KY20260003
rev 0Residential
0 trades
Applies to
Adair, Allen, Barren, Bell, Butler, Casey, Clay, Clinton, Cumberland, Estill +17 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0051-001 | $30.00 | $20.89 | $50.89 |
| BOILERMAKER Building BOIL0040-001 | $43.85 | $28.44 | $72.29 |
| BOILERMAKER Highway SUKY2015-047 | $24.65 | $12.94 | $37.59 |
| BRICKLAYER Building SUKY2015-048 | $23.53 | $11.62 | $35.15 |
| BRICKLAYER Bricklayer Highway SUKY2015-047 | $22.90 | $8.50 | $31.40 |
| Bridges Highway SUKY2015-047 | $23.92 | $10.07 | $33.99 |
| CARPENTER Residential SUKY2010-037 | $13.20 | 0.00 | $13.20 |
| CARPENTER Building CARP1650-003 (Acoustical Ceiling Installation, Drywall Hanging, and Metal Stud Installation Only) | $37.04 | $26.57 | $63.61 |
| CARPENTER (Form Work Only) Building SUKY2015-048 | $19.97 | $9.54 | $29.51 |
| CARPENTER Carpenter Highway SUKY2015-047 | $24.90 | $14.50 | $39.40 |
| CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation Building SUKY2015-048 | $22.53 | $10.25 | $32.78 |
| CEMENT MASON Highway SUKY2015-047 | $21.25 | $8.50 | $29.75 |
| CEMENT MASON/CONCRETE FINISHER Residential SUKY2010-037 | $10.50 | 0.00 | $10.50 |
| CEMENT MASON/CONCRETE FINISHER Building SUKY2015-048 | $20.92 | $10.90 | $31.82 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUKY2011-015 | $21.51 | $10.00 | $31.51 |
| Concrete Saw Heavy LABO0189-015 (Hand Held/Walk Behind), Pipelayers & Vibrating Plate | $27.12 | $19.66 | $46.78 |
| ELECTRICIAN Residential SUKY2010-037 | $15.17 | 0.00 | $15.17 |
| ELECTRICIAN Building SUKY2015-048 | $29.53 | $12.94 | $42.47 |
| ELECTRICIAN Heavy SUKY2011-015 | $32.35 | $2.18 | $34.53 |
| ELECTRICIAN Electrician Highway SUKY2015-047 | $29.36 | $10.55 | $39.91 |
| Equipment Operator Highway SUKY2015-047 | $26.90 | $10.31 | $37.21 |
| Groundsman Highway SUKY2015-047 | $17.79 | $8.51 | $26.30 |
| GROUP 1: Aging and Curing of Concrete Highway SUKY2015-047 (Any Mode or Method), Asbestos Abatement Worker, Asphalt Plant Laborers, Asphalt Laborers, Dredging Laborers, Drill Tender, Environmental Laborer - Nuclear, Radiation, Toxic and Hazardous Waste - Level D, Flagmen, Grade Checkers, All Hand Digging and Hand Back Filling, Highway Marker Placers, Landscaping Laborers, and Grouters, Right of Way Laborers, Sign, Guard Rail and Fence Installers (All Types), Signalmen, Sound Barrier Spotters and Dumpers, Wrecking of Concrete Forms, General Cleanup GROUP 2: Batter Board Men (Sanitary and Storm Sewer), Burner and Welder, Bushammers, Chain Saw Operator, Concrete Saw Operators, Deckhand Scow Man, Dry Cement Handlers, Environmental Laborers - Nuclear, Radiation, Toxic and Hazardous Waste - Level C, Forklift Operators for Masonry, Form Setters, Green Concrete Cutting, Hand Operated Grouter and Grinder Machine Operator, Jack Hammers, Lead Paint Abatement, Pavement Breakers, Paving Joint Machine, Pipe behind Trenchers, Sand Blasters, Concrete Chippers, Surface Grinders, Vibrator Operators, Wagon Drillers GROUP 3: Air Track Driller (All Types), Asphalt Luteman and Paved Ditches, Screw Operators, Tunnel Laborers (Free Air), Water Blasters GROUP 4: Caisson Workers (Free Air), Cement Finishers, Environmental Laborer - Nuclear, Radiation, Toxic and Hazardous Waste - Level A and B, miners and Drillers (Free Air), Tunnel Blasters, and Tunnel Mockers (Free Air), Directional and Horizontal Boring, Air Track Drillers (All if Laborer is Utilized PAINTER All Excluding Bridges | $19.92 | $9.57 | $29.49 |
| Group 2 Highway SUKY2015-047 | $22.05 | $12.36 | $34.41 |
| GROUP 2 Heavy ENGI0181-010 | $38.69 | $9.50 | $48.19 |
| Group 3 Highway SUKY2015-047 | $22.10 | $12.36 | $34.46 |
| Group 4 Highway SUKY2015-047 | $22.70 | $12.36 | $35.06 |
| GROUP 4 Heavy ENGI0181-010 | $38.37 | $9.50 | $47.87 |
| HVAC MECHANIC: HVAC ELECTRICAL/ TEMPERATURE CONTROLS INSTALLATION Residential SUKY2010-037 | $16.00 | 0.00 | $16.00 |
| IRONWORKER Heavy IRON0782-010 (Reinforcing & Structural) Projects over $20,000,000.00 | $37.47 | $26.49 | $63.96 |
| IRONWORKER, REINFORCING Building IRON0782-015 | $35.63 | $26.49 | $62.12 |
| IRONWORKER, STRUCTURAL Building IRON0070-004 | $36.17 | $25.80 | $61.97 |
| LABORER Building LABO0189-025 (Carpenter Tender, Grade Checker) | $28.13 | $17.38 | $45.51 |
| LABORER Building LABO0189-027 (Pipelayer, Tamper - Hand Held) | $28.53 | $17.38 | $45.91 |
| LABORER (Grouting) Building LABO0189-029 | $28.73 | $17.38 | $46.11 |
| LABORER Backfiller, Carpenter Tender, Common or General, Concrete Worker, Dumpman & Grade Checker Heavy LABO0189-015 | $26.87 | $19.66 | $46.53 |
| LABORER Form Worker Heavy LABO0561-003 | $28.80 | $18.77 | $47.57 |
| LABORER Group 1 Highway SUKY2015-047 | $21.80 | $12.36 | $34.16 |
| LABORER: Common or General Residential SUKY2010-037 | $10.40 | 0.00 | $10.40 |
| LABORER: Common or General Building SUKY2015-048 | $20.67 | $7.65 | $28.32 |
| LABORER: Flagger Heavy SUKY2011-015 | $18.31 | $8.89 | $27.20 |
| LABORER: Mason Tender - Brick Building SUKY2015-048 | $22.36 | $10.76 | $33.12 |
| LABORER: Mason Tender - Cement/Concrete Building SUKY2015-048 | $23.17 | $10.05 | $33.22 |
| Lineman Highway SUKY2015-047 | $30.09 | $10.94 | $41.03 |
| MILLWRIGHT Building CARP1076-001 | $35.54 | $29.13 | $64.67 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUKY2015-048 | $24.55 | $10.61 | $35.16 |
| OPERATOR: Backhoe/Excavator/Trackhoe Heavy SUKY2011-015 | $26.42 | $12.70 | $39.12 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUKY2015-048 | $24.64 | $13.00 | $37.64 |
| OPERATOR: OPERATOR: Bulldozer Heavy SUKY2011-015 | $29.96 | $13.00 | $42.96 |
| OPERATOR: OPERATOR: Grader/Blade Building SUKY2015-048 | $24.33 | $13.00 | $37.33 |
| OPERATOR: OPERATOR: Loader Heavy SUKY2011-015 | $25.35 | $13.00 | $38.35 |
| OPERATOR: PAINTER (Brush and Roller) Building SUKY2015-048 | $21.28 | $11.14 | $32.42 |
| OPERATOR: PLUMBER Building SUKY2015-048 | $30.36 | $13.62 | $43.98 |
| OPERATOR: ROOFER Building SUKY2015-048 | $22.31 | $7.41 | $29.72 |
| OPERATOR: SHEET METAL WORKER Building SUKY2015-048 (HVAC Duct Installation Only) | $27.74 | $13.20 | $40.94 |
| OPERATOR: TILE FINISHER Building SUKY2015-048 | $17.67 | $7.45 | $25.12 |
| OPERATOR: TILE SETTER Building SUKY2015-048 | $25.77 | $6.10 | $31.87 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUKY2015-048 | $17.07 | $6.25 | $23.32 |
| PAINTER Building PAIN1072-006 (Drywall Finishing/Taping and Spray Only) | $34.29 | $23.95 | $58.24 |
| PAINTER: Brush and Roller Residential SUKY2010-037 | $12.50 | 0.00 | $12.50 |
| Piledriver Highway SUKY2015-047 | $24.55 | $14.50 | $39.05 |
| PIPEFITTER Building PLUM0452-021 (Includes HVAC Pipe and Unit Installation) | $41.00 | $21.66 | $62.66 |
| PLUMBER Residential SUKY2010-037 | $22.04 | 0.00 | $22.04 |
| PLUMBER Highway SUKY2015-047 | $22.52 | $7.80 | $30.32 |
| POWER EQUIPMENT OPERATOR Building ENGI0181-084 (Oiler) | $34.99 | $19.60 | $54.59 |
| POWER EQUIPMENT OPERATOR Building ENGI0181-085 (Crane) | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR Building ENGI0181-086 (Forklift) | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR GROUP 1 Heavy ENGI0181-010 | $41.55 | $9.50 | $51.05 |
| POWER EQUIPMENT OPERATOR: Driver Highway SUKY2015-047 (3 Tons and Under), Tire Changer and Truck Mechanic Tender | $23.53 | $14.50 | $38.03 |
| POWER EQUIPMENT OPERATOR: Driver Highway SUKY2015-047 (Semi-Trailer or Pole Trailer), Driver (Dump Truck, Tandem Axle), Driver of Distributor | $23.40 | $14.50 | $37.90 |
| POWER EQUIPMENT OPERATOR: Driver on Mixer Trucks Highway SUKY2015-047 (All Types) | $23.45 | $14.50 | $37.95 |
| POWER EQUIPMENT OPERATOR: Driver on Pavement Breakers Highway SUKY2015-047 | $23.55 | $14.50 | $38.05 |
| POWER EQUIPMENT OPERATOR: Driver, Euclid and Other Heavy Earth Moving Equipment and Low Boy Highway SUKY2015-047 | $24.31 | $14.50 | $38.81 |
| POWER EQUIPMENT OPERATOR: Driver, Winch Truck and A- Frame when used in Transporting Materials Highway SUKY2015-047 | $23.30 | $14.50 | $37.80 |
| POWER EQUIPMENT OPERATOR: Greaser on Greasing Facilities Highway SUKY2015-047 | $24.40 | $14.50 | $38.90 |
| POWER EQUIPMENT OPERATOR: Group 1 Highway SUKY2015-047 | $29.95 | $14.40 | $44.35 |
| POWER EQUIPMENT OPERATOR: Group 2 Highway SUKY2015-047 | $29.95 | $14.40 | $44.35 |
| POWER EQUIPMENT OPERATOR: Group 3 Highway SUKY2015-047 | $27.26 | $14.40 | $41.66 |
| POWER EQUIPMENT OPERATOR: Group 4 Highway SUKY2015-047 | $26.96 | $14.40 | $41.36 |
| POWER EQUIPMENT OPERATOR: TRUCK DRIVER Driver Highway SUKY2015-047 (3 Tons and Over), Driver (Truck Mounted Rotary Drill) | $23.74 | $14.50 | $38.24 |
| POWER EQUIPMENT OPERATOR: Truck Mechanic Highway SUKY2015-047 | $23.50 | $14.50 | $38.00 |
| POWER EQUIPMENT OPERATOR: Truck Tender and Warehouseman Highway SUKY2015-047 | $23.20 | $14.50 | $37.70 |
| POWER EQUIPMENT OPERATOR: Way, Clamshell, Concrete Mixer Highway SUKY2015-047 (21 cu ft or over), Concrete Pump, Crane, Crusher Plant, Derrick, Derrick Boat, Ditching and Trenching Machine, Dragline, Dredge Engineer, Elevator (regardless of ownership when used for hoisting any building material), Elevating Grader and all types of Loaders, Hoe-type Scoop, Bulldozer, Mechanic, Orangepeel Bucket, Piledriver, Power Blade, Roller (Bituminous), Roller (Earth), Roller (Rock), Scarifier, Shovel, Tractor Shovel, Truck Crane, Well Point, Winch Truck, Push Dozer, Grout Pump, High Lift, Fork Lift (regardless of lift height), all types of Boom Cats, Truck, Concrete Paver, Grade-All, Hoist, Hyster, Material Valve Man, Rotary Drill, Power Generator, Mucking Machine, Rock Spreader attached to Equipment, Scoopmobile, KeCal Loader, Tower Cranes,(French, German and other types), Hydrocrane, Tugger, Backfiller Gurries, Self-propelled Compactor, Self-Contained Hydraulic Percussion Drill GROUP 2: All Air Compressors (200 cu ft/min or greater), Machine, Form Grader, Tractor (50 hp and over), Bull Float, Finish Machine, Outboard Motor Boat, Brakeman, Mechanic Tender, Whirly Oiler, Tract-air, Road Widening Trencher, Articulating Trucks GROUP 4: Bituminous Distributor, Cement Gun, Conveyor, Mud Jack, Paving Joint Machine, Pump, Tamping Machine, Tractor (under 50 hp), Vibrator, Oiler, Air Compressor (under 200 cu ft per minute), Concrete Saw, Burlap and Curing Machine, Hydro Seeder, Power Form Handling Equipment, Deckhand Oiler, Hydraulic Post Driver SHEET METAL WORKER | $20.40 | $7.80 | $28.20 |
| Projects under $20,000,000.00 Heavy IRON0782-010 | $35.63 | $26.49 | $62.12 |
| SHEET METAL WORKER Building SHEE0110-006 (Excludes HVAC Duct Installation) | $40.32 | $25.66 | $65.98 |
| SPRINKLER FITTER Building SFKY0669-002 | $44.15 | $26.08 | $70.23 |
| stacks, tanks, scaffolds, catwalks, radio and T.V. towers, structural steel Highway SUKY2015-047 (open, unprotected, unfloored raw steel), and bridges or similar hazardous locations where workmen are subject to fall, except where using JLG's and bucket trucks up to 75 feet: Add 25% to workman's base rate for 50 to 75 feet, and add 50% to workman's base rate for over 75 feet. IRONWORKER | $27.56 | $20.57 | $48.13 |
| Stone Mason Highway SUKY2015-047 | $21.50 | $8.50 | $30.00 |
No trade rates match your search and filter selection.
Residential
Applies to
Adair, Allen, Barren, Bell, Butler, Casey, Clay, Clinton, Cumberland, Estill +17 more
Building
Applies to
Anderson, Bath, Boyle, Estill, Fleming, Garrard, Harrison, Lewis, Lincoln, Menifee +6 more
Heavy
Applies to
Anderson, Bath, Boyle, Carroll, Estill, Fleming, Garrard, Lewis, Lincoln, Madison +10 more
Highway
Applies to
Adair, Barren, Bell, Breathitt, Casey, Clay, Clinton, Cumberland, Estill, Floyd +32 more