NE20260024
rev 1Residential
Applies to
Garfield, Hall, Hamilton, Howard, Merrick, Sherman, Wheeler
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Wheeler County, Nebraska are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| BOILERMAKER Building BOIL0083-002 | $48.48 | $33.57 | $82.05 | |
| BRICKLAYER Residential SUNE1984-007 | $10.65 | 0.00 | $10.65 | |
| BRICKLAYER Building SUNE2012-017 | $26.74 | $1.83 | $28.57 | |
| CARPENTER Residential SUNE1984-007 | $7.67 | 0.00 | $7.67 | |
| CARPENTER Highway SUNE2011-027 | $17.16 | 0.00 | $17.16 | |
| CARPENTER Heavy SUNE2011-014 | $22.02 | $2.68 | $24.70 | |
| CARPENTER Building SUNE2012-017 | $17.53 | $2.21 | $19.74 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUNE1984-007 | $8.92 | 0.00 | $8.92 | |
| CEMENT MASON/CONCRETE FINISHER Highway SUNE2011-027 (ADAMS, BLAINE, BUFFALO, CLAY, FRANKLIN, GARFIELD, GREELEY, HALL, HAMILTON, HARLAN, HOWARD, KEARNEY, LOUP, MERRICK, NANCE, NUCKOLLS, PHELPS, SHERMAN, VALLEY WEBSTER, WHEELE COUNTIES) | $14.06 | 0.00 | $14.06 | |
| CEMENT MASON/CONCRETE FINISHER Heavy SUNE2011-014 | $18.41 | $2.70 | $21.11 | |
| CEMENT MASON/CONCRETE FINISHER Building SUNE2012-017 | $17.80 | $1.34 | $19.14 | |
| CEMENT MASON/CONCRETE FINISHER (CUSTER COUNTY) Highway SUNE2011-027 | $15.38 | 0.00 | $15.38 | |
| DRYWALL FINISHER/TAPER Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| DRYWALL INSTALLER Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| ELECTRICIAN Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN Building ELEC0265-003 | $35.00 | $18.88 | $53.88 | |
| ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN Building ELEC0265-003 | $35.30 | $18.91 | $54.21 | |
| ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN Building ELEC0265-003 | $35.60 | $18.94 | $54.54 | |
| ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN Building ELEC0265-003 | $36.00 | $18.99 | $54.99 | |
| ELECTRICIAN, INCLUDES INSTALLATION OF TRAFFIC SIGNALS Highway SUNE2011-027 | $19.00 | 0.00 | $19.00 | |
| FENCE ERECTOR Highway SUNE2011-027 | $12.83 | 0.00 | $12.83 | |
| FLOOR LAYER: CARPET Residential SUNE1984-007 | $9.38 | 0.00 | $9.38 | |
| GLAZIER Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| HIGHWAY/PARKING LOT STRIPING: LABORER Highway SUNE2011-027 (KEARNEY COUNTY) | $12.00 | 0.00 | $12.00 | |
| HIGHWAY/PARKING LOT STRIPING: LABORER Highway SUNE2011-027 (ADAMS, BLAINE, BUFFALO, CUSTER, CLAY, FRANKLIN, GARFIELD, GREELEY, HALL, HAMILTON, HARLAN, HOWARD, LOUP, MERRICK, NANCE, NUCKOLLS, PHELPS, SHERMAN, VALLEY WEBSTER, & WHEELE COUNTIES) | $11.49 | 0.00 | $11.49 | |
| IRONWORKER, REINFORCING Highway SUNE2011-027 | $17.93 | 0.00 | $17.93 | |
| IRONWORKER, STRUCTURAL Building IRON0021-006 (CLAY, FRANKLIN, GREELEY, HAMILTON, HARLAN, KEARNEY, MERRICK, NANCE, NUCKOLIS, PHELPS, SHERMAN, VALLEY AND WEBSTER COUNTIES) | $39.00 | $22.30 | $61.30 | |
| IRONWORKER, STRUCTURAL Building IRON0021-007 (BLAINE, GARFIELD, LOUP AND WHEELER COUNTIES) | $32.14 | $19.28 | $51.42 | |
| LABORER Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| LABORER (MASON TENDER, BRICK & HOD) Building LABO1140-010 | $24.00 | $13.48 | $37.48 | |
| LABORER: ASPHALT RAKER Highway SUNE2011-027 | $11.13 | 0.00 | $11.13 | |
| LABORER: COMMON OR GENERAL Highway SUNE2011-027 (BLAINE, CLAY, FRANKLIN, GARFIELD, GREELEY, HOWARD, KEARNEY, LOUP, MERRICK, NANCE, PHELPS, SHERMAN, WEBSTER & WHEELER COUNTIES) | $11.39 | 0.00 | $11.39 | |
| LABORER: COMMON OR GENERAL Heavy SUNE2011-014 | $13.82 | 0.00 | $13.82 | |
| LABORER: COMMON OR GENERAL Building SUNE2012-017 | $12.39 | $2.40 | $14.79 | |
| LABORER: COMMON OR GENERAL, (ADAMS COUNTY) Highway SUNE2011-027 | $11.52 | 0.00 | $11.52 | |
| LABORER: COMMON OR GENERAL, (BUFFALO COUNTY) Highway SUNE2011-027 | $9.43 | 0.00 | $9.43 | |
| LABORER: COMMON OR GENERAL, (CUSTER COUNTY) Highway SUNE2011-027 | $11.12 | 0.00 | $11.12 | |
| LABORER: COMMON OR GENERAL, (HALL COUNTY) Highway SUNE2011-027 | $12.79 | 0.00 | $12.79 | |
| LABORER: COMMON OR GENERAL, (HAMILTON COUNTY) Highway SUNE2011-027 | $12.77 | 0.00 | $12.77 | |
| LABORER: COMMON OR GENERAL, (HARLAN COUNTY) Highway SUNE2011-027 | $12.24 | 0.00 | $12.24 | |
| LABORER: COMMON OR GENERAL, (NUCKOLLS COUNTY) Highway SUNE2011-027 | $10.64 | 0.00 | $10.64 | |
| LABORER: COMMON OR GENERAL, (VALLEY COUNTY) Highway SUNE2011-027 | $11.13 | 0.00 | $11.13 | |
| LABORER: LANDSCAPE & IRRIGATION Highway SUNE2011-027 | $8.30 | 0.00 | $8.30 | |
| LABORER: MASON TENDER Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Highway SUNE2011-027 | $9.75 | 0.00 | $9.75 | |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER Highway SUNE2011-027 (BLAINE, CLAY, CUSTER, FRANKLIN, GARFIELD, GREELEY, LOUP, MERRICK, NANCE, NUCKOLLS, PHELPS, WEBSTER & WHEELER COUNTIES) | $10.16 | 0.00 | $10.16 | |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER (ADAMS COUNTY) Highway SUNE2011-027 | $8.75 | 0.00 | $8.75 | |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER (BUFFALO COUNTY) Highway SUNE2011-027 | $10.97 | 0.00 | $10.97 | |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER (HALL COUNTY) Highway SUNE2011-027 | $9.72 | 0.00 | $9.72 | |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER (HAMILTON COUNTY) Highway SUNE2011-027 | $9.65 | 0.00 | $9.65 | |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER (HARLAN COUNTY) Highway SUNE2011-027 | $11.96 | 0.00 | $11.96 | |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER (HOWARD COUNTY) Highway SUNE2011-027 | $9.35 | 0.00 | $9.35 | |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER (KEARNEY COUNTY) Highway SUNE2011-027 | $9.68 | 0.00 | $9.68 | |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER (SHERMAN COUNTY) Highway SUNE2011-027 | $9.83 | 0.00 | $9.83 | |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER (VALLEY COUNTY) Highway SUNE2011-027 | $11.15 | 0.00 | $11.15 | |
| LATHER Residential SUNE1984-007 | $9.00 | 0.00 | $9.00 | |
| OPERATING ENGINEERS: (SKID LOADER) Highway SUNE2011-027 | $12.96 | 0.00 | $12.96 | |
| OPERATOR: ASPHALT PLANT Highway SUNE2011-027 | $12.75 | 0.00 | $12.75 | |
| OPERATOR: BACKHOE LOADER COMBO Highway SUNE2011-027 | $14.33 | 0.00 | $14.33 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Heavy SUNE2011-014 | $19.96 | $2.61 | $22.57 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building SUNE2012-017 | $21.82 | $2.22 | $24.04 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Heavy SUNE2011-014 | $19.47 | $4.07 | $23.54 | |
| OPERATOR: BROOM/SWEEPER Highway SUNE2011-027 | $10.77 | 0.00 | $10.77 | |
| OPERATOR: BULLDOZER Highway SUNE2011-027 | $15.69 | 0.00 | $15.69 | |
| OPERATOR: BULLDOZER Heavy SUNE2011-014 | $15.95 | $3.04 | $18.99 | |
| OPERATOR: CHAIN SAW Highway SUNE2011-027 | $13.35 | 0.00 | $13.35 | |
| OPERATOR: COMPACTOR Highway SUNE2011-027 | $10.05 | 0.00 | $10.05 | |
| OPERATOR: CRANE Highway SUNE2011-027 (ADAMS, BLAINE, BUFFALO, CUSTER, CLAY, FRANKLIN, GARFIELD, GREELEY, HALL, HAMILTON, HOWARD, KEARNEY, LOUP, MERRICK, NANCE, NUCKOLLS, PHELPS, SHERMAN, VALLEY WEBSTER, & WHEELE COUNTIES) | $16.17 | 0.00 | $16.17 | |
| OPERATOR: CRANE (HARLAN COUNTY) Highway SUNE2011-027 | $13.60 | $1.80 | $15.40 | |
| OPERATOR: DISTRIBUTOR Highway SUNE2011-027 | $14.37 | 0.00 | $14.37 | |
| OPERATOR: GRADER/BLADE Highway SUNE2011-027 (BLAINE, BUFFALO, CUSTER, CLAY, FRANKLIN, GARFIELD, GREELEY, HAMILTON, HOWARD, KEARNEY, LOUP, MERRICK, NANCE, NUCKOLLS, PHELPS, SHERMAN, WEBSTER & WHEELER COUNTIES) | $15.51 | 0.00 | $15.51 | |
| OPERATOR: GRADER/BLADE (ADAMS COUNTY) Highway SUNE2011-027 | $18.25 | 0.00 | $18.25 | |
| OPERATOR: GRADER/BLADE (HALL COUNTY) Highway SUNE2011-027 | $15.85 | 0.00 | $15.85 | |
| OPERATOR: GRADER/BLADE (HARLAN COUNTY) Highway SUNE2011-027 | $14.49 | 0.00 | $14.49 | |
| OPERATOR: GRADER/BLADE (VALLEY COUNTY) Highway SUNE2011-027 | $15.48 | 0.00 | $15.48 | |
| OPERATOR: LOADER Highway SUNE2011-027 (ADAMS, BLAINE, CLAY, FRANKLIN, GARFIELD, GREELEY, HAMILTON, HOWARD, KEARNEY, LOUP, MARRICK, NANCE, NUCKOLLS, PHELPS, SHERMAN, VALLEY, WEBSTER, WHEELER COUNTIES) | $14.68 | 0.00 | $14.68 | |
| OPERATOR: LOADER Heavy SUNE2011-014 | $15.54 | $1.19 | $16.73 | |
| OPERATOR: LOADER Building SUNE2012-017 | $16.58 | $0.94 | $17.52 | |
| OPERATOR: LOADER (BUFFALO COUNTY) Highway SUNE2011-027 | $15.21 | 0.00 | $15.21 | |
| OPERATOR: LOADER (CUSTER COUNTY) Highway SUNE2011-027 | $17.58 | 0.00 | $17.58 | |
| OPERATOR: LOADER (HALL COUNTY) Highway SUNE2011-027 | $13.78 | 0.00 | $13.78 | |
| OPERATOR: LOADER (HARLAN COUNTY) Highway SUNE2011-027 | $13.02 | 0.00 | $13.02 | |
| OPERATOR: MECHANIC Highway SUNE2011-027 (ADAMS, BLAINE, BUFFALO, CUSTER, CLAY, FRANKLIN, GARFIELD, GREELEY, HAMILTON, HARLAND, HOWARD, KEARNEY, LOUP, MERRICK, NANCE, NUCKOLLS, PHELPS, SHERMAN, VALLEY WEBSTER, & WHEELE COUNTIES) | $15.42 | 0.00 | $15.42 | |
| OPERATOR: MECHANIC (HALL COUNTY) Highway SUNE2011-027 | $16.42 | 0.00 | $16.42 | |
| OPERATOR: PAVER Highway SUNE2011-027 (ASPHALT, AGGREGATE, AND CONCRETE) | $12.35 | 0.00 | $12.35 | |
| OPERATOR: ROLLER Highway SUNE2011-027 (BLAINE, BUFFALO, CUSTER, CLAY, FRANKLIN, GARFIELD, GREELEY, HALL, HAMILTON, HOWARD, KEARNEY, LOUP, MERRICK, NANCE, NUCKOLLS, PHELPS, SHERMAN, WEBSTER, & WHEELE COUNTIES) | $12.00 | 0.00 | $12.00 | |
| OPERATOR: ROLLER (ADAMS COUNTY) Highway SUNE2011-027 | $12.16 | 0.00 | $12.16 | |
| OPERATOR: ROLLER (HARLAN COUNTY) Highway SUNE2011-027 | $12.86 | 0.00 | $12.86 | |
| OPERATOR: ROLLER (VALLEY COUNTY) Highway SUNE2011-027 | $12.30 | 0.00 | $12.30 | |
| OPERATOR: SCRAPER Highway SUNE2011-027 (ADAMS, BLAINE, BUFFALO, CUSTER, CLAY, FRANKLIN, GARFIELD, GREELEY, HALL, HAMILTON, HOWARD, KEARNEY, LOUP, MERRICK, NANCE, NUCKOLLS, PHELPS, SHERMAN, VALLEY WEBSTER, & WHEELE COUNTIES) | $15.79 | 0.00 | $15.79 | |
| OPERATOR: SCRAPER Heavy SUNE2011-014 | $14.89 | $2.06 | $16.95 | |
| OPERATOR: SCRAPER (HARLAN COUNTY) Highway SUNE2011-027 | $15.50 | 0.00 | $15.50 | |
| OPERATOR: SCREED Highway SUNE2011-027 | $12.01 | 0.00 | $12.01 | |
| OPERATOR: TRACTOR Highway SUNE2011-027 (ADAMS, BLAINE, BUFFALO, CUSTER, CLAY, FRANKLIN, GARFIELD, GREELEY, HAMILTON, HARLAND, HOWARD, KEARNEY, LOUP, MERRICK, NANCE, NUCKOLLS, PHELPS, SHERMAN, VALLEY WEBSTER, & WHEELE COUNTIES) | $12.80 | 0.00 | $12.80 | |
| OPERATOR: TRACTOR (HALL COUNTY) Highway SUNE2011-027 | $13.73 | 0.00 | $13.73 | |
| OPERATOR: TRENCHER Highway ENGI0571-005 | $32.18 | $19.75 | $51.93 | |
| PAINTER Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| PIPEFITTER Building PLUM0464-017 (INCLUDES HVAC PIPE AND SYSTEM INSTALLATION) | $46.25 | $21.10 | $67.35 | |
| PLASTERER Residential SUNE1984-007 | $8.50 | 0.00 | $8.50 | |
| PLASTERER TENDER Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| PLUMBER Residential SUNE1984-007 | $7.94 | 0.00 | $7.94 | |
| PLUMBER Building PLUM0016-009 (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) | $44.26 | $16.90 | $61.16 | |
| POWER EQUIPMENT OPERATOR: BACKHOE, EXCAVATOR, TRACKHOE Highway SUNE2011-027 (ADAMS, BLAINE, BUFFALO, CLAY, CUSTER, FRANKLIN, GARFIELD, GREELEY, HALL, HAMILTON, HOWARD, KEARNEY, LOUP, MERRICK, NANCE, NUCKOLLS, PHELPS, SHERMAN, VALLEY, WEBSTER, WHEELER) | $15.14 | 0.00 | $15.14 | |
| POWER EQUIPMENT OPERATOR: BACKHOE, EXCAVATOR, TRACKHOE (HARLAN) Highway SUNE2011-027 | $14.36 | $1.71 | $16.07 | |
| POWER EQUIPMENT OPERATORS: (ASPHALT PAVER) Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: (ASPHALT PLANT) Residential SUNE1984-007 | $7.30 | 0.00 | $7.30 | |
| POWER EQUIPMENT OPERATORS: (BACKHOE) Residential SUNE1984-007 | $9.50 | 0.00 | $9.50 | |
| POWER EQUIPMENT OPERATORS: (CONCRETE PUMP) Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: (MOTOR PATROL) Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: (ROLLER) Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: (SCREED) Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: BULLDOZER Residential SUNE1984-007 | $7.65 | 0.00 | $7.65 | |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: MECHANIC Residential SUNE1984-007 | $8.50 | 0.00 | $8.50 | |
| POWER EQUIPMENT OPERATORS: MOTOR GRADER Residential SUNE1984-007 | $7.60 | 0.00 | $7.60 | |
| POWER EQUIPMENT OPERATORS: SCRAPER Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: TRACTOR Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| ROOFER Residential SUNE1984-007 | $7.67 | 0.00 | $7.67 | |
| ROOFER Building SUNE2012-017 | $14.52 | $0.65 | $15.17 | |
| SHEET METAL WORKER Building SHEE0003-006 (INCLUDES HVAC DUCT INSTALLATION) | $39.65 | $19.87 | $59.52 | |
| SHEET METAL WORKER/AC MECHANIC Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SUNE2012-017 | $19.07 | $4.15 | $23.22 | |
| TILE SETTER Residential SUNE1984-007 | $9.65 | 0.00 | $9.65 | |
| TRUCK DRIVER Residential SUNE1984-007 | $7.25 | 0.00 | $7.25 | |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK Highway SUNE2011-027 (HAMILTON COUNTY) | $13.58 | 0.00 | $13.58 | |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK Highway SUNE2011-027 (HALL & HOWARD COUNTIES) | $11.00 | 0.00 | $11.00 | |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK Highway SUNE2011-027 (BLAINE, BUFFALO, CUSTER, CLAY, FRANKLIN, GARFIELD, GREELEY, HARLAND, KEARNEY, LOUP, MERRICK, NANCE, NUCKOLLS, PHELPS, SHERMAN, VALLEY WEBSTER,& WHEELER COUNTIES) | $12.18 | 0.00 | $12.18 | |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK Highway SUNE2011-027 (ADAMS COUNTY) | $12.13 | 0.00 | $12.13 | |
| TRUCK DRIVER: DUMP, LOWBOY AND TANDEM Building SUNE2012-017 | $14.56 | $1.68 | $16.24 | |
| TRUCK DRIVER: LOWBOY Highway SUNE2011-027 (ADAMS, BLAINE, BUFFALO, CUSTER, CLAY, FRANKLIN, GARFIELD, GREELEY, HARLAND, HOWARD, KEARNEY, LOUP, MERRICK, NANCE, NUCKOLLS, PHELPS, SHERMAN, VALLEY WEBSTER, & WHEELE COUNTIES) | $11.99 | 0.00 | $11.99 | |
| TRUCK DRIVER: LOWBOY (HALL COUNTY) Highway SUNE2011-027 | $13.20 | 0.00 | $13.20 | |
| TRUCK DRIVER: LOWBOY (HAMILTON COUNTY) Highway SUNE2011-027 | $13.50 | 0.00 | $13.50 | |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK Highway SUNE2011-027 | $13.25 | 0.00 | $13.25 | |
| TRUCK DRIVER: SEMI-TRAILER TRUCK Highway SUNE2011-027 | $11.25 | 0.00 | $11.25 | |
| TRUCK DRIVER: WATER TRUCK Highway SUNE2011-027 | $11.00 | 0.00 | $11.00 |
No trade rates match your search and filter selection.
Residential
Applies to
Garfield, Hall, Hamilton, Howard, Merrick, Sherman, Wheeler
Highway
Applies to
Adams, Blaine, Buffalo, Clay, Custer, Franklin, Garfield, Greeley, Hall, Hamilton +12 more
Heavy
Applies to
Buffalo, Clay, Custer, Franklin, Garfield, Greeley, Hall, Hamilton, Harlan, Howard +9 more
Building
Applies to
Blaine, Clay, Franklin, Garfield, Greeley, Hamilton, Harlan, Kearney, Loup, Merrick +7 more