| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0080-011 | $38.05 | $30.87 | $68.92 | |
| BOILERMAKER Building BOIL0040-001 | $43.85 | $28.44 | $72.29 | |
| BOILERMAKER Highway SUKY2015-047 | $24.65 | $12.94 | $37.59 | |
| BRICKLAYER Building SUKY2015-024 | $24.61 | $11.88 | $36.49 | |
| BRICKLAYER: BRICKLAYER Highway SUKY2015-047 | $22.90 | $8.50 | $31.40 | |
| BRICKLAYER: STONE MASON Highway SUKY2015-047 | $21.50 | $8.50 | $30.00 | |
| CARPENTER Residential SUKY2010-040 | $12.22 | 0.00 | $12.22 | |
| CARPENTER Building CARP0472-004 (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $37.04 | $26.57 | $63.61 | |
| CARPENTER Highway SUKY2015-047 | $24.90 | $14.50 | $39.40 | |
| CARPENTER (FORM WORK ONLY) Building SUKY2015-024 | $20.69 | $9.05 | $29.74 | |
| CARPENTER (FORM WORK ONLY) Heavy CARP0064-007 | $33.89 | $24.06 | $57.95 | |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, HARDWOOD FLOOR LAYING, AND METAL STUD INSTALLATION Building SUKY2015-024 | $25.25 | $12.07 | $37.32 | |
| CARPENTER: PILEDRIVER Highway SUKY2015-047 | $24.55 | $14.50 | $39.05 | |
| CEMENT MASON Highway SUKY2015-047 | $21.25 | $8.50 | $29.75 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUKY2010-040 | $10.50 | 0.00 | $10.50 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0132-015 | $33.60 | $16.05 | $49.65 | |
| CEMENT MASON/CONCRETE FINISHER Heavy SUKY2011-016 | $21.60 | $10.35 | $31.95 | |
| ELECTRICIAN Residential SUKY2010-040 | $15.17 | 0.00 | $15.17 | |
| ELECTRICIAN Building ELEC0317-005 | $41.15 | $29.35 | $70.50 | |
| ELECTRICIAN Heavy SUKY2011-016 | $32.35 | $2.18 | $34.53 | |
| ELECTRICIAN WHEN WORKMEN ARE REQUIRED TO WORK FROM BOSUM CHAIRS, TRUSSES, STACKS, TANKS, SCAFFOLDS, CATWALKS, RADIO AND T.V. TOWERS, STRUCTURAL STEEL Highway SUKY2015-047 (OPEN, UNPROTECTED, UNFLOORED RAW STEEL), AND BRIDGES OR SIMILAR HAZARDOUS LOCATIONS WHERE WORKMEN ARE SUBJECT TO FALL, EXCEPT WHERE USING JLG'S AND BUCKET TRUCKS UP TO 75 FEET: ADD 25% TO WORKMAN'S BASE RATE FOR 50 TO 75 FEET, AND ADD 50% TO WORKMAN'S BASE RATE FOR OVER 75 FEET | $29.36 | $10.55 | $39.91 | |
| GLAZIER Building PAIN1195-003 | $32.89 | $14.33 | $47.22 | |
| IRONWORKER Highway SUKY2015-047 | $27.56 | $20.57 | $48.13 | |
| IRONWORKER (PROJECTS OVER $20,000,000.00) Heavy IRON0782-010 | $37.47 | $26.49 | $63.96 | |
| IRONWORKER (PROJECTS UNDER $20,000,000.00) Heavy IRON0782-010 | $35.63 | $26.49 | $62.12 | |
| IRONWORKER, STRUCTURAL AND REINFORCING: ZONE 1 ZONE 1 - Building IRON0769-002 (NO BASE RATE INCREASE) UP TO 10 MILE RADIUS OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY | $39.70 | $29.59 | $69.29 | |
| IRONWORKER, STRUCTURAL AND REINFORCING: ZONE 2 ZONE 2 - Building IRON0769-002 (ADD $0.40 PER HOUR TO BASE RATE) 10 TO 50 MILE RADIUS OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY | $40.10 | $29.59 | $69.69 | |
| IRONWORKER, STRUCTURAL AND REINFORCING: ZONE 3 ZONE 3 - Building IRON0769-002 (ADD $2.00 PER HOUR TO BASE RATE) 50 MILE RADIUS & OVER OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY | $41.70 | $29.59 | $71.29 | |
| LABORER GROUP 1 Highway SUKY2015-047 | $21.80 | $12.36 | $34.16 | |
| LABORER GROUP 2 Highway SUKY2015-047 | $22.05 | $12.36 | $34.41 | |
| LABORER GROUP 3 Highway SUKY2015-047 | $22.10 | $12.36 | $34.46 | |
| LABORER GROUP 4 Highway SUKY2015-047 | $22.70 | $12.36 | $35.06 | |
| LABORER: AIRTRACK DRILLER Heavy LABO1445-001 | $27.77 | $19.66 | $47.43 | |
| LABORER: COMMON OR GENERAL Residential SUKY2010-040 | $10.30 | 0.00 | $10.30 | |
| LABORER: COMMON OR GENERAL Building SUKY2015-024 | $20.36 | $11.20 | $31.56 | |
| LABORER: COMMON OR GENERAL Heavy SUKY2011-016 | $21.36 | $9.39 | $30.75 | |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) Heavy LABO0189-014 | $27.12 | $19.66 | $46.78 | |
| LABORER: CONCRETE WORKER Heavy LABO0189-014 | $26.87 | $19.66 | $46.53 | |
| LABORER: FLAGGER Heavy SUKY2011-016 | $18.31 | $8.89 | $27.20 | |
| LABORER: MASON TENDER - BRICK Building LABO1392-004 | $28.16 | $17.55 | $45.71 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Building SUKY2015-024 | $22.27 | $10.42 | $32.69 | |
| LABORER: PIPELAYER Building LABO0189-007 | $28.53 | $17.38 | $45.91 | |
| LABORER: PIPELAYER Heavy SUKY2011-016 | $20.15 | $8.92 | $29.07 | |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR Heavy ELEC0369-004 | $39.15 | $17.58 | $56.73 | |
| LINE CONSTRUCTION: GROUNDMAN Heavy ELEC0369-004 | $25.77 | $14.10 | $39.87 | |
| LINE CONSTRUCTION: LINEMAN Heavy ELEC0369-004 | $43.84 | $18.80 | $62.64 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building SUKY2015-024 | $23.56 | $11.05 | $34.61 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Heavy SUKY2011-016 | $25.97 | $10.25 | $36.22 | |
| OPERATOR: BULLDOZER Building SUKY2015-024 | $25.36 | $13.00 | $38.36 | |
| OPERATOR: GRADER/BLADE Building SUKY2015-024 | $24.33 | $13.00 | $37.33 | |
| OPERATOR: LOADER Heavy SUKY2011-016 | $30.35 | 0.00 | $30.35 | |
| PAINTER (ALL EXCLUDING BRIDGES) Highway SUKY2015-047 | $19.92 | $9.57 | $29.49 | |
| PAINTER (BRIDGES) Highway SUKY2015-047 | $23.92 | $10.07 | $33.99 | |
| PAINTER (BRUSH AND ROLLER) Building SUKY2015-024 | $18.36 | $7.07 | $25.43 | |
| PAINTER (SPRAY ONLY) Building PAIN1072-005 | $34.29 | $23.95 | $58.24 | |
| PAINTER: BRUSH AND ROLLER Residential SUKY2010-040 | $12.50 | 0.00 | $12.50 | |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) Building PLUM0248-001 | $42.75 | $25.76 | $68.51 | |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) Building SUKY2015-024 | $25.63 | $20.94 | $46.57 | |
| PLUMBER Residential SUKY2010-040 | $22.04 | 0.00 | $22.04 | |
| PLUMBER Building SUKY2015-024 | $32.60 | $18.78 | $51.38 | |
| PLUMBER Highway SUKY2015-047 | $22.52 | $7.80 | $30.32 | |
| POWER EQUIPMENT OPERATOR (OILER) Building ENGI0181-084 | $34.99 | $19.60 | $54.59 | |
| POWER EQUIPMENT OPERATOR GROUP 1 BULLDOZER; CRANE; DRILL; GRADER/BLADE; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER Heavy ENGI0181-011 (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | |
| POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER Heavy ENGI0181-011 (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | |
| POWER EQUIPMENT OPERATOR GROUP 4 OILER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER Heavy ENGI0181-011 (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER Building ENGI0181-083 | $41.98 | $19.60 | $61.58 | |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE Building ENGI0181-090 | $41.98 | $19.60 | $61.58 | |
| POWER EQUIPMENT OPERATOR: FORKLIFT Building ENGI0181-091 | $41.98 | $19.60 | $61.58 | |
| POWER EQUIPMENT OPERATOR: GROUP 1 Highway SUKY2015-047 | $29.95 | $14.40 | $44.35 | |
| POWER EQUIPMENT OPERATOR: GROUP 2 Highway SUKY2015-047 | $29.95 | $14.40 | $44.35 | |
| POWER EQUIPMENT OPERATOR: GROUP 3 Highway SUKY2015-047 | $27.26 | $14.40 | $41.66 | |
| POWER EQUIPMENT OPERATOR: GROUP 4 Highway SUKY2015-047 | $26.96 | $14.40 | $41.36 | |
| ROOFER Building SUKY2015-024 | $22.31 | $7.41 | $29.72 | |
| SHEET METAL WORKER Building SHEE0110-006 (EXCLUDES HVAC DUCT INSTALLATION) | $40.32 | $25.66 | $65.98 | |
| SHEET METAL WORKER Highway SUKY2015-047 | $20.40 | $7.80 | $28.20 | |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Building SUKY2015-024 | $22.86 | $13.00 | $35.86 | |
| SPRINKLER FITTER Building SFKY0669-002 | $44.15 | $26.08 | $70.23 | |
| TILE FINISHER Building SUKY2015-024 | $17.67 | $7.45 | $25.12 | |
| TILE SETTER Building SUKY2015-024 | $25.77 | $6.10 | $31.87 | |
| TRUCK DRIVER: DRIVER Highway SUKY2015-047 (SEMI-TRAILER OR POLE TRAILER), DRIVER (DUMP TRUCK, TANDEM AXLE), DRIVER OF DISTRIBUTOR | $23.40 | $14.50 | $37.90 | |
| TRUCK DRIVER: DRIVER Highway SUKY2015-047 (3 TONS AND UNDER), TIRE CHANGER AND TRUCK MECHANIC TENDER | $23.53 | $14.50 | $38.03 | |
| TRUCK DRIVER: DRIVER Highway SUKY2015-047 (3 TONS AND OVER), DRIVER (TRUCK MOUNTED ROTARY DRILL) | $23.74 | $14.50 | $38.24 | |
| TRUCK DRIVER: DRIVER ON MIXER TRUCKS (ALL TYPES) Highway SUKY2015-047 | $23.45 | $14.50 | $37.95 | |
| TRUCK DRIVER: DRIVER ON PAVEMENT BREAKERS Highway SUKY2015-047 | $23.55 | $14.50 | $38.05 | |
| TRUCK DRIVER: DRIVER, EUCLID AND OTHER HEAVY EARTH MOVING EQUIPMENT AND LOW BOY Highway SUKY2015-047 | $24.31 | $14.50 | $38.81 | |
| TRUCK DRIVER: DRIVER, WINCH TRUCK AND A-FRAME WHEN USED IN TRANSPORTING MATERIALS Highway SUKY2015-047 | $23.30 | $14.50 | $37.80 | |
| TRUCK DRIVER: DUMP TRUCK Building SUKY2015-024 | $17.07 | $6.25 | $23.32 | |
| TRUCK DRIVER: GREASER ON GREASING FACILITIES Highway SUKY2015-047 | $24.40 | $14.50 | $38.90 | |
| TRUCK DRIVER: TRUCK MECHANIC Highway SUKY2015-047 | $23.50 | $14.50 | $38.00 | |
| TRUCK DRIVER: TRUCK TENDER AND WAREHOUSEMAN Highway SUKY2015-047 | $23.20 | $14.50 | $37.70 |
No trade rates match your search and filter selection.
Residential
Applies to
Bath, Breathitt, Carter, Elliott, Fleming, Floyd, Harlan, Harrison, Johnson, Knott +18 more
Building
Applies to
Breathitt, Clay, Elliott, Floyd, Harlan, Jackson, Johnson, Knott, Lee, Leslie +7 more
Heavy
Applies to
Bell, Breathitt, Carter, Clay, Elliott, Floyd, Harlan, Jackson, Knott, Lawrence +9 more
Highway
Applies to
Adair, Barren, Bell, Breathitt, Casey, Clay, Clinton, Cumberland, Estill, Floyd +32 more