| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0027-005 (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) | $45.60 | $35.47 | $81.07 | |
| ASBESTOS WORKERS/INSULATOR Residential ASBE0027-001 (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS.) | $45.60 | $35.47 | $81.07 | |
| BOILERMAKER Residential BOIL0083-001 | $48.00 | $31.08 | $79.08 | |
| BRICKLAYER Residential BRKS0015-001 | $29.93 | $10.75 | $40.68 | |
| BRICKLAYER Building BRKS0015-012 | $43.57 | $23.02 | $66.59 | |
| CARPENTER Residential CARP4088-004 | $35.72 | $22.40 | $58.12 | |
| CARPENTER Building CARP0315-004 (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FLOOR LAYING CARPET) | $44.63 | $22.40 | $67.03 | |
| CARPENTER Highway CARP0315-006 | $43.28 | $21.25 | $64.53 | |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) Building CARP0315-003 | $43.28 | $21.25 | $64.53 | |
| CARPENTER (DRYWALL HANGING ONLY) Building SUKS2015-021 | $30.00 | $1.62 | $31.62 | |
| CARPENTER (FLOOR LAYING-CARPET ONLY) Building CARP1181-001 | $40.94 | $21.25 | $62.19 | |
| CEMENT MASON/CONCRETE FINISHER Residential PLAS0518-005 | $40.13 | $20.50 | $60.63 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0518-009 | $40.13 | $20.50 | $60.63 | |
| CEMENT MASON/CONCRETE FINISHER Highway PLAS0518-004 | $39.06 | $18.71 | $57.77 | |
| ELECTRICIAN Residential ELEC0124-006 | $48.23 | $25.35 | $73.58 | |
| ELECTRICIAN Highway SUKS2019-079 | $29.93 | $14.14 | $44.07 | |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) Building ELEC0124-011 | $51.01 | $26.25 | $77.26 | |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) Building ELEC0124-010 | $37.61 | $22.60 | $60.21 | |
| FLOOR LAYER: CARPET Residential PAIN1179-002 | $31.05 | $13.25 | $44.30 | |
| GLAZIER Residential PAIN0558-001 | $36.95 | $15.01 | $51.96 | |
| GLAZIER Building PAIN0558-006 | $39.32 | $22.34 | $61.66 | |
| HAZARDOUS MATERIAL HANDLER Residential ASBE0027-003 (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $45.60 | $35.47 | $81.07 | |
| IRONWORKER Residential IRON0010-008 | $39.00 | $34.25 | $73.25 | |
| IRONWORKER (REINFORCING AND STRUCTURAL) Highway IRON0010-015 | $39.00 | $34.25 | $73.25 | |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL Building IRON0010-032 | $39.00 | $34.25 | $73.25 | |
| LABORER Residential LABO1290-005 | $18.70 | $11.01 | $29.71 | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR Highway LABO1290-002 | $37.45 | $15.87 | $53.32 | |
| LABORER: COMMON OR GENERAL Building LABO1290-012 | $31.60 | $16.95 | $48.55 | |
| LABORER: COMMON OR GENERAL Highway SUKS2019-079 | $27.81 | $14.30 | $42.11 | |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) Building SUKS2015-021 | $31.51 | $11.60 | $43.11 | |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) Highway LABO0663-017 | $37.45 | $15.87 | $53.32 | |
| LABORER: FLAGGER Highway SUKS2019-079 | $13.20 | 0.00 | $13.20 | |
| LABORER: FORM WORK ONLY Highway SUKS2019-079 | $30.21 | $14.57 | $44.78 | |
| LABORER: LANDSCAPE Building SUKS2015-021 | $12.48 | 0.00 | $12.48 | |
| LABORER: MASON TENDER - BRICK Building LABO1290-018 | $32.25 | $16.95 | $49.20 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Building SUKS2015-021 | $17.86 | $1.01 | $18.87 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Highway SUKS2019-079 | $29.75 | $12.83 | $42.58 | |
| LABORERS: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Building LABO1290-011 | $31.99 | $16.03 | $48.02 | |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR Highway SUKS2019-079 | $30.67 | $14.36 | $45.03 | |
| LINE CONSTRUCTION: GROUNDMAN Highway SUKS2019-079 | $24.92 | $12.15 | $37.07 | |
| LINE CONSTRUCTION: LINEMAN Highway SUKS2019-079 | $41.52 | $17.26 | $58.78 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway SUKS2019-079 | $34.88 | $15.40 | $50.28 | |
| OPERATOR: BULLDOZER Building SUKS2015-021 | $33.12 | $13.96 | $47.08 | |
| OPERATOR: BULLDOZER Highway SUKS2019-079 | $28.15 | $11.65 | $39.80 | |
| OPERATOR: CONCRETE FINISHING MACHINE Highway SUKS2019-079 | $24.26 | 0.00 | $24.26 | |
| OPERATOR: CONCRETE SAW Highway SUKS2019-079 | $33.87 | $15.16 | $49.03 | |
| OPERATOR: CRANE Highway SUKS2019-079 | $30.38 | $11.08 | $41.46 | |
| OPERATOR: GRADER/BLADE Highway SUKS2019-079 | $29.66 | $12.55 | $42.21 | |
| OPERATOR: LOADER Building SUKS2015-021 | $30.35 | $12.04 | $42.39 | |
| OPERATOR: MATERIAL TRANSFER VEHICLE Highway SUKS2019-079 | $14.65 | 0.00 | $14.65 | |
| OPERATOR: MECHANIC Highway SUKS2019-079 | $32.25 | $15.31 | $47.56 | |
| OPERATOR: ROLLER Building SUKS2015-021 | $32.68 | $13.57 | $46.25 | |
| OPERATOR: ROTO MILL GROUNDMAN Highway SUKS2019-079 | $18.43 | 0.00 | $18.43 | |
| OPERATOR: SCRAPER Highway SUKS2019-079 | $17.67 | 0.00 | $17.67 | |
| OPERATOR: SCREED Highway SUKS2019-079 | $17.38 | $3.52 | $20.90 | |
| OPERATOR: STRIPING MACHINE Highway SUKS2019-079 | $27.27 | $12.25 | $39.52 | |
| OPERATOR: TRACTOR Highway SUKS2019-079 | $24.28 | 0.00 | $24.28 | |
| PAINTER: BRUSH, ROLLER, AND SPRAY Building PAIN2012-008 | $36.18 | $19.97 | $56.15 | |
| PAINTER: DRYWALL FINISHING/TAPING Building PAIN2012-010 | $36.18 | $19.97 | $56.15 | |
| PAINTERS: BRUSH, AND ROLLER Residential PAIN0003-005 | $21.10 | $12.50 | $33.60 | |
| PAINTERS: DRYWALL FINISHER/TAPER Residential PAIN0003-005 | $21.10 | $12.50 | $33.60 | |
| PAINTERS: SPRAY Residential PAIN0003-005 | $21.10 | $12.50 | $33.60 | |
| PIPEFITTER Residential PLUM0533-002 | $55.56 | $25.80 | $81.36 | |
| PIPEFITTER Building PLUM0533-013 (INCLUDING HVAC PIPE, UNIT, AND INSTALLATION OF HVAC ELECTRICIAL/TEMPERATURE CONTROLS) | $55.56 | $25.80 | $81.36 | |
| PLASTERER Residential PLAS0518-027 | $37.92 | $18.83 | $56.75 | |
| PLASTERER Building SUKS2015-021 | $29.85 | $13.29 | $43.14 | |
| PLUMBER Residential PLUM0008-006 | $54.28 | $23.79 | $78.07 | |
| PLUMBER Building PLUM0008-020 | $54.28 | $23.79 | $78.07 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building ENGI0101-042 | $45.48 | $22.42 | $67.90 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway ENGI0101-026 | $40.17 | $22.29 | $62.46 | |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER Building ENGI0101-042 | $45.48 | $22.42 | $67.90 | |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER Highway ENGI0101-026 | $40.17 | $22.29 | $62.46 | |
| POWER EQUIPMENT OPERATOR: CRANE Building ENGI0101-042 | $45.89 | $22.42 | $68.31 | |
| POWER EQUIPMENT OPERATOR: FORKLIFT Building ENGI0101-042 | $44.14 | $22.42 | $66.56 | |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE Building ENGI0101-042 | $45.48 | $22.42 | $67.90 | |
| POWER EQUIPMENT OPERATOR: LOADER Highway ENGI0101-026 | $40.17 | $22.29 | $62.46 | |
| POWER EQUIPMENT OPERATOR: OILER Building ENGI0101-042 | $39.93 | $22.42 | $62.35 | |
| POWER EQUIPMENT OPERATOR: PAVER Building ENGI0101-042 (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 | $67.90 | |
| POWER EQUIPMENT OPERATOR: PAVER Highway ENGI0101-026 (ASPHALT, AGGREGATE, AND CONCRETE) | $40.17 | $22.29 | $62.46 | |
| POWER EQUIPMENT OPERATOR: ROLLER Highway ENGI0101-026 | $40.17 | $22.29 | $62.46 | |
| POWER EQUIPMENT OPERATOR: ROTO MILL Highway ENGI0101-026 | $40.17 | $22.29 | $62.46 | |
| POWER EQUIPMENT OPERATORS: GROUP 3 BOILERS - 1; CHIP SPREADER Residential ENGI0101-020 (FRONT MAN); CHURN DRILL OPERATOR; COMPRESSOR MAINTENANCE OPERATOR - 1; CONCRETE SAWS, SELF-PROPELLED; CONVEYOR OPERATOR; DISTRIBUTOR OPERATOR; FINISHING MACHINE OPERATOR; FIREMAN, RIG; FLOAT OPERATOR; FORM GRADER OPERATOR; PUMP; PUMP MAINTENANCE OPERATOR, OTHER THAN DREDGE; ROLLER OPERATOR, OTHER THAN HIGH TYPE ASPHALT; SCREENING AND WASHING PLANT OPERATOR; SELF-PROPELLED STREET BROOM OR SWEEPER; SIPHONS AND JETS; SUB-GRADING MACHINE OPERATOR; TANK CAR HEATER OPERATOR - COMBINATION BOILER AND BOOSTER; TRACTOR, 50 H.P. OR LESS, WITHOUT ATTACHMENTS; VIBRATING MACHINE OPERATOR, NOT HAND; WELDING MACHINE MAINTENANCE OPERATOR - 1 | $44.14 | $22.42 | $66.56 | |
| POWER EQUIPMENT OPERATORS: GROUP 4: OILERS Residential ENGI0101-020 | $39.93 | $22.42 | $62.35 | |
| POWER EQUIPMENT OPERATORS: GROUP 4: OILERS DRIVER Residential ENGI0101-020 | $40.73 | $22.42 | $63.15 | |
| ROOFER Residential ROOF0020-006 | $38.45 | $22.29 | $60.74 | |
| ROOFER Building ROOF0020-021 | $38.45 | $22.29 | $60.74 | |
| SHEET METAL WORKER Residential SHEE0002-006 | $52.18 | $27.15 | $79.33 | |
| SHEET METAL WORKER Building SHEE0002-012 (EXCLUDES HVAC DUCT INSTALLATION) | $52.18 | $27.15 | $79.33 | |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Building SHEE0002-011 | $52.18 | $27.15 | $79.33 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SUKS2015-021 | $26.68 | $11.61 | $38.29 | |
| TILE FINISHER Building BRKS0015-014 | $20.74 | $1.46 | $22.20 | |
| TILE SETTER Building BRKS0015-011 | $42.73 | $18.39 | $61.12 | |
| TRAFFIC CONTROL: SERVICE DRIVER Highway SUKS2019-079 | $20.00 | $12.49 | $32.49 | |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION Highway SUKS2019-079 (GROUNDMAN) | $17.10 | 0.00 | $17.10 | |
| TRUCK DRIVER: DUMP (ALL TYPES) Building TEAM0541-012 | $39.89 | $15.85 | $55.74 | |
| TRUCK DRIVER: DUMP AND TANDEM Highway SUKS2019-079 | $29.04 | $12.45 | $41.49 | |
| TRUCK DRIVER: FLATBED AND LOWBOY Highway SUKS2019-079 | $28.41 | $14.05 | $42.46 | |
| TRUCK DRIVER: LOWBOY TRUCK Building TEAM0541-010 | $39.89 | $15.85 | $55.74 | |
| TRUCK DRIVER: OFF ROAD TRUCK Highway SUKS2019-079 | $19.06 | 0.00 | $19.06 | |
| TRUCK DRIVER: SEMI-TRAILER TRUCK Building TEAM0541-011 | $39.89 | $15.85 | $55.74 | |
| TRUCK DRIVER: WATER TRUCK Highway TEAM0541-013 | $38.04 | $15.85 | $53.89 | |
| TRUCK DRIVERS: GROUP 2 DOUBLE BOTTOM UNITS Residential TEAM0541-006 (20 TONS CAPACITY AND OVER); FORK TRUCKS; HEAVY EXCAVATING (DUMPSTERS, ETC.); HEAVY HAULING, A-FRAME AND WINCH FORK TRUCKS; HYDRAULICALLY OPERATED AERIAL LIFT; HYDRO LIFT TRUCKS; STRADDLE TRUCKS; WHEEL TRACTORS. A. PAID VACATION: AN EMPLOYEE WHO HAS WORKED 1300 HRS. OR MORE FOR AN EMPLOYER DURING THE LAST FULL YEAR SHALL RECEIVE 1 WEEK VACATION WITH PAY FOR THAT YEAR | $39.89 | $15.85 | $55.74 |
No trade rates match your search and filter selection.
Residential
Applies to
Johnson, Wyandotte
Building