NJ20260027
BuildingDavis-Bacon Act general wage determination for building construction in New Jersey.
Track NJ20260027
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0014-003 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR: (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT) (BURLINGTON COUNTY (CITY OF BEVERLY; TOWNSHIPS OF CINNAMINSON, DELANCO, DELRON, EDGEWATER PARK, EVESHAM, HAINESPORT AND LUMBERTON; BOROUGH OF MAPLE SHADE; TOWNSHIP OF MEDFOD; BOROUGH OF MEDFORD LAKES; TOWNSHIP OF RIVERSIDE; BOROUGH OF RIVERTON; TOWNSHIPS OF SHAMONG, SOUTHAMPTON, TABERNACLE, WESTHAMPTON AND WILLINGBORO)) | $60.84 | $48.38 | $109.22 |
ASBE0089-003 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR: (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT) (BURLINGTON COUNTY (TOWNSHIPS OF BORDENTOWN, BURLINGTON, CHESTERFIELD, EASTHAMPTON, FLORENCE, MANSFIELD, MT. HOLLY, NEW HANOVER, NORTH HANOVER, PEMBERTON, SPRINGFIELD AND WOODLAND) PAID HOLIDAYS: The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay | $55.80 | $40.80 | $96.60 |
BRNJ0002-013 Effective 05/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Work on high stacks: 22% per hour additional | $45.20 | $33.26 | $78.46 |
BRNJ0007-012 Effective 07/07/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MARBLE SETTER | $64.66 | $40.97 | $105.63 |
BRNJ0007-014 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TERRAZZO WORKER/SETTER | $61.77 | $42.82 | $104.59 |
BRNJ0007-017 Effective 06/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $52.31 | $38.01 | $90.32 |
| TILE Work grouting all epoxy: $10.00 additional per day | $43.63 | $32.12 | $75.75 |
CARP0006-009 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | $57.42 | $34.17 | $91.59 |
CARP0006-010 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION | $57.42 | $34.17 | $91.59 |
CARP0029-006 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SOFT FLOOR LAYER | $57.42 | $34.17 | $91.59 |
CARP0715-007 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT (Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.) | $58.84 | $35.06 | $93.90 |
ELEC0269-017 Effective 01/05/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN AND CABLE SPLICER: INCLUDES LOW VOLTAGE WIRING (BURLINGTON COUNTY (NORTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, INCLUDES MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, INCLUDES NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE)) | $63.82 | $41.99 | $105.81 |
ELEC0351-001 Effective 09/30/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN AND CABLE SPLICER (ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES) | $55.05 | $48.76 | $103.81 |
| ELECTRICIAN: CABLE SPLICER ON LEAD CABLE (ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES) | $45.51 | $34.39 | $79.90 |
ENGI0825-020 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 | $94.09 |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR (2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 | $95.72 |
| SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 | $97.63 |
| SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 | $99.22 |
IRON0399-005 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 | $92.64 |
| IRONWORKER: REINFORCING | $53.24 | $38.40 | $91.64 |
LABO0077-002 Effective 05/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 | $66.72 |
LABO0077-004 Effective 05/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, LANDSCAPE LABORER, PIPELAYER, POWER TOOLE OPERATOR AND SCREEDMAN | $35.75 | $30.22 | $65.97 |
PAIN0021-032 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER (BURLINGTON COUNTY (south of a line drawn between these cities: Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Work at 30 ft. above the working surface, or on a swing stage: $1.00 per hour additional | $49.96 | $35.11 | $85.07 |
PAIN0711-011 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER (BURLINGTON COUNTY (north of a line drawn between these cities: Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Work welding or using a cutting torch: $1.00 per hour Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet: $1.00 per hour additional | $52.68 | $31.29 | $83.97 |
PAIN0711-018 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| DRYWALL FINISHER/TAPER | $44.87 | $30.15 | $75.02 |
PAIN0711-019 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (SPRAY) | $45.55 | $29.86 | $75.41 |
| PAINTER (BRUSH & ROLLER) | $45.55 | $29.86 | $75.41 |
PLAS0592-036 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $53.21 | $33.42 | $86.63 |
PLUM0009-015 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 TO Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line) | $59.57 | $46.45 | $106.02 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 to Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line) | $59.57 | $46.45 | $106.02 |
| PLUMBER: SERVICE AND REPAIR (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 TO Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line) | $46.23 | $29.23 | $75.46 |
| PIPEFITTER: SERVICE AND REPAIR (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 to Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line) | $46.23 | $29.23 | $75.46 |
PLUM0322-008 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, DOES NOT INCLUDE BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, DOES NOT INCLUDE THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530, DOES NOT INCLUDE Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Rd. to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line) | $56.30 | $50.76 | $107.06 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, DOES NOT INCLUDE BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, DOES NOT INCLUDE THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530, DOES NOT INCLUDE Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Rd. to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line) | $56.30 | $50.76 | $107.06 |
SFNJ0669-006 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $59.19 | $36.51 | $95.70 |
SFNJ0692-002 Effective 05/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) (WITHIN 15 MILES BEYOND THE CITY LIMITS OF PHILADELPHIA) | $60.83 | $30.34 | $91.17 |
SHEE0027-009 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $59.08 | $47.06 | $106.14 |
SUNJ2004-003 Effective 01/02/2009 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER | $42.33 | $0.00 | $42.33 |
| LABORER: COMMON OR GENERAL | $19.27 | $12.42 | $31.69 |
TEAM0469-003 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| zone requiring Level A, B or C personal protection: TRUCK DRIVER: DUMP TRUCK (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site where the worker is not working in a PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas VACATION PAY CREDIT: Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours) | $48.63 | $42.66 | $91.29 |
| zone requiring Level A, B or C personal protection: TRUCK DRIVER: OFF THE ROAD TRUCK (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site where the worker is not working in a PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas VACATION PAY CREDIT: Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours) | $48.78 | $42.66 | $91.44 |
TEAM0676-002 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: OFF THE ROAD TRUCK (BURLINGTON COUNTY (WEST OF THE LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required: $1.00 per hour SHIFT WORK: An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday BEREAVEMENT PAY: In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays | $44.65 | $34.11 | $78.76 |
| TRUCK DRIVER: DUMP TRUCK DRIVERS (BURLINGTON COUNTY (WEST OF THE LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required: $1.00 per hour SHIFT WORK: An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday BEREAVEMENT PAY: In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays | $44.30 | $34.11 | $78.41 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/30/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in New Jersey.
Get notified when NJ20260027 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.