NJ20260001
rev 2Highway
54 trades
Applies to
Atlantic, Burlington, Camden, Cape May, Cumberland, Gloucester, Mercer, Monmouth, Ocean, Salem
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Burlington County, New Jersey are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR: Building ASBE0014-003 (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT) (BURLINGTON COUNTY (CITY OF BEVERLY; TOWNSHIPS OF CINNAMINSON, DELANCO, DELRON, EDGEWATER PARK, EVESHAM, HAINESPORT AND LUMBERTON; BOROUGH OF MAPLE SHADE; TOWNSHIP OF MEDFOD; BOROUGH OF MEDFORD LAKES; TOWNSHIP OF RIVERSIDE; BOROUGH OF RIVERTON; TOWNSHIPS OF SHAMONG, SOUTHAMPTON, TABERNACLE, WESTHAMPTON AND WILLINGBORO)) | $60.84 | $48.38 | $109.22 | |
| ASBESTOS WORKER/HEAT & FROST INSULATOR: Building ASBE0089-003 (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT) (BURLINGTON COUNTY (TOWNSHIPS OF BORDENTOWN, BURLINGTON, CHESTERFIELD, EASTHAMPTON, FLORENCE, MANSFIELD, MT. HOLLY, NEW HANOVER, NORTH HANOVER, PEMBERTON, SPRINGFIELD AND WOODLAND) PAID HOLIDAYS: The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay | $55.80 | $40.80 | $96.60 | |
| BRICKLAYER Highway PLAS0592-031 (HUNTERDON COUNTY (SOUTH AND EAST OF A LINE DRAWN FROM CLOVER HILL, THROUGH REAVILLE, THROUGH FLEMINGTON, THROUGH HIGH BRIDGE, THROUGH CALIFON, THROUGH FAIRMONT, TO POTTERSVILLE); MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGH OF DUNELLEN; TOWNSHIP OF EDISON (TOWN OF OAK TREE); TOWNSHIP OF PISCATAWAY (TOWN OF NEW MARKET); BOROUGH OF SOUTH PLAINFIELD); SOMERSET COUNTY (SOUTH OF A LINE DRAWN FROM THE POINT WHERE THE LAMINGTON RIVER LEAVES THE BOUNDARY LINE BETWEEN HUNTERDON AND SOMERSET COUNTIES; THEN, CONTINUING ALONG THE LAMINGTON RIVER TO WHERE IT BECOMES THE NORTH BRANCH OF THE RARITAN RIVER; THEN, CONTINUING ALONG THE NORTH BRANCH OF THE RARITAN RIVER TO WHERE IT BECOMES CHAMBERS BROOK; THEN, CONTINUING ALONG CHAMBERS BROOK UNTIL IT BECOMES THE BOUNDARY LINE BETWEEN THE TOWNSHIPS OF BERNARDS AND BRIDGEWATER; THEN, CONTINUING ALONG THE BOUNDARY LINE BETWEEN THE TOWNSHIPS OF BERNARDS AND BRIDGEWATER, UNTIL THAT BOUNDARY LINE INTERSECTS WITH ROUTE 78; THEN, CONTINUING ALONG ROUTE 78 UNTIL ROUTE 78 INTERSECTS WITH ROUTE 525; THEN, CONTINUING ALONG ROUTE 525 UNTIL ROUTE 525 INTERSECTS WITH THE BOUNDARY LINE BETWEEN THE TOWNSHIPS OF BRIDGEWATER AND WARREN; THEN, CONTINUING ALONG THE BOUNDARY LINE BETWEEN THE TOWNSHIPS OF BRIDGEWATER AND WARREN UNTIL THAT BOUNDARY LINE INTERSECTS WITH ROUTE 22; THEN, CONTINUING ALONG ROUTE 22 UNTIL ROUTE 22 INTERSECTS WITH SEBRINGS MILLS RD. (ALSO KNOWN AS KING GEORGE RD.); THEN, CONTINUING SOUTH ALONG SEBRINGS MILLS RD. UNTIL IT GOES OVER GREEN BROOK, WHICH IS THE MIDDLESEX COUNTY LINE):) WORK 100 DEGREES F. AND OVER: TO BE PAID AT THE RATE OF DOUBLE TIME. WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL. WORK 100 DEGREES F. AND OVER: TO BE PAID AT THE RATE OF DOUBLE TIME. WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL | $49.57 | $37.06 | $86.63 | |
| BRICKLAYER Residential BRNJ0002-004 | $49.60 | $37.96 | $87.56 | |
| BRICKLAYER WORK 100 DEGREES F. AND OVER: TO BE PAID AT THE RATE OF DOUBLE TIME. WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL Highway ELEC0400-001 | $57.70 | $45.92 | $103.62 | |
| BRICKLAYER Work on high stacks: 22% per hour additional Building BRNJ0002-013 | $45.20 | $33.26 | $78.46 | |
| CARPENTER Highway CARP0006-005 | $57.42 | $34.02 | $91.44 | |
| CARPENTER Building CARP0006-009 (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | $57.42 | $34.17 | $91.59 | |
| CARPENTER (INCLUDES DRYWALL HANGING) Residential CARP0006-001 | $48.27 | $5.79 | $54.06 | |
| CARPENTER, INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION Building CARP0006-010 | $57.42 | $34.17 | $91.59 | |
| CARPENTER: INCLUDING FORM WORK THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER Heavy CARP0006-013 | $57.42 | $34.17 | $91.59 | |
| CARPENTER: SCAFFOLD BUILDER THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER Heavy CARP0006-009 | $57.42 | $34.17 | $91.59 | |
| CEMENT MASON Highway BRNJ0002-003 (DOES NOT INCLUDE BUILDING CONSTRUCTION IN MERCER COUNTY - SEE SUNJ1993-001) CEMENT MASON: EPOXY, ACID AND LATEX WORK: $.50 PER HOUR ADDITIONAL | $45.20 | $33.26 | $78.46 | |
| CEMENT MASON Highway PLAS0592-028 (ATLANTIC, CAPE MAY, CUMBERLAND AND OCEAN COUNTIES:) | $53.21 | $33.72 | $86.93 | |
| CEMENT MASON Residential BRNJ0005-001 | $45.20 | $33.26 | $78.46 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0592-036 | $53.21 | $33.42 | $86.63 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0592-036 | $53.21 | $33.42 | $86.63 | |
| DOCK BUILDER & PILEDRIVERMEN Highway CARP1556-002 (MERCER AND MONMOUTH COUNTIES:) WORK ON LAND PILE DRIVING, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRODUCTS: $.25 PER HOUR ADDITIONAL. WORK ON HAZARDOUS/TOXIC/CONTAMINATED WASTE REMOVAL, ON A HAZARDOUS/TOXIC/CONTAMINATED WASTE SITE, WHERE THE WORKER COMES INTO CONTACT WITH HAZARDOUS/TOXIC/CONTAMINATED WASTE MATERIAL, AND WHEN A, B OR C PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED AND USED FOR RESPIRATORY, SKIN OR EYE PROTECTION: 20% PER HOUR ADDITIONAL | $52.98 | $52.44 | $105.42 | |
| DRYWALL FINISHER/TAPER Building PAIN0711-018 | $44.87 | $30.15 | $75.02 | |
| ELECTRICIAN Residential ELEC0269-006 (BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington-Mt. Holly road; then, south-southeast along the Burlington-Mt. Holly road to the town of Mt. Holly, includes Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, includes New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line) | $61.84 | $40.32 | $102.16 | |
| ELECTRICIAN Residential ELEC0351-004 (BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington-Mt. Holly road; then, south-southeast along the Burlington-Mt. Holly road to the town of Mt. Holly, does not include Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line) | $55.05 | $48.76 | $103.81 | |
| ELECTRICIAN AND CABLE SPLICER Building ELEC0351-001 (ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES) | $55.05 | $48.76 | $103.81 | |
| ELECTRICIAN AND CABLE SPLICER Heavy ELEC0351-012 (BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE) | $55.05 | $48.76 | $103.81 | |
| ELECTRICIAN AND CABLE SPLICER: INCLUDES LOW VOLTAGE WIRING Building ELEC0269-017 (BURLINGTON COUNTY (NORTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, INCLUDES MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, INCLUDES NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE)) | $63.82 | $41.99 | $105.81 | |
| ELECTRICIAN: CABLE SPLICER Highway ELEC0269-004 (BURLINGTON COUNTY (NORTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, INCLUDES MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, INCLUDES NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE); MERCER COUNTY: | $63.82 | $41.99 | $105.81 | |
| ELECTRICIAN: CABLE SPLICER ON LEAD CABLE Building ELEC0351-001 (ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES) | $45.51 | $34.39 | $79.90 | |
| ELECTRICIAN: CABLE SPLICER ON LEAD CABLE Heavy ELEC0351-012 (BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE) | $46.51 | $34.39 | $80.90 | |
| ELECTRICIANS:: ELECTRICIAN AND CABLE SPLICER Highway ELEC0351-001 (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA | $55.05 | $48.76 | $103.81 | |
| GLAZIER Building PAIN0021-032 (BURLINGTON COUNTY (south of a line drawn between these cities: Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Work at 30 ft. above the working surface, or on a swing stage: $1.00 per hour additional | $49.96 | $35.11 | $85.07 | |
| GLAZIER Building PAIN0711-011 (BURLINGTON COUNTY (north of a line drawn between these cities: Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Work welding or using a cutting torch: $1.00 per hour Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet: $1.00 per hour additional | $52.68 | $31.29 | $83.97 | |
| HAZARDOUS WASTE REMOVAL WORK: TRUCK DRIVER: DUMP TRUCK; PICKUP TRUCK Heavy TEAM0676-004 (BURLINGTON COUNTY (WEST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C OR D IS NOT REQUIRED: $1.00 PER HOUR ADDITIONAL. SHIFT WORK: AN OWNER MANDATED IRREGULAR SHIFT STARING ANY TIME OTHER THAN BETWEEN 6:00 AM AND 8:00 AM TO RECEIVE $1.00 PER HOUR, FOR EACH HOUR WORKED, IN ADDITION TO THE REGULAR RATE OF PAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY (OR THE DAY AFTER THANKSGIVING, AT THE OPTION OF THE CONTRACTOR), THANKSGIVING DAY, THE AFTERNOON OF THE DAY BEFORE CHRISTMAS (DEC. 24) PROVIDED THAT THE WORKER WORKS IN THE MORNING, AND CHRISTMAS DAY, PROVIDED THAT THE WORKER WORKS OR IS AVAILABLE FOR WORK ON AT LEAST TWO DAYS IN THE WEEK IN WHICH THE HOLIDAY OCCURS. BEREAVEMENT PAY: IN CASE OF A DEATH IN THE WORKER'S IMMEDIATE FAMIY (MOTHER, FATHER, WIFE, HUSBAND, CHILDREN, BROTHER, SISTER, CURRENT MOTHER-IN-LAW, CURRENT FATHER-IN-LAW, GRANDPARENTS), THE WORKER SHALL BE ALLOWED LEAVE NOT TO EXCEED THREE (3) DAYS STRAIGHT-TIME PAY, PROVIDED THAT HE OR SHE SHALL RECEIVE NO PAY UNLESS THE DAY OF DEATH AND THE BURIAL DAY FALLS ON A REGULAR WORK DAY, AND NOT ON DAYS OFF, HOLIDAYS, VACATION, SATURDAYS OR SUNDAYS | $44.30 | $34.11 | $78.41 | |
| IRONWORKER Highway IRON0399-001 | $54.24 | $40.40 | $94.64 | |
| IRONWORKER: REINFORCING Residential IRON0399-002 | $53.24 | $0.40 | $53.64 | |
| IRONWORKER: REINFORCING Building IRON0399-005 | $53.24 | $38.40 | $91.64 | |
| IRONWORKER: REINFORCING Heavy IRON0399-005 | $53.24 | $38.40 | $91.64 | |
| IRONWORKER: STRUCTURAL Residential IRON0399-002 | $54.24 | $0.40 | $54.64 | |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL Building IRON0399-005 | $54.24 | $38.40 | $92.64 | |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL Heavy IRON0399-005 | $54.24 | $38.40 | $92.64 | |
| IRONWORKERS: HIGHWAY CONSTRUCTION: Highway IRON0399-008 (PRECAST AND STRUCTURAL) (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH AND EAST OF A LINE STARTING FROM THE POINT ON THE ATLANTIC-BURLINGTON COUNTY LINE WHERE THE ATLANTIC-BURLINGTON COUNTY LINE CROSSES ROUTE 206; THEN, FOLLOWING A LINE NORTHEAST THROUGH WHARTON STATE PARK TO THE TOWN OF CHATSWORTH; THEN, CONTINUING ALONG THE SAME LINE, TO THE BURLINGTON-OCEAN COUNTY LINE); CAPE MAY COUNTY; CUMBERLAND COUNTY (EAST OF A LINE DRAWN FROM THE DELAWARE BAY THROUGH THE TOWN OF CEDARVILLE AND NORTH TO THE POINT WHERE THE COUNTY LINES OF ATLANTIC, CUMBERLAND AND GLOUCESTER COUNTIES MEET); OCEAN COUNTY (SOUTH THIRD OF COUNTY) | $54.24 | $40.40 | $94.64 | |
| IRONWORKERS: REINFORCING Highway IRON0011-001 (MONMOUTH COUNTY; OCEAN COUNTY (NORTH THIRD OF COUNTY) | $49.94 | $50.32 | $100.26 | |
| IRONWORKERS: STRUCTURAL Highway IRON0011-001 (MONMOUTH COUNTY; OCEAN COUNTY (NORTH THIRD OF COUNTY) | $52.24 | $50.32 | $102.56 | |
| LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, LANDSCAPE LABORER, PIPELAYER, POWER TOOLE OPERATOR AND SCREEDMAN Building LABO0077-004 | $35.75 | $30.22 | $65.97 | |
| LABORER: COMMON OR GENERAL Residential SUNJ2004-045 | $17.10 | $6.90 | $24.00 | |
| LABORER: COMMON OR GENERAL Building SUNJ2004-003 | $19.27 | $12.42 | $31.69 | |
| LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE Building LABO0077-002 | $36.50 | $30.22 | $66.72 | |
| LABORER: MASON TENDER: CEMENT/CONCRETE Heavy LABO0077-008 | $29.35 | $23.07 | $52.42 | |
| LABORERS: HIGHWAY CONSTRUCTION: ASPHALT WORK: Highway LABO0172-003 (GROUP 4) BLASTER (ATLANTIC, BURLINGTON, CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER, MERCER, OCEAN AND SALEM COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS, CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED | $55.45 | $38.53 | $93.98 | |
| LABORERS: HIGHWAY CONSTRUCTION: ASPHALT WORK: Highway LABO0172-003 (GROUP 3) FINISHER; RAMMER; SETTER OF BRICK OR STONE PAVERS; HARDSCAPING; GUNITE NOZZLE PERSON; STONECUTTER; FORM SETTER; MANHOLE; CATCH BASIN AND INLET BUILDER; ASPHALT SCREEDPERSON (ONLY IN BERGEN, ESSEX, HUDSON AND HUNTERDON COUNTIES; MIDDLESEX COUNTY (NORTH OF THE RARITAN RIVER); MORRIS, PASSAIC, SOMERSET, SUSSEX, UNION AND WARREN COUNTIES) (ATLANTIC, BURLINGTON, CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER, MERCER, OCEAN AND SALEM COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS, CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED | $51.90 | $38.53 | $90.43 | |
| LABORERS: HIGHWAY CONSTRUCTION: ASPHALT WORK: Highway LABO0172-003 (GROUP 2) PIPELAYER; LASER PERSON; CONDUIT AND DUCT LINE LAYER; JACKHAMMER; CHIPPING HAMMER; PAVEMENT BREAKER; CONCRETE CUTTER; ASPHALT CUTTER; SHEET HAMMER OPERATOR; SANDBLASTING, ACETYLENE CUTTING AND BURNING; WAGON DRILL OPERATOR; DIRECTIONAL DRILL OPERATOR; HYDRAULIC DRILL OPERATOR; DRILL MASTER; CORE DRILLER; TRAFFIC CONTROL COORDINATOR; ASPHALT RAKER/LUTE PERSON (ONLY IN BERGEN, ESSEX, HUDSON AND HUNTERDON COUNTIES; MIDDLESEX COUNTY (NORTH OF THE RARITAN RIVER); MORRIS, PASSAIC, SOMERSET, SUSSEX, UNION AND WARREN COUNTIES); WALK-BEHIND SAW CUTTER (ATLANTIC, BURLINGTON, CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER, MERCER, OCEAN AND SALEM COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS, CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED | $51.65 | $38.53 | $90.18 | |
| LABORERS: HIGHWAY CONSTRUCTION: ASPHALT WORK: Highway LABO0172-003 (GROUP 1) | $50.95 | $38.53 | $89.48 | |
| LINE CONSTRUCTION:: GROUNDMEN Highway ELEC0351-002 (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO TH | $30.88 | $33.36 | $64.24 | |
| LINE CONSTRUCTION:: HEAVY EQUIPMENT OPERATOR Highway ELEC0351-002 (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA | $46.12 | $42.70 | $88.82 | |
| LINE CONSTRUCTION:: LINEMAN Highway ELEC0351-002 (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE | $57.65 | $49.77 | $107.42 | |
| MARBLE SETTER Building BRNJ0007-012 | $64.66 | $40.97 | $105.63 | |
| MASON TENDER: CEMENT/CONCRETE Residential LABO0077-001 | $29.35 | $23.07 | $52.42 | |
| MILLWRIGHT Building CARP0715-007 (Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.) | $58.84 | $35.06 | $93.90 | |
| OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: ELECTRICIAN Highway ELEC0400-002 (HUNTERDON COUNTY (TOWNSHIP OF DELAWARE (EAST OF A LINE FOLLOWING COUNTY ROUTE 523 FROM THE DELAWARE RIVER NORTH TO THE RARITAN TOWNSHIP LINE); TOWNSHIP OF EAST AMWELL (WEST OF STATE HWY. 31); BOROUGH OF FLEMINGTON; CITY OF LAMBERTVILLE; TOWNSHIP OF RARITAN (WEST OF STATE HWY. 31 AND SOUTH OF COUNTY ROUTE 523); BOROUGH OF STOCKTON; TOWNSHIP OF WEST AMWELL); SOMERSET COUNTY (TOWNSHIP OF MONTGOMERY (WEST AND SOUTH OF A LINE FOLLOWING U.S. HWY. 206 (FORMERLY STATE HWY. 31) NORTH FROM THE MERCER COUNTY LINE TO HARLINGEN RD.; THEN, WEST ALONG HARLINGEN RD. AND THE DUTCHTOWN-ZION ROAD TO THE HILLSBOROUGH TOWNSHIP LINE):) | $37.35 | $27.17 | $64.52 | |
| OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: LINE CONSTRUCTION: ALL OTHER WORK: Highway ELEC0269-003 (LINE TECHNICIAN; CABLE SPLICER; HEAVY EQUIPMENT OPERATOR) BURLINGTON COUNTY (NORTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, INCLUDES MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, INCLUDES NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE); MERCER COUNTY | $61.84 | $40.04 | $101.88 | |
| OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: LINE CONSTRUCTION: ALL OTHER WORK: Highway ELEC0269-003 (GROUND PERSON; TRUCK WITH WINCH OPERATOR) BURLINGTON COUNTY (NORTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, INCLUDES MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, INCLUDES NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE); MERCER COUNTY: | $49.47 | $32.03 | $81.50 | |
| OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: LINE CONSTRUCTION: ALL OTHER WORK: Highway ELEC0400-002 (LINE TECHNICIAN, CABLE SPLICER, AND EQUIPMENT OPERATOR) (MONMOUTH AND OCEAN COUNTIES) WORK WITH HAZARDOUS MATERIALS: 10% PER HOUR ADDITIONAL | $53.35 | $38.81 | $92.16 | |
| OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND Highway ELEC0269-003 (LINE TECHNICIAN; CABLE SPLICER; HEAVY EQUIPMENT OPERATOR) | $61.84 | $40.04 | $101.88 | |
| OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND Highway ELEC0269-003 (GROUND PERSON; TRUCK WITH WINCH OPERATOR) | $49.47 | $32.03 | $81.50 | |
| OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND Highway ELEC0400-002 (LINE TECHNICIAN/WELDER) WORK WITH HAZARDOUS MATERIALS: 10% PER HOUR ADDITIONAL | $53.35 | $38.81 | $92.16 | |
| OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND Highway ELEC0400-002 (LINE TECHNICIAN, CABLE SPLICER, X-RAY TECHNICIAN, AND EQUIPMENT REPAIR PERSON) WORK WITH HAZARDOUS MATERIALS: 10% PER HOUR ADDITIONAL | $53.35 | $38.81 | $92.16 | |
| OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND Highway ELEC0400-002 (EQUIPMENT SERVICE PERSON) WORK WITH HAZARDOUS MATERIALS: 10% PER HOUR ADDITIONAL | $53.12 | $38.81 | $91.93 | |
| OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND Highway PAIN0711-014 (CRANE OPERATOR) | $45.55 | $29.86 | $75.41 | |
| OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND Highway PAIN0711-014 (CABLE SPLICER) | $45.55 | $29.86 | $75.41 | |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED Residential SUNJ2004-045 | $13.50 | $2.34 | $15.84 | |
| OVER CONVEYORS OR MOVING EQUIPMENT OR MACHINERY: ELECTRICIANS:, CABLE SPLICER Highway BRNJ0002-002 (MIDDLESEX COUNTY; SOMERSET COUNTY (TOWNSHIP OF FRANKLIN (EAST OF A LINE FOLLOWING CEDAR GROVE LANE FROM THE RARITAN RIVER, IN A SOUTHWESTERLY DIRECTION, TO THE MILLSTONE BRANCH OF THE PENNSYLVANIA RAILROAD; THEN, WEST ALONG THE RAILROAD TO THE DELAWARE AND RARITAN CANAL; THEN, SOUTH ALONG THE CANAL TO THE MIDDLESEX COUNTY LINE)):) WORK ON LINE VOLTAGE OF 440 VOLTS AND OVER: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS AND LADDERS 40 FT. OR MORE FROM THE GROUND OR FLOOR; OR UNDER AIR PRESSURE; OR 10% PER HOUR ADDITIONAL | $45.20 | $33.26 | $78.46 | |
| OVER CONVEYORS OR MOVING EQUIPMENT OR MACHINERY: ELECTRICIANS:, ELECTRICIAN Highway PAIN0711-009 (MIDDLESEX COUNTY; SOMERSET COUNTY (TOWNSHIP OF FRANKLIN (EAST OF A LINE FOLLOWING CEDAR GROVE LANE FROM THE RARITAN RIVER, IN A SOUTHWESTERLY DIRECTION, TO THE MILLSTONE BRANCH OF THE PENNSYLVANIA RAILROAD; THEN, WEST ALONG THE RAILROAD TO THE DELAWARE AND RARITAN CANAL; THEN, SOUTH ALONG THE CANAL TO THE MIDDLESEX COUNTY LINE)):) WORK ON LINE VOLTAGE OF 440 VOLTS AND OVER: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS AND LADDERS 40 FT. OR MORE FROM THE GROUND OR FLOOR; OR UNDER AIR PRESSURE; OR 10% PER HOUR ADDITIONAL | $59.29 | $33.56 | $92.85 | |
| PAINTER (BRUSH & ROLLER) Building PAIN0711-019 | $45.55 | $29.86 | $75.41 | |
| PAINTER (SPRAY) Building PAIN0711-019 | $45.55 | $29.86 | $75.41 | |
| PAINTER: BRUSH AND ROLLER Residential PAIN0711-001 | $22.03 | $15.62 | $37.65 | |
| PAINTER: BRUSH AND ROLLER Heavy PAIN0711-024 (REPAINT WORK, ON PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.) | $29.05 | $18.91 | $47.96 | |
| PAINTER: BRUSH AND ROLLER (NEW CONSTRUCTION) Heavy PAIN0711-024 | $40.19 | $22.72 | $62.91 | |
| PAINTER: WORK ON BRIDGES Heavy PAIN0711-023 (MAJOR BRIDGES DESIGNED FOR COMMERCIAL NAVIGATION) | $58.28 | $33.85 | $92.13 | |
| PAINTERS: Highway PLAS0592-029 (WORK ON BRIDGES (ALL BRIDGES THAT SPAN MAJOR WATERWAYS, RAILROAD BRIDGES, BRIDGES OVER CANYONS, OVERPASSES)) | $53.21 | $33.42 | $86.63 | |
| PAINTERS:: BRUSH AND ROLLER (ALL OTHER WORK:) Highway IRON0399-008 | $51.77 | $39.65 | $91.42 | |
| PAINTERS:: SPRAY (ALL OTHER WORK:) Highway IRON0399-008 | $53.24 | $40.40 | $93.64 | |
| PILEDRIVER Highway CARP0454-002 (ATLANTIC, BURLINGTON, CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER, OCEAN AND SALEM COUNTIES:) PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS ANY OF THE THREE DAYS IN THE FIVE-DAY WORK WEEK PRECEDING THE HOLIDAY AND THE FIRST WORK DAY AFTER THE HOLIDAY | $46.73 | $41.69 | $88.42 | |
| PIPEFITTER Heavy PLUM0009-022 (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 TO MAGNOLIA ROAD, INCLUDES PEMBERTON BOROUGH; THEN, SOUTH ON MAGNOLIA ROAD IN PEMBERTON TOWNSHIP TO MAGNOLIA NEW LISBON ROAD (ROUTE 545); THEN, SOUTH ON MT. HOLLY MISERY ROAD TO STATE ROAD ROUTE 70 EAST; THEN, ALONG STATE ROAD ROUTE 70 EAST TO THE OCEAN COUNTY LINE) | $59.57 | $46.45 | $106.02 | |
| PIPEFITTER Heavy PLUM0322-011 (BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, DOES NOT INCLUDE BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, DOES NOT INCLUDE THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530, DOES NOT INCLUDE PEMBERTON BOROUGH; THEN, SOUTH ON MAGNOLIA ROAD IN PEMBERTON TOWNSHIP TO MAGNOLIA NEW LISBON ROAD (ROUTE 545); THEN, SOUTH ON MT. HOLLY MISERY RD. TO STATE ROAD ROUTE 70 EAST; THEN, ALONG STATE ROAD ROUTE 70 EAST TO THE OCEAN COUNTY LINE) | $56.30 | $50.76 | $107.06 | |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION Building PLUM0009-015 (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 to Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line) | $59.57 | $46.45 | $106.02 | |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION Building PLUM0322-008 (BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, DOES NOT INCLUDE BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, DOES NOT INCLUDE THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530, DOES NOT INCLUDE Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Rd. to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line) | $56.30 | $50.76 | $107.06 | |
| PIPEFITTER: SERVICE AND REPAIR Building PLUM0009-015 (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 to Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line) | $46.23 | $29.23 | $75.46 | |
| PIPEFITTER: SERVICE AND REPAIR Heavy PLUM0009-022 (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 TO MAGNOLIA ROAD, INCLUDES PEMBERTON BOROUGH; THEN, SOUTH ON MAGNOLIA ROAD IN PEMBERTON TOWNSHIP TO MAGNOLIA NEW LISBON ROAD (ROUTE 545); THEN, SOUTH ON MT. HOLLY MISERY ROAD TO STATE ROAD ROUTE 70 EAST; THEN, ALONG STATE ROAD ROUTE 70 EAST TO THE OCEAN COUNTY LINE) | $46.23 | $29.23 | $75.46 | |
| PLASTERER Building SUNJ2004-003 | $42.33 | 0.00 | $42.33 | |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION Building PLUM0009-015 (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 TO Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line) | $59.57 | $46.45 | $106.02 | |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION Building PLUM0322-008 (BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, DOES NOT INCLUDE BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, DOES NOT INCLUDE THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530, DOES NOT INCLUDE Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Rd. to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line) | $56.30 | $50.76 | $107.06 | |
| PLUMBER: SERVICE AND REPAIR Building PLUM0009-015 (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 TO Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line) | $46.23 | $29.23 | $75.46 | |
| PLUMBER/PIPEFITTER Residential PLUM0322-005 (BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, DOES NOT INCLUDE BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, DOES NOT INCLUDE THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530, DOES NOT INCLUDE PEMBERTON BOROUGH; THEN, SOUTH ON MAGNOLIA ROAD IN PEMBERTON TOWNSHIP TO MAGNOLIA NEW LISBON ROAD (Route 545); THEN, SOUTH ON MT. HOLLY MISERY ROAD TO STATE ROAD ROUTE 70 EAST; THEN, ALONG STATE ROAD ROUTE 70 EAST TO THE OCEAN COUNTY LINE) | $31.50 | $13.41 | $44.91 | |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE Heavy ENGI0825-021 (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 | $97.63 | |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR Heavy ENGI0825-021 (2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 | $95.72 | |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR Heavy ENGI0825-021 (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 | $94.09 | |
| POWER EQUIPMENT OPERATORS: Residential ENGI0825-006 (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | $60.13 | $37.50 | $97.63 | |
| POWER EQUIPMENT OPERATORS: Residential ENGI0825-006 (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | $61.72 | $37.50 | $99.22 | |
| POWER EQUIPMENT OPERATORS: Residential ENGI0825-006 (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | $56.59 | $37.50 | $94.09 | |
| POWER EQUIPMENT OPERATORS: Residential ENGI0825-006 (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | $58.22 | $37.50 | $95.72 | |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR Building ENGI0825-020 (2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 | $95.72 | |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR Building ENGI0825-020 (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 | $94.09 | |
| POWER EQUIPMENT OPERATORS: GROUP 4 BROOM AND SWEEPER; CHIPPER; COMPRESSOR Highway ENGI0825-002 (SINGLE); CONCRETE SPREADER (SMALL TYPE); CONVEYOR LOADER (DOES NOT INCLUDE ELEVATING GRADER); ENGINE, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTOR; FERTILIZING EQUIPMENT (OPERATION AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADER (SMALL TYPE); FRONT END LOADER (UNDER 1 CU. YD.); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCK; HEATER (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOW-TYPE UNIT); LIGHTS (PORTABLE GENERATING LIGHT PLANT); MIXER, CONCRETE, SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); OFF-ROAD BACK DUMP; PUMP (4-IN. SUCTION AND OVER, INCLUDING SUBMERSIBLE PUMP); PUMP (DIESEL ENGINE AND HYDRAULIC) (IMMATERIAL OF POWER); ROAD FINISHING MACHINE (SMALL TYPE); ROLLER, GRADE, FILL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENANCE OF); SPRINKLER AND WATER PUMP TRUCK; STEAM JENNY AND BOILER; STONE SPREADER; TAMPING MACHINE, VIBRATING RIDE-ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW-TYPE UNIT); WELDING MACHINE (GAS, DIESEL, AND/OR ELECTRIC CONVERTER OF ANY TYPE) (SINGLE, OR TWO OR THREE IN A BATTERY) (WITHIN 100 FT.); WELDING SYSTEM, MULTIPLE (RECTIFIER, TRANSFORMER TYPE); WELLPOINT SYSTEM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 | $94.09 | |
| POWER EQUIPMENT OPERATORS:, STEEL ERECTION: Highway ENGI0825-004 (GROUP 7) OILER; DECKHAND HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $65.74 | $37.50 | $103.24 | |
| REPAIR MECHANIC HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 1 AUTOGRADE - COMBINATION SUBGRADER; BASE METAL SPREADER AND BASE TRIMMER Highway ENGI0825-002 (CMI AND SIMILAR TYPES); AUTOGRADE PLACER - TRIMMER SPREADER COMBINATION (CMI AND SIMILAR TYPES); AUTOGRADE SLIPFORM PAVER (CMI AND SIMILAR TYPES); BACKHOE; CENTRAL POWER PLANT (ALL TYPES); CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); CRANE, GANTRY; DERRICK (LAND, FLOATING OR CHICAGO BOOM TYPE); DRILLMASTER, QUARRYMASTER (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); DRAGLINE; ELEVATING GRADER; FRONT END LOADER (5 CU. YD. AND OVER); GRADALL; GRADER, RAYGO; LOCOMOTIVE (LARGE); MUCKING MACHINE; PAVEMENT AND CONCRETE BREAKER (SUPERHAMMER AND HOE RAM); PILE DRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); ROADWAY SURFACE GRINDER; SCOOPER (LOADER AND SHOVEL); SHOVEL; TREE CHOPPER WITH BOOM; TRENCH MACHINE (CABLE PLOW) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 | $99.22 | |
| REPAIR MECHANIC HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 2 ""A"" FRAME/BACKHOE COMBINATION; BOOM ATTACHMENT ON LOADER Highway ENGI0825-002 (RATE BASED ON SIZE OF BUCKET, NOT APPLICABLE TO PIPEHOOK); BORING AND DRILLING MACHINE; BRUSH CHOPPER, SHREDDER AND TREE SHREDDER; CARRYALL; CONCRETE PUMP; CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPE; CONVEYOR, 125 FT. AND OVER; DRILL DOCTOR, INCLUDING DUST COLLECTING AND MAINTENANCE WORK; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); GRADER (FINISH); GROOVE CUTTING MACHINE (RIDE-ON TYPE); HEATER PLANER; HOIST (ALL TYPES OF HOIST, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR, HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT CAISSON, SNORKEL ROOF, AND/OR ANY OTHER SIMILAR TYPE HOISTING MACHINE, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE) (IF HOIST IS ""OUTSIDE MATERIAL TOWER HOIST"", LONG BOOM RATE IS TO BE APPLIED); HYDRAULIC CRANE, 10 TONS AND UNDER; HYDRO-AXE; HYDRO-BLASTER; JACK (SCREW, AIR, HYDRAULIC POWER-OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); LOG SKIDDER; PAN; PAVERS (ALL) (CONCRETE); PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINE; SQUEEZECRETE; CONCRETE PUMP (REGARDLESS OF SIZE); SCRAPER; SIDE BOOM; STRADDLE CARRIER, ROSS AND SIMILAR TYPE; WHIP HAMMER; WINCH TRUCK (HOISTING). HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY. | $60.13 | $37.50 | $97.63 | |
| REPAIR MECHANIC HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT CURBING MACHINE; ASPHALT PLANT ENGINEER; ASPHALT SPREADER; AUTOGRADE TUBE FINISHING AND TEXTURING MACHINE Highway ENGI0825-002 (CMI AND SIMILAR TYPES); AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); AUTOGRADE CURB TRIMMER AND SIDEWALK, SHOULDER, SLIPFORM (CMI AND SIMILAR TYPES); BAR BENDING MACHINE (POWER); BATCHER; BATCHING PLANT AND CRUSHER ON SITE; BELT CONVEYOR SYSTEM; BOOM-TYPE SKIMMER MACHINE; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPER (RAILROAD); COMPRESSOR AND BLOWER-TYPE UNIT (USED INDEPENDENTLY OR MOUNTED ON DUAL-PURPOSE TRUCK, ON JOBSITE OR IN CONJUNCTION WITH JOBSITE, IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS); COMPRESSOR (2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR, WHEN USED FOR DECONTAMINATION AND REMEDIATION; CONCRETE FINISHING MACHINE; CONCRETE SAW AND CUTTER (RIDE-ON TYPE); CONCRETE SPREADER, HETZEL, REXOMATIC AND SIMILAR TYPE; CONCRETE VIBRATOR; CONVEYOR, UNDER 125 FT.; CRUSHING MACHINE; DIRECTIONAL BORING MACHINE; DITCHING MACHINE, SMALL (DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE POT (MECHANICAL WITH OR WITHOUT PUMP); DUMPSTER; ELEVATOR; FIREFIGHTER; FORKLIFT (ECONOMOBILE, LULL AND SIMILAR TYPE OF EQUIPMENT); FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); GENERATOR (2 OR 3) (IN BATTERY) (WITHIN 100 FT.); GIRAFFE GRINDER; GRADER AND MOTOR PATROL; GUNITE MACHINE (DOES NOT INCLUDE NOZZLE); HAMMER, VIBRATORY (IN CONJUNCTION WITH GENERATOR); HEAVY EQUIPMENT ROBOTIC OPERATOR/TECHNICIAN, WHEN USED FOR DECONTAMINATION AND REMEDIATION; HOIST (ROOF, TUGGER, AERIAL PLATFORM HOIST AND HOUSE CARS); HOPPER; HOPPER DOOR (POWER-OPERATED); LADDER (MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; MAINTENANCE, UTILITY PERSON; MASTER ENVIRONMENTAL MAINTENANCE TECHNICIAN, WHEN USED FOR DECONTAMINATION AND REMEDIATION; MECHANIC; MIXER (EXCEPT PAVING MIXER); PAVEMENT BREAKER, SMALL, SELF-PROPELLED RIDE-ON TYPE (ALSO MAINTAINS COMPRESSOR ON HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK-MOUNTED; PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER PUMP, REGARDLESS OF SIZE; POSTHOLE DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINE (POWER); ROLLER, BLACKTOP; SCALE, POWER; SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILO; SKIMMER MACHINE (BOOM TYPE); STEEL CUTTING MACHINE, SERVICING AND MAINTAINING; TRACTOR; CAPTAIN, POWER BOAT; TUG MASTER, POWER BOAT; ULTRA HIGH-PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR/MAINTENANCE TECHNICIAN, WHEN USED FOR DECONTAMINATION AND REMEDIATION; VACUUM BLASTING MACHINE OPERATOR/MAINTENANCE TECHNICIAN, WHEN USED FOR DECONTAMINATION AND REMEDIATION; VIBRATING PLANT (USED IN CONJUNCTION WITH UNLOADING); WELDER AND WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 | $95.72 | |
| REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE Heavy ENGI0825-021 (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 | $99.22 | |
| REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: POWER EQUIPMENT OPERATORS:, STEEL ERECTION: Highway ENGI0825-004 (GROUP 6) COMPRESSOR, SINGLE; OFF-ROAD BACK DUMP; WELDING MACHINE (SINGLE, GAS, DIESEL AND ELECTRIC CONVERTERS OF ANY TYPE); WELDING SYSTEM, MULTIPLE (RECTIFIER, TRANSFORMER TYPE); GENERATOR, SINGLE HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $53.34 | $37.50 | $90.84 | |
| REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: POWER EQUIPMENT OPERATORS:, STEEL ERECTION: Highway ENGI0825-004 (GROUP 5) AERIAL PLATFORM USED AS A HOIST; COMPRESSOR, TWO OR THREE IN BATTERY; DIRECTIONAL BORING MACHINE; ELEVATOR OR HOUSE CAR; CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR, DECONTAMINATION AND REMEDIATION WORK ONLY; CONVEYOR AND TUGGER HOIST; FIREFIGHTER; FORKLIFT; GENERATOR, TWO OR THREE IN BATTERY; HEAVY EQUIPMENT ROBOTIC OPERATOR/TECHNICIAN, DECONTAMINATION AND REMEDIATION WORK ONLY; MAINTENANCE, UTILITY PERSON; MASTER ENVIRONMENTAL MAINTENANCE TECHNICIAN, DECONTAMINATION AND REMEDIATION WORK ONLY; ROD BENDING MACHINE (POWER); ULTRA HIGH-PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR/MAINTENANCE TECHNICIAN, DECONTAMINATION AND REMEDIATION WORK ONLY; VACUUM BLASTING MACHINE OPERATOR/MAINTENANCE TECHNICIAN, DECONTAMINATION AND REMEDIATION WORK ONLY; WELDING MACHINE (GAS OR ELECTRIC, TWO OR THREE IN BATTERY, INCLUDING DIESEL); CAPTAIN, POWER BOAT; TUG MASTER, POWER BOAT; OILER, WITH EITHER ONE COMPRESSOR OR ONE WELDING MACHINE HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $57.10 | $37.50 | $94.60 | |
| REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: TRUCK DRIVERS:, GROUP 2 DRIVER OF 3-AXLE TRUCKS AND FLOATS Highway TEAM0469-002 (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER); MERCER, MONMOUTH AND OCEAN COUNTIES:) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS) | $48.78 | $42.66 | $91.44 | |
| ROOFER ( ALL TYPES) Residential ROOF0030-019 | $34.35 | $21.75 | $56.10 | |
| SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE Building ENGI0825-020 (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 | $99.22 | |
| SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE Building ENGI0825-020 (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 | $97.63 | |
| SHEET METAL WORKER Building SHEE0027-009 (INCLUDING HVAC DUCT INSTALLATION) | $59.08 | $47.06 | $106.14 | |
| SOFT FLOOR LAYER Building CARP0029-006 | $57.42 | $34.17 | $91.59 | |
| SPRINKLER FITTER Building SFNJ0692-002 (FIRE SPRINKLERS) (WITHIN 15 MILES BEYOND THE CITY LIMITS OF PHILADELPHIA) | $60.83 | $30.34 | $91.17 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SFNJ0669-006 | $59.19 | $36.51 | $95.70 | |
| STRADDLE CARRIER HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS:, STEEL ERECTION: Highway ENGI0825-004 (GROUP 4) ""A"" FRAME; CHERRY PICKER (10 TON AND UNDER); HOIST (ALL TYPES OF HOIST, INCLUDING STEAM, GAS, DIESEL, ELECTRIC, AIR, HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE OF HOISTING MACHINE, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE); JACK (SCREW, AIR, HYDRAULIC POWER-OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOM; WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.63 | $37.50 | $96.13 | |
| STRADDLE CARRIER HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS:, STEEL ERECTION: Highway ENGI0825-004 (GROUP 3) HELICOPTER PILOT HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.29 | $37.50 | $98.79 | |
| STRADDLE CARRIER HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS:, STEEL ERECTION: Highway ENGI0825-004 (GROUP 2) CRANES (ALL CRANES, LAND OR FLOATING WITH BOOM INCLUDING JIB, LESS THAN 140 FT. ABOVE GROUND); DERRICKS (ALL DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOM INCLUDING JIB, LESS THAN 140 FT. ABOVE GROUND) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $68.58 | $37.50 | $106.08 | |
| STRADDLE CARRIER HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS:, STEEL ERECTION: Highway ENGI0825-004 (GROUP 1) CRANES (ALL CRANES, LAND OR FLOATING WITH BOOM INCLUDING JIB, 140 FT. AND OVER, ABOVE GROUND); DERRICKS (ALL DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOM INCLUDING JIB, 140 FT. AND OVER, ABOVE GROUND) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $70.24 | $37.50 | $107.74 | |
| TERRAZZO WORKER/SETTER Building BRNJ0007-014 | $61.77 | $42.82 | $104.59 | |
| TILE SETTER Building BRNJ0007-017 | $52.31 | $38.01 | $90.32 | |
| TILE Work grouting all epoxy: $10.00 additional per day Building BRNJ0007-017 | $43.63 | $32.12 | $75.75 | |
| TRUCK DRIVER: DUMP TRUCK DRIVERS Building TEAM0676-002 (BURLINGTON COUNTY (WEST OF THE LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required: $1.00 per hour SHIFT WORK: An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday BEREAVEMENT PAY: In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays | $44.30 | $34.11 | $78.41 | |
| TRUCK DRIVER: DUMP TRUCK; FLATBED TRUCK, PICK UP TRUCK Heavy TEAM0469-007 (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS) | $48.63 | $42.66 | $91.29 | |
| TRUCK DRIVER: OFF THE ROAD TRUCK Building TEAM0676-002 (BURLINGTON COUNTY (WEST OF THE LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required: $1.00 per hour SHIFT WORK: An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday BEREAVEMENT PAY: In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays | $44.65 | $34.11 | $78.76 | |
| TRUCK DRIVER: OFF THE ROAD TRUCK Heavy TEAM0469-007 (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS) | $48.78 | $42.66 | $91.44 | |
| TRUCK DRIVER: OFF THE ROAD TRUCK; FLATBED TRUCK Heavy TEAM0676-004 (BURLINGTON COUNTY (WEST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C OR D IS NOT REQUIRED: $1.00 PER HOUR ADDITIONAL. SHIFT WORK: AN OWNER MANDATED IRREGULAR SHIFT STARING ANY TIME OTHER THAN BETWEEN 6:00 AM AND 8:00 AM TO RECEIVE $1.00 PER HOUR, FOR EACH HOUR WORKED, IN ADDITION TO THE REGULAR RATE OF PAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY (OR THE DAY AFTER THANKSGIVING, AT THE OPTION OF THE CONTRACTOR), THANKSGIVING DAY, THE AFTERNOON OF THE DAY BEFORE CHRISTMAS (DEC. 24) PROVIDED THAT THE WORKER WORKS IN THE MORNING, AND CHRISTMAS DAY, PROVIDED THAT THE WORKER WORKS OR IS AVAILABLE FOR WORK ON AT LEAST TWO DAYS IN THE WEEK IN WHICH THE HOLIDAY OCCURS. BEREAVEMENT PAY: IN CASE OF A DEATH IN THE WORKER'S IMMEDIATE FAMIY (MOTHER, FATHER, WIFE, HUSBAND, CHILDREN, BROTHER, SISTER, CURRENT MOTHER-IN-LAW, CURRENT FATHER-IN-LAW, GRANDPARENTS), THE WORKER SHALL BE ALLOWED LEAVE NOT TO EXCEED THREE (3) DAYS STRAIGHT-TIME PAY, PROVIDED THAT HE OR SHE SHALL RECEIVE NO PAY UNLESS THE DAY OF DEATH AND THE BURIAL DAY FALLS ON A REGULAR WORK DAY, AND NOT ON DAYS OFF, HOLIDAYS, VACATION, SATURDAYS OR SUNDAYS | $44.65 | $34.11 | $78.76 | |
| TRUCK DRIVERS:, GROUP 3 TOW TRUCK DRIVER Highway TEAM0676-001 (BURLINGTON COUNTY (WEST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER); CAMDEN, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C OR D IS NOT REQUIRED: $1.00 PER HOUR ADDITIONAL. SHIFT WORK: AN OWNER MANDATED IRREGULAR SHIFT STARING ANY TIME OTHER THAN BETWEEN 6:00 AM AND 8:00 AM TO RECEIVE TO THE REGULAR RATE OF PAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY (OR THE DAY AFTER THANKSGIVING, AT THE OPTION OF THE CONTRACTOR), THANKSGIVING DAY, THE AFTERNOON OF THE DAY BEFORE CHRISTMAS (DEC. 24) PROVIDED THAT THE WORKER WORKS IN THE MORNING, AND CHRISTMAS DAY, PROVIDED THAT THE WORKER WORKS OR IS AVAILABLE FOR WORK ON AT LEAST TWO DAYS IN THE WEEK IN WHICH THE HOLIDAY OCCURS. BEREAVEMENT PAY: IN CASE OF A DEATH IN THE WORKER'S IMMEDIATE FAMIY (MOTHER, FATHER, WIFE, HUSBAND, CHILDREN, BROTHER, SISTER, CURRENT MOTHER-IN-LAW, CURRENT FATHER-IN-LAW, GRANDPARENTS), THE WORKER SHALL BE ALLOWED LEAVE NOT TO EXCEED THREE (3) DAYS STRAIGHT-TIME PAY, PROVIDED THAT HE OR SHE SHALL RECEIVE NO PAY UNLESS THE DAY OF DEATH AND THE BURIAL DAY FALLS ON A REGULAR WORK DAY, AND NOT ON DAYS OFF, HOLIDAYS, VACATION, SATURDAYS OR SUNDAYS | $44.45 | $34.11 | $78.56 | |
| TRUCK DRIVERS:, GROUP 4 TRAILER TRUCK DRIVER; WINCH TRUCK DRIVER; OFF-ROAD DUMP TRUCK DRIVER; FUEL TRUCK DRIVER; TRACTOR TRAILER DRIVER Highway TEAM0676-001 (ANY TRAILER DRIVER); ASPHALT OIL DISTRIBUTOR DRIVER; OFF-ROAD WATER TRUCK DRIVER; VACUUM TRACTOR TRAILER (BURLINGTON COUNTY (WEST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER); CAMDEN, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C OR D IS NOT REQUIRED: $1.00 PER HOUR ADDITIONAL. SHIFT WORK: AN OWNER MANDATED IRREGULAR SHIFT STARING ANY TIME OTHER THAN BETWEEN 6:00 AM AND 8:00 AM TO RECEIVE TO THE REGULAR RATE OF PAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY (OR THE DAY AFTER THANKSGIVING, AT THE OPTION OF THE CONTRACTOR), THANKSGIVING DAY, THE AFTERNOON OF THE DAY BEFORE CHRISTMAS (DEC. 24) PROVIDED THAT THE WORKER WORKS IN THE MORNING, AND CHRISTMAS DAY, PROVIDED THAT THE WORKER WORKS OR IS AVAILABLE FOR WORK ON AT LEAST TWO DAYS IN THE WEEK IN WHICH THE HOLIDAY OCCURS. BEREAVEMENT PAY: IN CASE OF A DEATH IN THE WORKER'S IMMEDIATE FAMIY (MOTHER, FATHER, WIFE, HUSBAND, CHILDREN, BROTHER, SISTER, CURRENT MOTHER-IN-LAW, CURRENT FATHER-IN-LAW, GRANDPARENTS), THE WORKER SHALL BE ALLOWED LEAVE NOT TO EXCEED THREE (3) DAYS STRAIGHT-TIME PAY, PROVIDED THAT HE OR SHE SHALL RECEIVE NO PAY UNLESS THE DAY OF DEATH AND THE BURIAL DAY FALLS ON A REGULAR WORK DAY, AND NOT ON DAYS OFF, HOLIDAYS, VACATION, SATURDAYS OR SUNDAYS | $44.65 | $34.11 | $78.76 | |
| TRUCK DRIVERS:, GROUP 4 WINCH TRAILER DRIVER Highway TEAM0469-002 (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER); MERCER, MONMOUTH AND OCEAN COUNTIES) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS) | $48.63 | $42.66 | $91.29 | |
| TRUCK DRIVERS:, GROUP 5 MECHANIC Highway TEAM0331-001 (ATLANTIC COUNTY) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. BEREAVEMENT LEAVE: ANY WORKER HAVING A DEATH IN HIS OR HER IMMEDIATE FAMILY (PARENT, SPOUSE, CHILD, BROTHER OR SISTER, MOTHER-IN-LAW OR FATHER-IN-LAW) SHALL BE GIVEN THREE DAYS TIME OFF WITH PAY AT THE TIME OF DEATH UPON FURNISHING PROOF OF SAID DEATH. THIS PROVISION SHALL ALSO APPLY TO GRANDPARENTS, WHEN LIVING WITH THE WORKER | $48.58 | $25.98 | $74.56 | |
| TRUCK DRIVERS:, GROUP 5 MECHANIC Highway TEAM0676-001 (BURLINGTON COUNTY (WEST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER); CAMDEN, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C OR D IS NOT REQUIRED: $1.00 PER HOUR ADDITIONAL. SHIFT WORK: AN OWNER MANDATED IRREGULAR SHIFT STARING ANY TIME OTHER THAN BETWEEN 6:00 AM AND 8:00 AM TO RECEIVE TO THE REGULAR RATE OF PAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY (OR THE DAY AFTER THANKSGIVING, AT THE OPTION OF THE CONTRACTOR), THANKSGIVING DAY, THE AFTERNOON OF THE DAY BEFORE CHRISTMAS (DEC. 24) PROVIDED THAT THE WORKER WORKS IN THE MORNING, AND CHRISTMAS DAY, PROVIDED THAT THE WORKER WORKS OR IS AVAILABLE FOR WORK ON AT LEAST TWO DAYS IN THE WEEK IN WHICH THE HOLIDAY OCCURS. BEREAVEMENT PAY: IN CASE OF A DEATH IN THE WORKER'S IMMEDIATE FAMIY (MOTHER, FATHER, WIFE, HUSBAND, CHILDREN, BROTHER, SISTER, CURRENT MOTHER-IN-LAW, CURRENT FATHER-IN-LAW, GRANDPARENTS), THE WORKER SHALL BE ALLOWED LEAVE NOT TO EXCEED THREE (3) DAYS STRAIGHT-TIME PAY, PROVIDED THAT HE OR SHE SHALL RECEIVE NO PAY UNLESS THE DAY OF DEATH AND THE BURIAL DAY FALLS ON A REGULAR WORK DAY, AND NOT ON DAYS OFF, HOLIDAYS, VACATION, SATURDAYS OR SUNDAYS | $44.80 | $34.11 | $78.91 | |
| zone requiring Level A, B or C personal protection: TRUCK DRIVER: DUMP TRUCK Building TEAM0469-003 (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site where the worker is not working in a PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas VACATION PAY CREDIT: Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours) | $48.63 | $42.66 | $91.29 | |
| zone requiring Level A, B or C personal protection: TRUCK DRIVER: OFF THE ROAD TRUCK Building TEAM0469-003 (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site where the worker is not working in a PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas VACATION PAY CREDIT: Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours) | $48.78 | $42.66 | $91.44 | |
| ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: TRUCK DRIVERS:, GROUP 3 TOW TRUCK DRIVER Highway TEAM0331-001 (ATLANTIC COUNTY) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. BEREAVEMENT LEAVE: ANY WORKER HAVING A DEATH IN HIS OR HER IMMEDIATE FAMILY (PARENT, SPOUSE, CHILD, BROTHER OR SISTER, MOTHER-IN-LAW OR FATHER-IN-LAW) SHALL BE GIVEN THREE DAYS TIME OFF WITH PAY AT THE TIME OF DEATH UPON FURNISHING PROOF OF SAID DEATH. THIS PROVISION SHALL ALSO APPLY TO GRANDPARENTS, WHEN LIVING WITH THE WORKER | $48.23 | $25.98 | $74.21 |
No trade rates match your search and filter selection.
Highway
Applies to
Atlantic, Burlington, Camden, Cape May, Cumberland, Gloucester, Mercer, Monmouth, Ocean, Salem
Residential
Building
Heavy