| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0046-002 | $30.24 | $18.54 | $48.78 |
| BOILERMAKER Building BOIL0040-001 | $43.85 | $28.44 | $72.29 |
| BOILERMAKER Highway SUKY2015-047 | $24.65 | $12.94 | $37.59 |
| BRICKLAYER Building SUKY2015-023 | $24.61 | $11.88 | $36.49 |
| BRICKLAYER Bricklayer Highway SUKY2015-047 | $22.90 | $8.50 | $31.40 |
| Bridges Highway SUKY2015-047 | $23.92 | $10.07 | $33.99 |
| CARPENTER Building CARP1650-010 (Excludes Acoustical Ceiling Installation, Drywall Hanging, and Metal Stud Installation) | $32.25 | $18.09 | $50.34 |
| CARPENTER (Form Work Only) Heavy CARP0064-007 | $33.89 | $24.06 | $57.95 |
| CARPENTER Carpenter Highway SUKY2015-047 | $24.90 | $14.50 | $39.40 |
| CEMENT MASON Highway SUKY2015-047 | $21.25 | $8.50 | $29.75 |
| CEMENT MASON/CONCRETE FINISHER Building SUKY2015-023 | $27.99 | 0.00 | $27.99 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUKY2011-014 | $21.60 | $10.35 | $31.95 |
| Concrete Worker Heavy LABO0189-014 | $26.87 | $19.66 | $46.53 |
| ELECTRICIAN Building ELEC0317-005 | $41.15 | $29.35 | $70.50 |
| ELECTRICIAN Heavy SUKY2011-014 | $32.35 | $2.18 | $34.53 |
| ELECTRICIAN Electrician Highway SUKY2015-047 | $29.36 | $10.55 | $39.91 |
| ELEVATOR MECHANIC Building ELEV0011-001 | $57.41 | $38.44 | $95.84 |
| Equipment Operator Highway SUKY2015-047 | $26.90 | $10.31 | $37.21 |
| Groundman Heavy ELEC0369-004 | $25.77 | $7.40 | $33.17 |
| Groundsman Highway SUKY2015-047 | $17.79 | $8.51 | $26.30 |
| GROUP 1: Aging and Curing of Concrete Highway SUKY2015-047 (Any Mode or Method), Asbestos Abatement Worker, Asphalt Plant Laborers, Asphalt Laborers, Dredging Laborers, Drill Tender, Environmental Laborer - Nuclear, Radiation, Toxic and Hazardous Waste - Level D, Flagmen, Grade Checkers, All Hand Digging and Hand Back Filling, Highway Marker Placers, Landscaping Laborers, and Grouters, Right of Way Laborers, Sign, Guard Rail and Fence Installers (All Types), Signalmen, Sound Barrier Spotters and Dumpers, Wrecking of Concrete Forms, General Cleanup GROUP 2: Batter Board Men (Sanitary and Storm Sewer), Burner and Welder, Bushammers, Chain Saw Operator, Concrete Saw Operators, Deckhand Scow Man, Dry Cement Handlers, Environmental Laborers - Nuclear, Radiation, Toxic and Hazardous Waste - Level C, Forklift Operators for Masonry, Form Setters, Green Concrete Cutting, Hand Operated Grouter and Grinder Machine Operator, Jack Hammers, Lead Paint Abatement, Pavement Breakers, Paving Joint Machine, Pipe behind Trenchers, Sand Blasters, Concrete Chippers, Surface Grinders, Vibrator Operators, Wagon Drillers GROUP 3: Air Track Driller (All Types), Asphalt Luteman and Paved Ditches, Screw Operators, Tunnel Laborers (Free Air), Water Blasters GROUP 4: Caisson Workers (Free Air), Cement Finishers, Environmental Laborer - Nuclear, Radiation, Toxic and Hazardous Waste - Level A and B, miners and Drillers (Free Air), Tunnel Blasters, and Tunnel Mockers (Free Air), Directional and Horizontal Boring, Air Track Drillers (All if Laborer is Utilized PAINTER All Excluding Bridges | $19.92 | $9.57 | $29.49 |
| Group 2 Highway SUKY2015-047 | $22.05 | $12.36 | $34.41 |
| GROUP 2 Heavy ENGI0181-010 | $38.69 | $9.50 | $48.19 |
| Group 3 Highway SUKY2015-047 | $22.10 | $12.36 | $34.46 |
| Group 4 Highway SUKY2015-047 | $22.70 | $12.36 | $35.06 |
| GROUP 4 Heavy ENGI0181-010 | $38.37 | $9.50 | $47.87 |
| IRONWORKER Heavy IRON0782-010 (Reinforcing & Structural) Projects over $20,000,000.00 | $37.47 | $26.49 | $63.96 |
| IRONWORKER, REINFORCING ZONE 1 Building IRON0769-005 | $39.70 | $29.59 | $69.29 |
| IRONWORKER, STRUCTURAL Building SUKY2015-023 | $22.31 | $15.40 | $37.71 |
| LABORER Building LABO0576-012 (Mason Tender - Cement/Concrete) | $26.89 | $13.32 | $40.21 |
| LABORER (Carpenter Tender) Building LABO0576-011 | $26.69 | $13.32 | $40.01 |
| LABORER (Mason Tender - Brick) Building LABO1392-004 | $28.16 | $17.55 | $45.71 |
| LABORER (Pipelayer) Building LABO0189-007 | $28.53 | $17.38 | $45.91 |
| LABORER Concrete Saw Heavy LABO0189-014 (Hand Held/Walk Behind) | $27.12 | $19.66 | $46.78 |
| LABORER Group 1 Highway SUKY2015-047 | $21.80 | $12.36 | $34.16 |
| LABORER: Common or General Building SUKY2015-023 | $16.97 | $6.11 | $23.08 |
| LABORER: Common or General Heavy SUKY2011-014 | $20.60 | $9.39 | $29.99 |
| LABORER: Flagger Heavy SUKY2011-014 | $18.31 | $8.89 | $27.20 |
| LABORER: Pipelayer Heavy SUKY2011-014 | $20.13 | $8.63 | $28.76 |
| LINE CONSTRUCTION Equipment Operator Heavy ELEC0369-004 | $39.15 | $7.40 | $46.55 |
| Lineman Heavy ELEC0369-004 | $43.84 | $7.40 | $51.24 |
| Lineman Highway SUKY2015-047 | $30.09 | $10.94 | $41.03 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUKY2015-023 | $21.11 | $13.00 | $34.11 |
| OPERATOR: Backhoe/Excavator/Trackhoe Heavy SUKY2011-014 | $23.60 | $12.65 | $36.25 |
| OPERATOR: OPERATOR: Bulldozer Heavy SUKY2011-014 | $21.72 | $7.45 | $29.17 |
| OPERATOR: OPERATOR: Grader/Blade Building SUKY2015-023 | $24.33 | $13.00 | $37.33 |
| OPERATOR: OPERATOR: Loader Heavy SUKY2011-014 | $30.35 | 0.00 | $30.35 |
| OPERATOR: PAINTER (Brush and Roller) Building SUKY2015-023 | $18.20 | $6.43 | $24.63 |
| OPERATOR: PLUMBER Building SUKY2015-023 | $33.41 | $16.67 | $50.08 |
| OPERATOR: ROOFER Building SUKY2015-023 | $22.31 | $7.41 | $29.72 |
| OPERATOR: SHEET METAL WORKER Building SUKY2015-023 (HVAC Duct Installation Only) | $25.91 | $8.06 | $33.97 |
| OPERATOR: TILE FINISHER Building SUKY2015-023 | $17.67 | $7.45 | $25.12 |
| OPERATOR: TILE SETTER Building SUKY2015-023 | $25.77 | $6.10 | $31.87 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUKY2015-023 | $17.07 | $6.25 | $23.32 |
| PAINTER (Spray Only) Building PAIN1072-005 | $34.29 | $23.95 | $58.24 |
| Piledriver Highway SUKY2015-047 | $24.55 | $14.50 | $39.05 |
| PIPEFITTER Building PLUM0452-014 | $41.00 | $21.66 | $62.66 |
| PLUMBER Highway SUKY2015-047 | $22.52 | $7.80 | $30.32 |
| POWER EQUIPMENT OPERATOR Building ENGI0181-083 (Bobcat/Skid Steer/Skid Loader) | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR Building ENGI0181-084 (Oiler) | $34.99 | $19.60 | $54.59 |
| POWER EQUIPMENT OPERATOR Building ENGI0181-085 (Crane) | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR Building ENGI0181-086 (Forklift) | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR Building ENGI0181-092 (Bulldozer) | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR GROUP 1 Heavy ENGI0181-010 | $41.55 | $9.50 | $51.05 |
| POWER EQUIPMENT OPERATOR: Driver Highway SUKY2015-047 (3 Tons and Under), Tire Changer and Truck Mechanic Tender | $23.53 | $14.50 | $38.03 |
| POWER EQUIPMENT OPERATOR: Driver Highway SUKY2015-047 (Semi-Trailer or Pole Trailer), Driver (Dump Truck, Tandem Axle), Driver of Distributor | $23.40 | $14.50 | $37.90 |
| POWER EQUIPMENT OPERATOR: Driver on Mixer Trucks Highway SUKY2015-047 (All Types) | $23.45 | $14.50 | $37.95 |
| POWER EQUIPMENT OPERATOR: Driver on Pavement Breakers Highway SUKY2015-047 | $23.55 | $14.50 | $38.05 |
| POWER EQUIPMENT OPERATOR: Driver, Euclid and Other Heavy Earth Moving Equipment and Low Boy Highway SUKY2015-047 | $24.31 | $14.50 | $38.81 |
| POWER EQUIPMENT OPERATOR: Driver, Winch Truck and A- Frame when used in Transporting Materials Highway SUKY2015-047 | $23.30 | $14.50 | $37.80 |
| POWER EQUIPMENT OPERATOR: Greaser on Greasing Facilities Highway SUKY2015-047 | $24.40 | $14.50 | $38.90 |
| POWER EQUIPMENT OPERATOR: Group 1 Highway SUKY2015-047 | $29.95 | $14.40 | $44.35 |
| POWER EQUIPMENT OPERATOR: Group 2 Highway SUKY2015-047 | $29.95 | $14.40 | $44.35 |
| POWER EQUIPMENT OPERATOR: Group 3 Highway SUKY2015-047 | $27.26 | $14.40 | $41.66 |
| POWER EQUIPMENT OPERATOR: Group 4 Highway SUKY2015-047 | $26.96 | $14.40 | $41.36 |
| POWER EQUIPMENT OPERATOR: TRUCK DRIVER Driver Highway SUKY2015-047 (3 Tons and Over), Driver (Truck Mounted Rotary Drill) | $23.74 | $14.50 | $38.24 |
| POWER EQUIPMENT OPERATOR: Truck Mechanic Highway SUKY2015-047 | $23.50 | $14.50 | $38.00 |
| POWER EQUIPMENT OPERATOR: Truck Tender and Warehouseman Highway SUKY2015-047 | $23.20 | $14.50 | $37.70 |
| POWER EQUIPMENT OPERATOR: Way, Clamshell, Concrete Mixer Highway SUKY2015-047 (21 cu ft or over), Concrete Pump, Crane, Crusher Plant, Derrick, Derrick Boat, Ditching and Trenching Machine, Dragline, Dredge Engineer, Elevator (regardless of ownership when used for hoisting any building material), Elevating Grader and all types of Loaders, Hoe-type Scoop, Bulldozer, Mechanic, Orangepeel Bucket, Piledriver, Power Blade, Roller (Bituminous), Roller (Earth), Roller (Rock), Scarifier, Shovel, Tractor Shovel, Truck Crane, Well Point, Winch Truck, Push Dozer, Grout Pump, High Lift, Fork Lift (regardless of lift height), all types of Boom Cats, Truck, Concrete Paver, Grade-All, Hoist, Hyster, Material Valve Man, Rotary Drill, Power Generator, Mucking Machine, Rock Spreader attached to Equipment, Scoopmobile, KeCal Loader, Tower Cranes,(French, German and other types), Hydrocrane, Tugger, Backfiller Gurries, Self-propelled Compactor, Self-Contained Hydraulic Percussion Drill GROUP 2: All Air Compressors (200 cu ft/min or greater), Machine, Form Grader, Tractor (50 hp and over), Bull Float, Finish Machine, Outboard Motor Boat, Brakeman, Mechanic Tender, Whirly Oiler, Tract-air, Road Widening Trencher, Articulating Trucks GROUP 4: Bituminous Distributor, Cement Gun, Conveyor, Mud Jack, Paving Joint Machine, Pump, Tamping Machine, Tractor (under 50 hp), Vibrator, Oiler, Air Compressor (under 200 cu ft per minute), Concrete Saw, Burlap and Curing Machine, Hydro Seeder, Power Form Handling Equipment, Deckhand Oiler, Hydraulic Post Driver SHEET METAL WORKER | $20.40 | $7.80 | $28.20 |
| Projects under $20,000,000.00 Heavy IRON0782-010 | $35.63 | $26.49 | $62.12 |
| SHEET METAL WORKER Building SHEE0110-006 (Excludes HVAC Duct Installation) | $40.32 | $25.66 | $65.98 |
| SPRINKLER FITTER Building SFKY0669-001 (Fire Sprinklers) | $44.15 | $26.08 | $70.23 |
| stacks, tanks, scaffolds, catwalks, radio and T.V. towers, structural steel Highway SUKY2015-047 (open, unprotected, unfloored raw steel), and bridges or similar hazardous locations where workmen are subject to fall, except where using JLG's and bucket trucks up to 75 feet: Add 25% to workman's base rate for 50 to 75 feet, and add 50% to workman's base rate for over 75 feet. IRONWORKER | $27.56 | $20.57 | $48.13 |
| Stone Mason Highway SUKY2015-047 | $21.50 | $8.50 | $30.00 |
| ZONE 2 Building IRON0769-005 | $40.10 | $29.59 | $69.69 |
| ZONE 3 Building IRON0769-005 | $41.70 | $29.59 | $71.29 |
No trade rates match your search and filter selection.
Building
Applies to
Barren, Casey, Clinton, Cumberland, Green, Hart, Knox, Logan, Marion, McCreary +5 more
Heavy
Applies to
Adair, Barren, Casey, Clinton, Cumberland, Green, Hart, Knox, Laurel, Logan +9 more
Highway
Applies to
Adair, Barren, Bell, Breathitt, Casey, Clay, Clinton, Cumberland, Estill, Floyd +32 more