KS20260006
rev 1Residential
23 trades
Applies to
Johnson, Wyandotte
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Wyandotte County, Kansas are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0027-005 (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) | $45.60 | $35.47 | $81.07 | |
| ASBESTOS WORKERS/INSULATOR Residential ASBE0027-001 (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS.) | $45.60 | $35.47 | $81.07 | |
| BOILERMAKER Residential BOIL0083-001 | $48.00 | $31.08 | $79.08 | |
| BRICKLAYER Residential BRKS0015-001 | $29.93 | $10.75 | $40.68 | |
| BRICKLAYER Building BRKS0015-012 | $43.57 | $23.02 | $66.59 | |
| CARPENTER Residential CARP4088-004 | $35.72 | $22.40 | $58.12 | |
| CARPENTER Building CARP0315-004 (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FLOOR LAYING CARPET) | $44.63 | $22.40 | $67.03 | |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) Building CARP0315-003 | $43.28 | $21.25 | $64.53 | |
| CARPENTER (DRYWALL HANGING ONLY) Building SUKS2015-029 | $30.00 | $1.62 | $31.62 | |
| CARPENTER (FLOOR LAYING-CARPET ONLY) Building CARP1181-001 | $40.94 | $21.25 | $62.19 | |
| CEMENT MASON/CONCRETE FINISHER Residential PLAS0518-005 | $40.13 | $20.50 | $60.63 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0518-009 | $40.13 | $20.50 | $60.63 | |
| ELECTRICIAN Residential ELEC0124-006 | $48.23 | $25.35 | $73.58 | |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) Building ELEC0124-011 | $51.01 | $26.25 | $77.26 | |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) Building ELEC0124-010 | $37.61 | $22.60 | $60.21 | |
| FLOOR LAYER: CARPET Residential PAIN1179-002 | $31.05 | $13.25 | $44.30 | |
| GLAZIER Residential PAIN0558-001 | $36.95 | $15.01 | $51.96 | |
| GLAZIER Building PAIN0558-006 | $39.32 | $22.34 | $61.66 | |
| HAZARDOUS MATERIAL HANDLER Residential ASBE0027-003 (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $45.60 | $35.47 | $81.07 | |
| IRONWORKER Residential IRON0010-008 | $39.00 | $34.25 | $73.25 | |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL Building IRON0010-032 | $39.00 | $34.25 | $73.25 | |
| LABORER Residential LABO1290-005 | $18.70 | $11.01 | $29.71 | |
| LABORER: COMMON OR GENERAL Building LABO1290-012 | $31.60 | $16.95 | $48.55 | |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) Building SUKS2015-029 | $31.51 | $11.60 | $43.11 | |
| LABORER: LANDSCAPE Building SUKS2015-029 | $12.48 | 0.00 | $12.48 | |
| LABORER: MASON TENDER - BRICK (FRANKLIN COUNTIES) Building LABO1290-008 | $24.22 | $11.38 | $35.60 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Building SUKS2015-029 | $17.86 | $1.01 | $18.87 | |
| LABORERS: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Building LABO1290-011 | $31.99 | $16.03 | $48.02 | |
| OPERATOR: BULLDOZER Building SUKS2015-029 | $33.12 | $13.96 | $47.08 | |
| OPERATOR: LOADER Building SUKS2015-029 | $30.35 | $12.04 | $42.39 | |
| OPERATOR: ROLLER Building SUKS2015-029 | $32.68 | $13.57 | $46.25 | |
| PAINTER: BRUSH, ROLLER, AND SPRAY Building PAIN2012-008 | $36.18 | $19.97 | $56.15 | |
| PAINTER: DRYWALL FINISHING/TAPING Building PAIN2012-010 | $36.18 | $19.97 | $56.15 | |
| PAINTERS: BRUSH, AND ROLLER Residential PAIN0003-005 | $21.10 | $12.50 | $33.60 | |
| PAINTERS: DRYWALL FINISHER/TAPER Residential PAIN0003-005 | $21.10 | $12.50 | $33.60 | |
| PAINTERS: SPRAY Residential PAIN0003-005 | $21.10 | $12.50 | $33.60 | |
| PIPEFITTER Residential PLUM0533-002 | $55.56 | $25.80 | $81.36 | |
| PIPEFITTER Building PLUM0533-013 (INCLUDING HVAC PIPE, UNIT, AND INSTALLATION OF HVAC ELECTRICIAL/TEMPERATURE CONTROLS) | $55.56 | $25.80 | $81.36 | |
| PLASTERER Residential PLAS0518-027 | $37.92 | $18.83 | $56.75 | |
| PLASTERER Building SUKS2015-029 | $29.85 | $13.29 | $43.14 | |
| PLUMBER Residential PLUM0008-006 | $54.28 | $23.79 | $78.07 | |
| PLUMBER Building PLUM0008-020 | $54.28 | $23.79 | $78.07 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building ENGI0101-042 | $45.48 | $22.42 | $67.90 | |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER Building ENGI0101-042 | $45.48 | $22.42 | $67.90 | |
| POWER EQUIPMENT OPERATOR: CRANE Building ENGI0101-042 | $45.89 | $22.42 | $68.31 | |
| POWER EQUIPMENT OPERATOR: FORKLIFT Building ENGI0101-042 | $44.14 | $22.42 | $66.56 | |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE Building ENGI0101-042 | $45.48 | $22.42 | $67.90 | |
| POWER EQUIPMENT OPERATOR: OILER Building ENGI0101-042 | $39.93 | $22.42 | $62.35 | |
| POWER EQUIPMENT OPERATOR: PAVER Building ENGI0101-042 (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 | $67.90 | |
| POWER EQUIPMENT OPERATORS: GROUP 3 BOILERS - 1; CHIP SPREADER Residential ENGI0101-020 (FRONT MAN); CHURN DRILL OPERATOR; COMPRESSOR MAINTENANCE OPERATOR - 1; CONCRETE SAWS, SELF-PROPELLED; CONVEYOR OPERATOR; DISTRIBUTOR OPERATOR; FINISHING MACHINE OPERATOR; FIREMAN, RIG; FLOAT OPERATOR; FORM GRADER OPERATOR; PUMP; PUMP MAINTENANCE OPERATOR, OTHER THAN DREDGE; ROLLER OPERATOR, OTHER THAN HIGH TYPE ASPHALT; SCREENING AND WASHING PLANT OPERATOR; SELF-PROPELLED STREET BROOM OR SWEEPER; SIPHONS AND JETS; SUB-GRADING MACHINE OPERATOR; TANK CAR HEATER OPERATOR - COMBINATION BOILER AND BOOSTER; TRACTOR, 50 H.P. OR LESS, WITHOUT ATTACHMENTS; VIBRATING MACHINE OPERATOR, NOT HAND; WELDING MACHINE MAINTENANCE OPERATOR - 1 | $44.14 | $22.42 | $66.56 | |
| POWER EQUIPMENT OPERATORS: GROUP 4: OILERS Residential ENGI0101-020 | $39.93 | $22.42 | $62.35 | |
| POWER EQUIPMENT OPERATORS: GROUP 4: OILERS DRIVER Residential ENGI0101-020 | $40.73 | $22.42 | $63.15 | |
| ROOFER Residential ROOF0020-006 | $38.45 | $22.29 | $60.74 | |
| ROOFER Building ROOF0020-021 | $38.45 | $22.29 | $60.74 | |
| SHEET METAL WORKER Residential SHEE0002-006 | $52.18 | $27.15 | $79.33 | |
| SHEET METAL WORKER Building SHEE0002-012 (EXCLUDES HVAC DUCT INSTALLATION) | $52.18 | $27.15 | $79.33 | |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Building SHEE0002-011 | $52.18 | $27.15 | $79.33 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SUKS2015-029 | $26.68 | $11.61 | $38.29 | |
| TILE FINISHER Building BRKS0015-014 | $20.74 | $1.46 | $22.20 | |
| TILE SETTER Building BRKS0015-011 | $42.73 | $18.39 | $61.12 | |
| TRUCK DRIVER: DUMP (ALL TYPES) Building SUKS2015-029 | $27.29 | $10.71 | $38.00 | |
| TRUCK DRIVER: LOWBOY TRUCK Building TEAM0541-010 | $39.89 | $15.85 | $55.74 | |
| TRUCK DRIVER: SEMI-TRAILER TRUCK Building TEAM0541-011 | $39.89 | $15.85 | $55.74 | |
| TRUCK DRIVERS: GROUP 2 DOUBLE BOTTOM UNITS Residential TEAM0541-006 (20 TONS CAPACITY AND OVER); FORK TRUCKS; HEAVY EXCAVATING (DUMPSTERS, ETC.); HEAVY HAULING, A-FRAME AND WINCH FORK TRUCKS; HYDRAULICALLY OPERATED AERIAL LIFT; HYDRO LIFT TRUCKS; STRADDLE TRUCKS; WHEEL TRACTORS. A. PAID VACATION: AN EMPLOYEE WHO HAS WORKED 1300 HRS. OR MORE FOR AN EMPLOYER DURING THE LAST FULL YEAR SHALL RECEIVE 1 WEEK VACATION WITH PAY FOR THAT YEAR | $39.89 | $15.85 | $55.74 |
No trade rates match your search and filter selection.
Residential
Applies to
Johnson, Wyandotte
Building
Applies to
Franklin, Miami, Wyandotte