WD | $43.24 | $38.17 | $81.41 | |
| BRICKLAYER Residential SUIN2023-011 | $26.27 | $4.31 | $30.58 | |
| BRICKLAYER: MARBLE AND TILE FINISHER Building BRIN0004-018 (SOUTH BEND: ST. JOSEPH COUNTY) | $33.00 | $21.84 | $54.84 | |
| BRICKLAYER: MARBLE FINISHER; TILE FINISHER Building BRIN0004-011 (LAKE, LAPORTE AND PORTER COUNTIES) | $34.00 | $21.84 | $55.84 | |
| BRICKLAYER: TERRAZZO FINISHER Building BRIN0004-011 (LAKE, LAPORTE AND PORTER COUNTIES) | $33.00 | $21.84 | $54.84 | |
| BRICKLAYER: TERRAZZO FINISHER Building BRIN0004-018 (SOUTH BEND: ST. JOSEPH COUNTY) | $33.00 | $21.84 | $54.84 | |
| CARPENTER Residential SUIN2023-011 | $23.43 | $9.44 | $32.87 | |
| CARPENTER (LAKE, LAPORTE AND PORTER COUNTIES) Building CARP0765-001 | $45.91 | $35.90 | $81.81 | |
| CARPENTER (ST. JOSEPH COUNTY) Building CARP0413-002 | $34.70 | $25.98 | $60.68 | |
| CEMENT MASON: BUILDING CONSTRUCTION Building PLAS0438-001 (LAPORTE COUNTY, EASTERN PORTION OF PORTER COUNTY WEST TO BUT NOT INCLUDING CHESTERTON IN THE NORTH AND WEST TO AND INCLUDING KOUTS IN THE SOUTH) | $36.01 | $25.40 | $61.41 | |
| CEMENT MASON/CONCRETE FINISHER: BUILDING CONSTRUCTION Building PLAS0406-001 (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT) AND PORTER COUNTIES) | $35.48 | $21.68 | $57.16 | |
| CEMENT MASON/CONCRETE FINISHER: BUILDING CONSTRUCTION Building PLAS0406-001 (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT) AND PORTER COUNTIES) | $35.48 | $21.68 | $57.16 | |
| CEMENT MASON/CONCRETE FINISHER: BUILDING CONSTRUCTION (ST. JOSEPH COUNTY) Building PLAS0101-007 Scope differs by code/WD | $28.84 | $14.48 | $43.32 | |
| CEMENT MASON/CONCRETE FINISHER: BUILDING CONSTRUCTION (ST. JOSEPH COUNTY) Building PLAS0101-007 Scope differs by code/WD | $28.84 | $14.48 | $43.32 | |
| CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION Building PLAS0165-001 (LAKE COUNTY (EXCEPT BY THE NORTHEAST SECTION LYING NORTH OF CROWN POINT AND EAST OF GRIFFITH)) | $33.94 | $13.80 | $47.74 | |
| CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION Building PLAS0165-001 (LAKE COUNTY (EXCEPT BY THE NORTHEAST SECTION LYING NORTH OF CROWN POINT AND EAST OF GRIFFITH)) | $33.94 | $13.80 | $47.74 | |
| CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION Building PLAS0406-001 (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT) AND PORTER COUNTIES) | $32.00 | $15.74 | $47.74 | |
| CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION Building PLAS0406-001 (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT) AND PORTER COUNTIES) | $32.00 | $15.74 | $47.74 | |
| CEMENT MASON/CONCRETE FINISHER: HEAVY/HIGHWAY Building PLAS0101-006 (ST. JOSEPH COUNTY) | $31.50 | $14.30 | $45.80 | |
| ELECTRICIAN Residential ELEC0153-006 | $27.00 | $18.29 | $45.29 | |
| ELECTRICIAN (LAKE COUNTY) Building ELEC0697-001 | $52.00 | $32.85 | $84.85 | |
| ELECTRICIAN (LAPORTE AND PORTER COUNTIES) Building ELEC0531-001 | $49.00 | $32.89 | $81.89 | |
| ELEVATOR MECHANIC Building ELEV0044-001 (LA PORTE AND ST. JOSEPH COUNTIES) A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE | $62.27 | $38.44 | $100.71 | |
| ELEVATOR MECHANIC: Building ELEV0002-005 (LAKE AND PORTER COUNTIES) DAY; VETERANS DAY, MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE, AND 6% OF REGULAR HOURLY RATE FOR LESS THAN 5 YEARS OF SERVICE | $70.68 | $38.44 | $109.12 | |
| GLAZIER Building PAIN0027-004 (LAKE COUNTY, WEST OF HIGHWAY #41, INCLUDING HAMMOND AREA) | $53.55 | $44.88 | $98.43 | |
| GLAZIER Building PAIN1165-005 (LAKE (EAST OF HIGHWAY #41 EXCLUDING HAMMOND AREA), LAPORTE AND PORTER COUNTIES) | $44.09 | $30.63 | $74.72 | |
| GLAZIER (ST. JOSEPH COUNTY) Building PAIN1165-009 | $34.22 | $24.67 | $58.89 | |
| IRONWORKER Building IRON0292-001 (ST. JOSEPH AND LAPORTE (REMAINDER OF COUNTY) COUNTIES) | $39.76 | $25.00 | $64.76 | |
| IRONWORKER: SHEETER Building IRON0395-001 (LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50 MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE ON W. TO 3 MILES E. OF IN. COUNTIES) | $48.00 | $41.28 | $89.28 | |
| IRONWORKER: STRUCTURAL & ORNAMENTAL Building IRON0395-001 (LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50 MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE ON W. TO 3 MILES E. OF IN. COUNTIES) | $47.75 | $41.28 | $89.03 | |
| LABORER (COMMON OR GENERAL) Residential LABO0081-007 | $37.34 | $26.03 | $63.37 | |
| LABORER: PIPELAYER Residential LABO0081-006 | $31.74 | $23.63 | $55.37 | |
| LABORERS: Building LABO0645-004 (HEAVY AND HIGHWAY CONSTRUCTION) GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR MAN; MULTI-PLATEERECTOR; RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); ROAD MARKIN AND DELINEATION LABORER; SETTING AND PLACING OF ALL PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN GEORGIA BUGGY OPERATOR; POWER-DRIVEN CMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN OR ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMBERS; SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (ST. JOSEPH COUNTY) | $27.40 | $17.22 | $44.62 | |
| LABORERS: BUILDING CONSTRUCTION: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS Building LABO0041-001 (OTHER THAN FOR MASON OR PLASTERERS); RAILROAD WORKERS, MASONRY WALL WORKERS, (INTERIOR & EXTERIOR); PORTABLE WATER, PUMPS WITH DISCHARGE UP TO 3 INDCHES; HANDLING OF CREOSOTE LUMBER OR LIKE TREATED MATERIAL (EXCLUDING RAILROAD MATERIAL); ASPHALT RAKERS AND LUTEMEN; EARTH COMPACTORS; JACKMEN AND SHEETMEN WORKING DITCHES DEEPER THAN SIX (6) FEET IN DEPTH; LABORERS WORKING DITCHES SIX (6) FEET IN DEPTH OR DEEPER; ASSEMBLY OF UNICRETE PUMP; TILE LAYERS (SEWER OR FIELD) AND SEWER PIPE LAYERS (METALLIC OR NON-METALLIC); MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATORS; PUMP CRETE ASSEMBLERS; CORE DRILL OPERATORS; CEMENT, LIME OR SILICA CLAY HANDLER (BULK OR BAG); HANDLING OF TOXIC MATERAIL DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE AND WINCH OPERATORS; WATER MAIN AND CABLE DUCKING (METALLIC AND NON-METALLIC); SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATORS; CONCRETE SAW; CONCRETE CONVEYOR ASSEMBLERS; APPLYING OF CURING COMPOUND; SINKING OF WELLPOINTS; DEWATERING HEADER SYSTEMS (LAKE COUNTY (WESTERN HALF)) | $39.26 | $28.90 | $68.16 | |
| LABORERS: BUILDING CONSTRUCTION: GROUP 2 PLASTER TENDERS, MASONS TENDERS; MORTAR MIXERS; WELDERS Building LABO0041-001 (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS FOR PLASTERERS; SCAFFOLD BUILDERS FOR MASONS; WATER BLAST MACHINE OPERATORS; AIR TOOL OPERATORS AND ALL PNEUMATIC TOOL OPERATORS, AIR AND ELECTRIC VIBRATORS AND CHPPING HAMMER OPERATORS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL; ALL BOILER SETTERS LABORERS, INCLUDING EXPEDITERS, BOTTOM MEN, BELL MEN, AND MASON TENDERS (LAKE COUNTY (WESTERN HALF)) | $40.01 | $28.90 | $68.91 | |
| LABORERS: BUILDING CONSTRUCTION: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES. (LAKE COUNTY (WESTERN HALF)) Building LABO0041-001 | $40.26 | $28.90 | $69.16 | |
| LABORERS: CAISSON AND TUNNEL WORK Building LABO0041-001 (COMPRESSED & FREE AIR) (BUILDING CONSTRUCTION) (LAKE COUNTY (WESTERN HALF)) Premium for all employees working in compressed air shall be as follows: 0 - 15 lbs. $1.00 per hour 16 - 20 lbs. 1.50 per hour 21 - 26 lbs. 2.00 per hour 27 - 33 lbs. 3.00 per hour 34 & over 4.00 per hour | $40.30 | $28.90 | $69.20 | |
| LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS Building LABO0081-004 (OTHER THAN FOR MASON OR PLASTERERS); MECHANIC TENDERS; RODMEN AND CHAINMEN, RAILROAD WORKERS, MASONRY WALL WORKERS, (INTERIOR & EXTERIOR); ROOFER TENDERS, CEMENT FINISHER TENDERS, CARPENTER TENDERS, PORTABLE WATER, PUMPS WITH DISCHARGE UP TO 3 INCHES; WATERPROOFING; HAULING OF CREOSOTE LUMBER OR LUTEMEN; ASPHALT RAKERS; KETTLEM, EARTH COMPACTORS; JACKMAN AND SHEETMEN IN DITCHES MORE THAN 6 FT. DEEP; LABORERS IN DITCHES 6' DEEP OR DEEPER; ASSEMBLY OF UNCRETE PUMP; TILE LAYERS (SEWER OR FIELD); SEWER PIPE LAYERS; MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATOR; PUMP CRETE ASSEMBLERS; CORE DRILL OPERATOR; CEMENT, LINE OR SILICA CLAY HANDERS; HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE AND WINCH OPERATOR; WATER MAIN AND CABLE DUCKING; SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATOR; CONCRETE CONVEYOR ASSEMBLER (LAKE (EASTERN HALF), LA PORTE, AND PORTER COUNTIES) | $39.89 | $30.30 | $70.19 | |
| LABORERS: GROUP 2 Building LABO0645-004 (HEAVY AND HIGHWAY CONSTRUCTION) CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, HOD CARRIER (TENDING BRICKLAYERS); TVING AND ASSOCIATED GROUTING OF UTILITY LINES. (ST. JOSEPH COUNTY) | $27.90 | $17.22 | $45.12 | |
| LABORERS: GROUP 2 PLASTER TENDERS, MASONS TENDERS; MORTAR MIXERS; WELDERS Building LABO0081-004 (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE; CEMENT GUN; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS, AND MASON; WATER BLAST MACHINE OPERATOR; AIR TOOL OPERATORS AND ALL PHEUMATIC TOOL OPERATORS; AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL (LAKE (EASTERN HALF), LA PORTE, AND PORTER COUNTIES) | $40.64 | $30.30 | $70.94 | |
| LABORERS: GROUP 3 Building LABO0645-004 (HEAVY AND HIGHWAY CONSTRUCTION) AIR TRACK AND WAGE DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CUTTING (ST. JOSEPH COUNTY) | $28.40 | $17.22 | $45.62 | |
| LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES; LABORER SPECIALIST Building LABO0081-004 (LAKE (EASTERN HALF), LA PORTE, AND PORTER COUNTIES) | $40.89 | $30.30 | $71.19 | |
| LABORERS:: GROUP 1 Building LABO0645-001 (ST JOSEPH COUNTY) (BUILDING CONSTRUCTION) | $29.88 | $18.70 | $48.58 | |
| LABORERS:: GROUP 1 Building LABO0645-002 (ST JOSEPH COUNTY) (UTILITY CONSTRUCTION) | $30.65 | $18.00 | $48.65 | |
| LABORERS:: GROUP 1 (LA PORTE & PORTER COUNTIES) Building LABO0081-002 | $33.45 | $27.50 | $60.95 | |
| LABORERS:: GROUP 2 Building LABO0645-001 (ST JOSEPH COUNTY) (BUILDING CONSTRUCTION) | $30.38 | $18.70 | $49.08 | |
| LABORERS:: GROUP 2 Building LABO0645-002 (ST JOSEPH COUNTY) (UTILITY CONSTRUCTION) | $31.15 | $18.00 | $49.15 | |
| LABORERS:: GROUP 3 Building LABO0645-001 (ST JOSEPH COUNTY) (BUILDING CONSTRUCTION) | $31.88 | $18.70 | $50.58 | |
| LABORERS:: GROUP 3 Building LABO0645-002 (ST JOSEPH COUNTY) (UTILITY CONSTRUCTION) | $31.65 | $18.00 | $49.65 | |
| LINE CONSTRUCTION:: EQUIPMENT OPERATOR 1: Building ELEC1393-003 (DIGGERS 5TH WHEEL TYPE TRUCKS, CRAWLER TYPE, D-4 AND SMALLER, BUCKET TRUCKS AND LIVE BOOM TYPE LINE TRUCKS) (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30)) | $38.33 | $18.92 | $57.25 | |
| LINE CONSTRUCTION:: EQUIPMENT OPERATOR 3 Building ELEC1393-003 (BACKHOE OVER 1/2 YARD BUCKET CAPACITY, CRANES RATED AT 15 TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30)) | $47.35 | $21.53 | $68.88 | |
| LINE CONSTRUCTION:: GROUNDMAN Building ELEC1393-003 (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30)) | $31.49 | $16.71 | $48.20 | |
| LINE CONSTRUCTION:: GROUNDMAN-TRUCK DRIVER Building ELEC1393-003 (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30)) | $31.49 | $16.71 | $48.20 | |
| LINE CONSTRUCTION:: LINEMAN Building ELEC1393-003 (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30)) | $50.28 | $22.16 | $72.44 | |
| MILLWRIGHT Building CARP1029-001 (ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD, HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST. JOSEPH, STEUBEN, TIPTON, WABASH, WELLS AND WHITLEY COUNTIES) | $35.89 | $30.52 | $66.41 | |
| MILLWRIGHT (LAKE, LAPORTE AND PORTER COUNTIES) Building CARP0765-001 | $47.92 | $37.23 | $85.15 | |
| PAINTER: BRUSH & ROLLER, DRYWALL TAPING & FINISHING, VINYL/PAPER HANGING Building PAIN0091-004 (LA PORTE (EVERYTHING EAST OF HWY 39 AND NORTH OF HWY 20, INCLUDING THE CITIES OF LAPORTE AND MICHIGAN CITY); ST. JOSEPH COUNTIES) | $32.50 | $19.86 | $52.36 | |
| PAINTER: SPRAY Building PAIN0091-004 (LA PORTE (EVERYTHING EAST OF HWY 39 AND NORTH OF HWY 20, INCLUDING THE CITIES OF LAPORTE AND MICHIGAN CITY); ST. JOSEPH COUNTIES) | $33.00 | $19.86 | $52.86 | |
| PAINTERS: DRYWALL FINISHING Building PAIN0460-003 (PORTER, LAKE AND THE REMAINDER OF LA PORTE COUNTY)) | $41.00 | $31.26 | $72.26 | |
| PAINTERS: PAINTER Building PAIN0460-003 (PORTER, LAKE AND THE REMAINDER OF LA PORTE COUNTY)) | $41.00 | $31.26 | $72.26 | |
| PIPEFITTER Building PLUM0597-003 (LAKE (ENTIRE COUNTY), LA PORTE (EXCLUDING THE CITY OF LA PORTE), PORTER (ENTIRE COUNTY)) | $48.50 | $31.12 | $79.62 | |
| PLASTERER Building PLAS0165-001 (LAKE COUNTY (EXCEPT BY THE NORTHEAST SECTION LYING NORTH OF CROWN POINT AND EAST OF GRIFFITH)) | $32.70 | $17.70 | $50.40 | |
| PLASTERER Building PLAS0165-001 (LAKE COUNTY (EXCEPT BY THE NORTHEAST SECTION LYING NORTH OF CROWN POINT AND EAST OF GRIFFITH)) | $32.70 | $17.70 | $50.40 | |
| PLASTERER Building PLAS0406-001 (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT) AND PORTER COUNTIES) | $33.28 | $17.32 | $50.60 | |
| PLASTERER Building PLAS0406-001 (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT) AND PORTER COUNTIES) | $33.28 | $17.32 | $50.60 | |
| PLASTERER: BUILDING CONSTRUCTION Building PLAS0101-007 (ST. JOSEPH COUNTY) | $26.81 | $12.40 | $39.21 | |
| PLASTERER: BUILDING CONSTRUCTION Building PLAS0101-007 (ST. JOSEPH COUNTY) | $26.81 | $12.40 | $39.21 | |
| PLUMBER Building PLUM0210-001 (LAKE, LAPORTE (EXCLUDING THE CITY OF LAPORTE) AND PORTER COUNTIES) | $49.77 | $28.56 | $78.33 | |
| PLUMBER Residential PLUM0136-013 | $34.01 | $14.00 | $48.01 | |
| PLUMBER, PIPEFITTER, STEAMFITTER Building PLUM0172-006 (LA PORTE COUNTY (CITY OF LAPORTE) AND ST. JOSEPH COUNTIES) | $44.93 | 0.00 | $44.93 | |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 1 ASPHALT PLANT; AUTOGRADE; BATCH PLANT); BENOTO Building ENGI0150-001 (REQUIRES 2 ENGINEERS; BOILER & THROTTLE VALVE; BORING MACHINE (MINING MACHINE); CAISSON RIGS; CENTRAL REDI-MIX PLANT; COMBINATION BACKHOE ENDLOADER WITH BACKHOE BUCKET OVER 1/2 CU. YD. OR WITH ATTACHMENTS; COMBINATION TUGGER HOIST & AIR COMPRESSOR; COMPRESSOR & THROTTLE; CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE CONVEYOR; CONCRETE CONVEYOR (TRUCK MOUNTED); CONCRETE PAVER OVER 27E CU.FT.; CONCRETE PAVER 27E CU. FT. & UNDER; CONCRETE PLACING BOOM; CONCRETE PUMP/GROUT PUMP WITH BOOM (TRUCK MOUNTED); CONCRETE PUMP WITH BOOM (TRUCK MOUNTED); CONCRETE TOWER; CRANES AND BACKHOES (ALL ATTACHMENTS); CRANES, HAMMERHEAD TOWER; CRETER CRANE; DERRICKS (ALL); DERRICKS (TRAVELING); FORKLIFT LULL TYPE; FORKLIFT, 10 TON & OVER; GRADALL, HOIST 1, 2, AND 3 DRUMS; HOIST (2 TUGGER L FLOOR), HYDRAULIC BOOM TRUCK, LASER SCREED, LOCOMOTIVE (ALL), MOTOR PATROL, MUCKING MACHINE; PILE DRIVING AND SKID RIG, PIT MACHINE, PRESTRESS MACHINES, PUMP CRETES (AND SIMILAR TYPES), ROCK DRILL (SELF-PROPELLED), ROCK DRILL TRUCK MOUNTED; SLIP FORM PAVER, STRADDLE BUGGIES, TRACTOR WITH BOOM AND SIDE BOOM, TRENCHING MECHINE; WINCH TRACTORS, WELDING MACHINES (6-9), (LAKE, LAPORTE, AND PORTER COUNTIES) | $48.70 | $45.93 | $94.63 | |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 1 MECHANIC, ASPHALT PLANT, ASPHALT SPREADER, AUTO GRADER; BATCH PLANT, BENOTO Building ENGI0150-012 (REQUIRES 2 ENGINEERS), BOILER AND THROTTLE VALVE, BORING MACHINE (ROAD), BULLDOZERS (WITH ENGINES OF 140 NET HORSE POWER OR MORE) CAISSON RIGS, CENTRAL REDI-MIX PLANT, CONCRETE CONVEYOR SYSTEMS, CONCRETE POWER (OVER 27E CU. FT.), CONCRETE PAVER (27E CU. FT. AND UNDER), CONCRETE PUMPS/GROUT CNCRETE PLACER (TRUCK MOUNTED), CONCRETE TOWER, CRANES AND BACKHOES (ALL), CRANES, HAMMERHEAD TOWER, CRETER CRANE, DERRICKS (ALL), FORKLIFT (CAPBLE OF HOISTING AND MECHANICALLY MOVING FORKS HORIZONTALLY), GRADER, ELEVATING, HIGHLIFT SHOVELS OR FRONT END LOADERS (OVER 3 YD BUCKET), HOISTS (2 OR MORE DRUMS), LOCOMOTIVES (ALL), LASER SCREED, MOTOR PATROL, PILE DRIVERS AND SKID RIG, PRE-STRESS MACHINES, PUMP CRETES & SIMILAR TYPES, ROCK DRILL (SELF-PROPELLED), ROCK DRILL (SELF PROPELLED TRUCK MOUNTED), SCOOPS (TRACTOR DRAWN), SLIP-FORM PAVER, TOURNAPULL, TRACTOR WITH BOOM & SIDE BOOM, TRENCHING MACHINE (12 OR MORE INCHES IN WIDTH), COMBINATION BACKHOE FRONT END LOADER MACHINE WITH BACKHOE 1/2 YD BUCKET OR ATTACHMENTS. (ST. JOSEPH COUNTY) | $36.15 | $38.65 | $74.80 | |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 2 AIR COMPORESSOR Building ENGI0150-001 (3) (FEEDING A COMMON RECEIVER); ASPHALT SPREADER; BOILERS; BULLDOZERS; COMBINATION BACKHOE END LOADER WITH BACKHOE BUCKET 1/2 CU. YD. AND UNDER OR WITH ATTACHMENTS; CORBOY DRILLING MACHINE; GRADER, ELEVATING; GROUTING MACHINES; GUARD RAIL POST DRIVER; HIGHLIFT SHOVEL OR FRONTEND LOADER; HOIST (AUTOMATIC), HOIST (ALL ELEVATORS); HOIST (TUGGER AND SINGLE DRUM); POST HOLE DIGGER; ROLLERS (ALL); SCOOP (TRACTOR DRAWN); STONE CRUSHERS; TOURNAPULL; WINCH TRUCKS (LAKE, LAPORTE, AND PORTER COUNTIES) | $47.90 | $45.93 | $93.83 | |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 2 AIR COMPRESSOR Building ENGI0150-012 (600 CU. FT. AND OVER), BOB CAT (OVER 3/4 CU. YD.), BOILERS, BROOM (ALL POWERED PROPELLED), BULL DOZERS WITH ENGINES OF LESS THAN 140 NET HORSEPOWER, COMBINATION BACKHOE FRONT END LOADER 1/2 YF BSKHHOE OR UNDER, COMPRESSOR AND THROTTLE VALVE, CONCRETE BREAKER (TRUCK MOUNTED), CONCRETE MIXER (OF MOORE THAN 21 CU. FT. CAPACITY), FORKLIFT (WITH FIXED OR TILT MAST), GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS (1 DRUM), HYDRULIC BOOM TRUCK, POST HOLE DIGGER (VEHICLE MOUNTED), PUMP CRETES (SQUEZE CRETE TYPE PUMPS, GYPSUM, BULKER , ROLLERS(ALL), STEAM GENERATORS, STONE CRUSHERS, STRADDDLE BUGGIES, TRACTORS, WINCH TRUCKS (WITH ""A"" FRAME. (ST. JOSEPH COUNTY) | $34.80 | $38.65 | $73.45 | |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 3 AIR COMPRESSOR - SMALL 210 AND UNDER Building ENGI0150-001 (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FEET); AIR COMPRESSOR - LARGE OVER 210; AIR COMPRESSOR (2) FEEDING A COMMON RECEIVER; COMBINATION - SMALL EQUIPMENT OPERATOR; CONCRETE MIXER (TWO BAG & OVER); CONVEYOR, PORTABLE; FORKLIFT-UNDER 10 TON; GENERATOR; PUMPS (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FEET); PUMPS, WELL POINTS; STEAM GENERATORS; TRACTORS, FARM & SIMILAR TYPE; WELDING MACHINES (2 THRU 5); WINCHES, 4 ELECTRIC DRILLO WINCHES (LAKE, LAPORTE, AND PORTER COUNTIES) | $43.60 | $45.93 | $89.53 | |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 3 BUCK HOIST, COMBINATION Building ENGI0150-012 (SMALL EQUIPMENT OPERATOR), .CONVEYOR (PORTABLE), GROUTING MACHINE, HOIST ELEVATORS (MATERIAL AND PERSONNEL), HYDRAULIC POWER UNITS, GROUTING AND PILE DRIVING, STUD WELDER, TRENCHING MACHINES LESS THAN 12 INCHES IN WIDTH, WELDING MACHINES (8 THROUGH 15). (ST. JOSEPH COUNTY) | $34.00 | $38.65 | $72.65 | |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 4 BOBCAT Building ENGI0150-012 (UP TO AND INCLUDING 3/4 CU. YD.). COMPRESSOR (OVER 210 CU. FT. AND LESS THAN 600 CU. FT.), GENERATOR (OVER 50 KW.), HEATERS, MECHANICAL, HOISTS (ALL ELEVATOR, PERMANENT INSTALLATION), HOIST (AUTOMATIC), HOIST (TUGGER SINGLE DRUM), OILERS, PUMPS, WELL POINTS AND ELECTRIC SUBMERSIBLE, SMALL RUBBER TIRED END LOADERS (1/4 CU. YD. AND UNDER), TRACTORS (FARM TYPE) WELDING MACHINES (2 THROUGH 8). (ST. JOSEPH COUNTY) | $33.20 | $38.65 | $71.85 | |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 4 BULL GANG Building ENGI0150-001 (CRANE ERECTION CREW); HEATERS, MECHANICAL (1 TO 5); OILERS; SWITCHMEN (LAKE, LAPORTE, AND PORTER COUNTIES) | $41.40 | $45.93 | $87.33 | |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 BOBCATS AND FORKLIFTS Building ENGI0150-012 (COMMERCIAL OR RESIDENTIAL). (ST. JOSEPH COUNTY) | $30.60 | $38.65 | $69.25 | |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 FORK LIFTS Building ENGI0150-001 (HOUSING AND COMMERCIAL ONLY) (LAKE, LAPORTE, AND PORTER COUNTIES) | $35.95 | $45.93 | $81.88 | |
| POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 1 ASPHALT PLANTS Building ENGI0150-014 (CONSTRUCTION), ASPHALT PLANT (PERMANENT), AUTO PATROL (MAINTAINER), AUTOMATIC DRY BATCH PLANT, AUTOMATED CONCRETE PLACER, AUTOMATED SUB-GRADER, AUTOMATED SLIP FORM PAVER, AUTOMATED FINISH MACHINE, COMBINATION BACKHOE FRONT, END LOADER MACHINE (1/2 CU. YD.), BACKHOE BUCKET OR OVER OR WITH ATTACHMENTS), COMBINATION BACKHOE 1 CU YD, BACKHOE BUCKET OR OVER OR WITH ATTACHMENTS, BALLAST REGULATOR (RR), BELT LOADER (STATIONARY), BORING MACHINE (ROAD), BULLDOZER, CONCRETE MIXER(27 CU. FT. OR OVER), CONCRETE PUMP (TRUCK MOUNTED), CONCRETE BREAKER (TRUCK MOUNTED AND SELF-PROPELLED), CORE DRILLING MACHINE, CRANES AND BACKHOES (ALL ATTACHMENTS), CRANES, HAMMERHEAD, CRETER CRANE, CRUSHERS (CONCRETE, ROCK, RECYCLING, ETC.), DERRICKS , DERRICKS (TRAVELING), DREDGE OPERATOR, FORMLESS CURB AND GUTTER MACHINE (36 INCHES AND OVER), FORMLESS CURB AND GUTTER MACHINE UNDER 36 INCHES, GRADALL AND MACHINES (OF A LIKE NATURE), GUARDRAIL POST DRIVER (TRUCK MOUNTED), LEAD GREASER, HELICOPTER, HIGHLIFT SHOVEL (3 YD. AND OVER), HOIST (1 DRUM), HOIST (2, AND 3 DRUMS), HYDRAULIC POWER UNITS (GROUTING, PILEDRIVING AND EXTRACTING) HYDRO OR WATER BLASTER (SELF-PROPELLED), LOCOMOTIVE OPERATORS, MECHANIC, WELDER, MUCKING MACHINE, PANELBOARD CONCRETE PLANT (CENTRAL MIX TYPE), PAVER (HETHERINGTON), PILE DRIVER (SKID OR CRAWLER), ROAD PAVING MIXER, ROCK DRILL CRAWLER OR SKID RIG, ROCK DRILL (TRUCK MOUNTED), ROSS CARRIER, ROTO MILL GRINDER (36"" AND OVER), ROTO MILL GRINDER (LESS THAN 36""), THROTTLE VALVE AND COMPRESSOR OR CLEVER BROOKS TYPE COMBINATION, THROTTLE VALVE AND FIREMAN COMBINATION OR HORIZONTAL OR UPRIGHT BOILER, TOURNAPULL OR SIMILAR TYPE EQUIPMENT, TRACTOR (BOOM), TRACTOR DRAWN BELT LOADER WITH ATTACHED PUSHER (REQUIRES TWO ENGINEERS), TRENCH MACHINE, TUG BOAT OPERATOR, WHEEL EXCAVATOR, WINCH TRACTOR WITH ""A"" FRAME, SCOOPS, TURNAPULL OR SIMILAR TYPES MACHINE USED IN TANDEM (ADD $1.00 TO CLASS L HOURLY RATE FOR EACH MACHINE ATTACHED THERE TO). (LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES) | $49.05 | $43.40 | $92.45 | |
| POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 3 BACK FILLER, BITUMINOUS DISTRIBUTOR, BROOM AND BELT MACHINE, BULL FLOAT, COMPRESSOR Building ENGI0150-014 (COMMON RECEIVER 2), CONCRETE CUTTER WHEEL TYPE (ROCKWELL), CONCRETE FINISHING MACHINE, CONCRETE SPREADER (POWER DRIVEN), DIGGER, POST HOLE (POWER DRIVEN), FINISHING MACHINE AND BULL FLOAT, FORKLIFT, FORM GRADER, FORM TAMPER (MOTOR DRIVEN), HYDRAULIC (BOOM TRUCK) WHEN USED FOR HAULING MATERIALS, LASER SCREED, MUTIPLE TAMPING MACHINE, PAVING BREAKER, ROLLER (EARTH AND SUBBASE MATERIAL), ROLLER SHEEPFOOT (SELF-PROPELLED), SUB-GRADER, TAMPER, MUTIPILE VIBRATING (EARTH AND SUBBASE MATERIAL), TRACTAIRE WITH DRILL, TRACTOR (WITH ALL DRAWN ATTACHEMENTS EXCEPT BACKHOE AND INCLUDING HIGHLIFT, ENDLOADER OF 1 CU. YD. CAPACITY AND LESS. (LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES) | $48.15 | $43.40 | $91.55 | |
| POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 4 AIR COMPRESSORS, CONVEYOR Building ENGI0150-014 (ALL), FIREMAN ON BOILER, GENERATOR, GROUT MACHINE, POWER CURING SPRAYING MACHINE (SELF-PROPELLED), BROOM (SELF-PROPELLED), SEAMAN TILLER, SKID STEER LOADERS, SPIKE MACHINE (RR), STRIPPING MACHINE (PAINT, SELF-PROPELLED), THROTTLE VALVE, WELDING MACHINE, WELL POINTS SYSTEM. (LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES) | $46.95 | $43.40 | $90.35 | |
| POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 5 DECK HAND, HETHERINGTON DRIVER, MECHANICAL HEATER Building ENGI0150-014 (1 TO 5), OUTBOARD OR INBOARD MOTOR BOAT, OILER, POWER SAW (CONCRETE POWER DRIVEN), WATER PUMP, GRASSCUTTER. (LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES) | $45.90 | $43.40 | $89.30 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Residential ENGI0150-034 | $49.05 | $43.40 | $92.45 | |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER Residential ENGI0150-034 | $49.05 | $43.40 | $92.45 | |
| POWER EQUIPMENT OPERATOR: BULLDOZER Residential ENGI0150-034 | $49.05 | $43.40 | $92.45 | |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE Residential ENGI0150-052 | $36.15 | $38.65 | $74.80 | |
| POWER EQUIPMENT OPERATOR: LOADER Residential ENGI0150-034 | $49.05 | $43.40 | $92.45 | |
| POWER EQUIPMENT OPERATOR: ROLLER Residential ENGI0150-052 | $34.80 | $38.65 | $73.45 | |
| ROOFER Residential SUIN2023-011 | $27.22 | $14.47 | $41.69 | |
| ROOFER (LAKE AND PORTER COUNTIES) Building ROOF0026-003 | $47.47 | $27.81 | $75.28 | |
| ROOFER: COMPOSITION Building ROOF0023-006 (LA PORTE AND ST. JOSEPH COUNTIES) | $34.55 | $21.04 | $55.59 | |
| ROOFER: SLATE & TILE Building ROOF0023-006 (LA PORTE AND ST. JOSEPH COUNTIES) | $36.05 | $21.04 | $57.09 | |
| SHEET METAL WORKER Building SHEE0020-015 (LAKE, LAPORTE, AND PORTER COUNTIES) | $52.96 | $31.41 | $84.37 | |
| SHEET METAL WORKER (ST. JOSEPH COUNTY) Building SHEE0020-013 | $44.45 | $30.43 | $74.88 | |
| SPRINKLER FITTER Building SFIN0669-002 | $44.20 | $27.88 | $72.08 | |
| SPRINKLER FITTERS Building SFIN0281-001 (PORTER COUNTY (NORTH OF U.S. ROUTE 30)) | $48.10 | $27.05 | $75.15 | |
| TELECOMMUNICATION TECHNICIAN - WORK COVERS LOW VOLTAGE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES Building ELEC0697-004 (VOICE, SOUND, DATA AND VIDEO) INCLUDING, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V/SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK). DOES NOT COVER ANY WORK WHICH PROPERLY COMES UNDER THE WORK DESCRIPTION OF INSIDE JW (JOURNEYMAN WIREMAN), BUT SHALL COVER THE PULLING OF WIRE IN RACEWAYS, BUT NOT THE INSTALLATION OF RACEWAYS. (LAKE COUNTY) | $41.50 | $31.23 | $72.73 | |
| TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION Building TEAM0142-002 (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 6) | $36.60 | $35.48 | $72.08 | |
| TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION Building TEAM0142-002 (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 5) | $36.15 | $35.48 | $71.63 | |
| TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION Building TEAM0142-002 (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 4) | $38.20 | $35.48 | $73.68 | |
| TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION Building TEAM0142-002 (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 3) | $38.00 | $35.48 | $73.48 | |
| TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION Building TEAM0142-002 (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 2) | $37.80 | $35.48 | $73.28 | |
| TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION Building TEAM0142-002 (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 1) | $37.60 | $35.48 | $73.08 | |
| TRUCK DRIVER GROUP 1 Building TEAM0364-004 (BUILDING CONSTRUCTION) PICKUP TRUCKS (ST. JOSEPH COUNTY) FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.75 | 0.00 | $33.75 | |
| TRUCK DRIVER GROUP 2 Building TEAM0364-004 (BUILDING CONSTRUCTION ) SINGLE AXLE TRUCKS (ST. JOSEPH COUNTY) FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.95 | 0.00 | $33.95 | |
| TRUCK DRIVER GROUP 3 Building TEAM0364-004 (BUILDING CONSTRUCTION) TANDEM, TRIAXLE AND FUEL TRUCKS (ST. JOSEPH COUNTY) FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $34.25 | 0.00 | $34.25 | |
| TRUCK DRIVER GROUP 4 Building TEAM0364-004 (BUILDING CONSTRUCTION) SEMI TRAILER TRUCKS (ST. JOSEPH COUNTY) FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $34.75 | 0.00 | $34.75 | |
| TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 1 SINGLE AXLE TRUCKS, SEVEN Building TEAM0135-004 (7) CU. YDS. OR LESS THAN TEN AND ONE-HALF (10 1/2) TONS, DUPSTERS, SCOOP-MOBILES FIVE (5) CU.YDS. AND UNDER OR LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS, MIXER TRUCKS THREE (3) CU.YDS. AND UNDER, AIR COMPRESSORS AND WELDING MACHINES, INCLUDING THOSE PULLED BY SEPARATE UNITS, BATCH TRUCKS-WET OR DRY- 2""34-E"" BATCHES OR LESS, TRUCK DRIVER HELPERS, WAREHOUSEMEN, MECHANIC'S HELPERS, GREASERS AND TIREMEN, ALL PICK-UP TRUCKS AND OTHER VEHICLES. DRIVERS ON DUMPSTERS OR SIMILAR DUMPSTERS, MOUNTED ON FOUR (4) WHEEL TRUCK RATED TWO (2) CU.YDS. OR LESS, AND SMALL PALLET TYPE FORK-LIFT OPERATOR AND DRIVERS ON PALLET JACKS OR SIMILAR TYPE EQUIPMENT. (LA PORTE COUNTY) A: $37.90 PER DAY & 460.00 PER WEEK | $32.67 | 0.00 | $32.67 | |
| TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN Building TEAM0135-004 (18) CU.YDS. OR TWENTY- FOUR (24) TONS GROSS, SIX (6) WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TROUNATRAILERS, TOURNAROCKERS, OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES UNDER NINE (9) CU.YDS. OR LESS THAN THIRTEEN AND ONE-HALF (13 1/2) TONS, TANDEMS AND SEMI-TRAILER SERVICE TRUCKS, MIXER TRUCKS OVER THREE (3) CU.YDS. AND INCLUDING SIX AND ONE-HALF (6 1/2) CU.YDS., FORK LIFT, FOUR (4) WHEEL A- FRAME TRUCKS WHEN USED FOR TRANSPORTATION PURPOSES, FOUR (4) WHEEL WINCH TRUCKS, PAVEMENT BREAKERS, BATCH TRUCKS-WET OR DRY- OVER 2 UP TO AND INCLUDING 4-""34-E"" BATCHES TWO (2) MEN OIL DISTRIBUTORS, FORK-LIFT UNDER FOUR (4) TON AND VACUUM TRUCKS. (LA PORTE COUNTY) A: $37.90 PER DAY & 460.00 PER WEEK | $33.17 | 0.00 | $33.17 | |
| TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN Building TEAM0135-004 (16) CU.YDS. OR TWENTY-FOUR (24) TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNAROCKERS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES, POLE TRAILERS OVER SIX (6) WHEELS, WATER PULLS, LOW-BOY TRAILERS TANDEM AXLES, QUAD AXLE OR MORE NO-WEIGHT LIMITATION, DIESEL AND/OR HEAVY EQUIPMENT MECHANICS. (LA PORTE COUNTY) A: $37.90 PER DAY & 460.00 PER WEEK | $33.52 | 0.00 | $33.52 | |
| TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 5 MECHANIC FURNISHING HIS OWN TOOLS Building TEAM0135-004 (LA PORTE COUNTY) A: $37.90 PER DAY & 460.00 PER WEEK | $34.02 | 0.00 | $34.02 | |
| TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 SINGLE/BATCHES AXLE STRAIGHT TRUCKS; BATCH TRUCKS, WET OR DRY 3 Building TEAM0135-011 (34E) AXLE OR LESS; SINGLE AXLE GREASE AND MAINTENANCE TRUCK (LAPORTE & ST. JOSEPH COUNTIES) | $34.69 | $20.51 | $55.20 | |
| TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 SINGLE AXLE FUEL AND WATER TRUCKS Building TEAM0135-011 (LAPORTE & ST. JOSEPH COUNTIES) | $34.74 | $20.51 | $55.25 | |
| TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 TANDEM AXLE FUEL TRUCKS; TANDEM AXLE WATER TRUCKS; BUTUMINOUS DISTRIBUTORS Building TEAM0135-011 (TWO-MAN) (LAPORTE & ST. JOSEPH COUNTIES) | $34.84 | $20.51 | $55.35 | |
| TRUCK DRIVER: GROUP11 HELPERS; GREASERS; TIRE MEN; BATCH BOARD TENDERS; WAREHOUSEMAN LAPORTE & ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION Building TEAM0135-011 | $35.09 | $20.51 | $55.60 | |
| TRUCK DRIVER: GROUP12 ACEY WAGON Building TEAM0135-011 (OVER 3 BUCKETS); QUAD AXLE TRUCKS; ARTICULATING DUMP LAPORTE & ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION | $35.19 | $20.51 | $55.70 | |
| TRUCK DRIVER:GROUP 10 PICK-UP TRUCKS LAPORTE & ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION Building TEAM0135-011 | $34.54 | $20.51 | $55.05 |
No trade rates match your search and filter selection.
Building, Heavy, Highway
Applies to
La Porte, Lake, Porter, St Joseph
Residential
Applies to
Elkhart, La Porte, St Joseph